Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Review of Ventilation Optimisation Strategies During Longwall Moves

    By H W. Wu

    Occupational exposure limits for diesel particular matter (DPM) are progressively being adopted in a number of countries. Many of these follow the lead of the US Mine Safety and Health Administration

    Aug 31, 2015

  • AUSIMM
    Gold Deposits in Highly Metamorphosed Terranes

    By A G. Tomkins

    "Approximately 32 per cent of the worldÆs total gold production has come from greenstone belts (Frimmel, 2008). In these regions numerous small to large, quartz vein-associated gold deposits are hoste

    Sep 26, 2013

  • AUSIMM
    Application of Heterogeneity Testing to Coarse Gold Ores

    By S C. Dominy, R C. A Minnitt

    Determination of the sampling constant and liberation diameter are of importance when applying the Fundamental Sampling Error (FSE) equation to optimise sampling protocols. The method for the direct d

    Aug 21, 2012

  • AUSIMM
    Geotechnical Management at the AGL Loy Yang Mine

    By S Cyphers, J Missen, B Jansen

    The AGL Loy Yang Mine is one of the largest and most significant coalmines in Australia. Commencing in 1982, this mine produces 30–35 Mt/a to supply more than 50 per cent of Victoria’s electrical powe

    Nov 5, 2014

  • AUSIMM
    Modelling Blast Movement for Grade Control at an Open Cut Gold Mine

    By E J. Sellers, A Cocker

    Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref

    Aug 18, 2014

  • AUSIMM
    Technology and Equipment for X-Ray Radiometric Sorting of Secondary Metallic Raw Materials

    By Satayev IS, Shepelev DV

    Various ways for applying the X-ray fluorescent method to process lump-by lump separation of secondary aluminium raw materials (scrap, slags, waste) as well as ferrosilicon and ferrochromium are bei

    Jan 1, 1993

  • AUSIMM
    The Case for an International Mining Law

    State ownership of minerals results in domestic legislation regulating mining operations. The mining industry today is dominated by a number of transnational companies, each subject to internal and ex

    Jan 1, 2004

  • AUSIMM
    KEYNOTE: Upgrades, Modernisations and Expansions Where Will the Expertise, Capability and Skills Come from in the Future?

    By J King, T Hunter, R Coleman

    "The industry that supports operations and new projects is suffering a rapid decline in the currently severely curtailed capital investment environment. This is evidenced by a decline in the number of

    Oct 10, 2016

  • AUSIMM
    An application of Monitoring and Numerical Modelling in Open Stope Mining

    By Thomson I. R R, Friday R. G, Palmer W. T

    The paper introduces the problems encountered in designing open stopes and briefly examines the factors that determine the final stope dimensions achieved after mining is completed. A case study is

    Jan 1, 1981

  • AUSIMM
    Structural Evolution of the McArthur Basin, NT

    By K A Plumb

    New structural studies in the Walker Fault Zone of eastern Arnhem Land are integrated with basin-wide reconnaissance observations, made to refine models for the structural evolution of the McArthur

    Jan 1, 1994

  • AUSIMM
    Underground rock bolt detection

    By B Liu, W J. Zhang, S Saydam, B Li

    Rock bolts are commonly used to reinforce ground in underground mining and civil tunnel environments. Rock bolts serve two main functions: i) they suspend large, loose blocks of ground, and ii) provid

    Nov 29, 2022

  • AUSIMM
    Using Process Safety Management to Manage Risk in Mineral and Metals Facilities

    This paper explores the use of a Process Safety Management (PSM) system to manage risk in the mineral processing and metallurgical refining industries. Important elements of a PSM system are described

    Jan 1, 2003

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Automating Communications between Laboratories and Mines – A Case from the Coal Industry

    By S Mundell, J Armstrong, M Evans

    "Automation is a common goal within the coal industry for reasons such as efficiency, reliability and sustainability. However, it requires standards and frameworks so business systems can communicate

    Aug 18, 2014

  • AUSIMM
    Consolidation and shear strength testing and stability analysis of coal mine spoil degraded to mud

    By L Bergin, D J. Williams, S Islam, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • AUSIMM
    BHP Port Hedland wind fence – innovations in dust control

    By R Peiffer, L van Wyk

    The Port of Port Hedland is the largest bulk export terminal in the world and is one of Australia’s most important pieces of economic infrastructure. BHP is the largest Port user to support the export

    Sep 18, 2023

  • AUSIMM
    Geometallurgy applied to small-scale mining: a case study

    By D Lozada, A Salazar

    Geometallurgy is a tool that, for more than a century, has been present in the implicit operations of mineral beneficiation. There’s a need to understand the characteristics of the material to be proc

    Aug 29, 2018

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    Hydraulic Backfilling At Homestake

    The hydraulic backfilling of mine tailings has proven very successful at the Homestake Mine in Lead, South Dakota. It allows greater versatility, selectivity and safety in mining. It has also mini

    Jan 1, 1973

  • AUSIMM
    Separation and enrichment of copper, nickel and cobalt from acidic leach solution of smelter slag using solvent extraction and selective precipitation

    By K Haga, G Danha, A Shibayama, L L. Godirilwe

    The hydrometallurgical separation and enrichment processes provide an effective way to selectively recover metals from relatively dilute multicomponent sulfuric acid leach solutions. The multicomponen

    Aug 24, 2022