Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Improving the Accuracy of Mine Site Water Balances through Improved Estimation of Run-off Volumes

    By A Woodley, N C. Kunz

    A mine site water balance is important for communicating information to interested stakeholders, for reporting on water performance and for anticipating and mitigating water-related risks through wate

    Nov 26, 2013

  • AUSIMM
    Modelling the Initial Pit Design - The First Step for Project Valuation

    By R Wolff

    One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal pric

    Jan 1, 2006

  • AUSIMM
    Adaptive and Intelligent Control of Cone Crushers

    By Bearman R. A, Parkin R. M

    In the comminution industry cone crushers are widely used for secondary and subsequent stages of size reduction. Traditionally cone crushers have been operated and monitored manually. Alteration of

    Jan 1, 1995

  • AUSIMM
    Simulation Model of Gas Injection Aided Dewatering in Underground Mining

    By Kesser Z, Vincze T

    The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha

    Jan 1, 1988

  • AUSIMM
    External Influences on Electronic Detonator Blasting Systems and how to Protect Against Such Influences

    By R van Wyk

    In today’s mining environment the use of heavy mechanical devices and other high-tech electronic devices like two-way radios, cellular phones and even automated mining systems, form a vital part of th

    Nov 8, 2011

  • AUSIMM
    A Fractal Approach for Mineral Breakage

    By J A. M Luz, A T. Bernardes

    HukkiÆs law is an empirical law, which does not take into account several events of energy loss during the fragmentation processes. Since experimental results are very difficult to obtain, for a large

    Sep 26, 2011

  • AUSIMM
    Conservation of South Australia Mining Heritage

    Many persons hold the opinion that the metal indus- ries are fortuitous and that the occupation is one of sordid toil, and altogether a kind of business requir- ing not so much skill as labour. But a

    Jan 1, 1987

  • AUSIMM
    Benefits of Advanced Technology in Underground Mining

    By M Edhammer

    In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants

    Mar 21, 2011

  • AUSIMM
    Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive control

    By A Price, D Okle, K Brooks

    The operation of flotation plants has been improved over the years by use of fundamentally based design techniques, a better understanding of reagent chemistry, online metal analysis and the use of di

    Aug 29, 2018

  • AUSIMM
    Fingerprinting and Signatures - Tracing Mine Impacts in Complex Aquatic Systems

    By C Bonini, A Markham, P Whittle, B Pearson

    "Mine-derived sedimentation in rivers can have significant impacts on the processes and features of the receiving environment and impact on communities reliant on this environment. However, identifyin

    Nov 26, 2013

  • AUSIMM
    Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, Australia

    By L Drowley

    The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons

    Mar 8, 2011

  • AUSIMM
    Dust Management - Thinking Outside the Square

    Dust emissions from mining, material processing and ship loading operations (fugitive dust sources) are an environmental issue of increasing concern to both government regulators and the community. Th

    Jan 1, 2009

  • AUSIMM
    Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting Mineralisation

    By R O’Sullivan, D Taylor, J G. McLellan, B Miller

    The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire

    Aug 18, 2014

  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • AUSIMM
    Bubble Size Effect on the Dynamic Adsorption of Frothers and Collectors in Flotation

    By G M. Evans, C M. Phan

    This paper presents an analysis on the dynamic adsorption of frothers and collectors onto air bubbles in flotation. The analysis was carried out using the theory on the surfactant transfer by diffusio

    Jan 1, 2005

  • AUSIMM
    Guidelines for Selecting Pellet Plant Technology

    By J Bolen, I Cameron, M Huerta, M Okrutny, K O’Leary

    As greater amounts of fine iron ore concentrates enter the marketplace, new investments in iron ore pelletising capacity are inevitable to deliver these concentrates to steel industry consumers. When

    Jul 13, 2015

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Leadership in Projects – A Recipe for Success

    By A A. Roberts, R F. Dewhirst

    "Extensive literature surveys, research in the project environment and personal experiences both within and consulting to project teams have revealed some consistent ‘people factors’ that contribute m

    Mar 8, 2016