Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case StudyBy R Carreau
The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately
Jan 1, 2003
-
Mining Network and the Security QuestionBy A Huebner, A Noack
Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc
Sep 26, 2011
-
Improving the Reliability of Stream Diversion Designs in Mine Closure Plans Using a Morphological ToolBy S Tjerry, S Szylkarski, B Willis-Jones, I Dubinski
Achieving relinquishment of mining sites is becoming increasingly difficult, with a study by Byrne (2013) estimating that out of a set of 73 mining and metals sites around the world, less than ten per
Jun 28, 2016
-
The Computational Modelling of Conveyor Belt Fires in Mine GalleriesBy D Giddings, S A. Silvester, S Pickerin
Underground fires represent a constant threat to the safety of underground personnel. Miners in the immediate vicinity may face intense heat, blinding smoke, toxic fumes, fall of ground and other dire
Jan 1, 2005
-
Using a Sustainability Assessment Framework to Achieve Enhanced Legacy OutcomesBy S R. Green, G D. Corder
The legacy issues from mining can, and have often, extended well beyond the closure of operations. However, conventional cost-benefit analysis provides little incentive to implement initiatives at the
Jul 10, 2012
-
Sample Preparation and Assaying of Coarse Gold OresA study was conducted to evaluate the effectiveness of the three types of sample grinders routinely used in the mining industry for the sample preparation of gold ores with particular emphasis placed
Jan 1, 1998
-
Modelling Geometallurgical Variability - A Case Study in Managing RiskBy S Khosrowshahi, A Weeks, W J. Shaw
"To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th
Sep 29, 2013
-
Managing continuous improvement of Mine to Mill begins with measurementBy J Loeb, R Ramanathan, H Ingham, P Cameron
Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd
Nov 8, 2021
-
Production at Lift 530 m of Tongkuangyu Copper MineBy K W. Bian, Y M. Liu
Tongkuangyu Copper Mine is currently the only mine in China employing block caving. It comprises two large orebodies known as the No 4 orebody and the No 5 orebody. They are approximately 50° in
May 9, 2016
-
Engineering the New Olympic Dam Backfill SystemBy A G. Grice
WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur
Jan 1, 2000
-
Chirano Gold Mine Expansion – A Case StudyBy S Ellis
In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr
Aug 8, 2011
-
A case study: how being ‘aware of now’ is making work safer at Telfer undergroundBy S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle
Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper
Mar 15, 2021
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012
-
Granite Related Copper-Gold Mineralisation in the Southern Mt Read Volcanics, Western Tasmania, AustraliaBy Cooke D, Large R
The Cambrian structure in the Mt Read Volcanics was produced by four deformational events: obduction of forearc-derived mafic/ultramalic complexes in the early Middle Cambrian, a middle Middle Cambr
Jan 1, 1997
-
Harnessing data complexity – how machine learning applies all project data for accurate resource modellingBy S Sullivan
A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in
Mar 22, 2022
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit EfficiencyBy F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011
-
Heat, Mass and Impulse Transport Analogies for Underground AirwaysBy Mousset-Jones P, McPherson M. J
Underground airways are characterized by irregular shape and uneven surfaces including large-scale natural roughness, fractures, and a super-imposed sand roughness. Swirls in the grooves of the wa
Jan 1, 1988
-
The Use of Integrated Web-Based Solutions in Productivity ImprovementBy P Cooper
Continuous improvement using six sigma methodologies commonly follows the DMAIC methodology of define, measure, analyse, improve and control. A key requirement in the use of this approach is to ensure
Jul 11, 2011
-
Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility StudyThe Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of appr
Jan 1, 2008
-
Eliminating Waste Streams on Synthetic Rutile Plants: Treatment of Electrostatic Precipitator Fume by Plant Acid EffluentBy M M. Collisson
The Synthetic Rutile (SR) plant operations, North Capel, produce electrostatic precipitator (ESP) fume and kiln scrubber residue. Typically ESP contains about 18 per cent Ti, 13 per cent Fe, 0.5 per c
Jan 1, 2001