Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil Waterways

    By M D. Melville, B C. T Macdonald, T D. W

    The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T

    Jan 1, 2003

  • AUSIMM
    Assessing the Feasibility of Constructing a Subsea Water Supply from the New Territories to Ma Wan Island ù Directionally Drill or Tunnel?

    By D Moy, T Carter

    This paper outlines the feasibility assessment conducted to explore the possibility of constructing two submarine water supply pipelines beneath the Ma Wan Channel in Hong Kong using either horizontal

    Jan 1, 1999

  • AUSIMM
    Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability

    By E Rubio, N Morales

    A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the

    Sep 26, 2011

  • AUSIMM
    Learning from Nuclear Waste Repository-Design: The Ground-Control Plan

    With mining development on hold and other underground works in a slowdown, the develop- ment of nuclear waste repositories takes center stage on the American rock engineering scene. Three repositor

    Jan 1, 1987

  • AUSIMM
    Predicting Machine Cutting and Cutter Wear Rates for Mining Applications

    By Trueman R

    If continuous mining systems are to be successfully applied in metalliferous mines then reliable models will be needed to predict rock cutting machine advance and tool wear rates for effective machi

    Jan 1, 1995

  • AUSIMM
    Jaguar Raisebore design using LiDAR for back analysis

    By R P. Varden

    This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi

    Mar 15, 2021

  • AUSIMM
    Environmental Blast Design and Effective Implementation

    By A B. Richards

    Effective control of blast vibration and flyrock requires that significant factors be identified and quantified, that the blast be designed to ensure both blasting efficiency and compliance with appli

    Jan 1, 2004

  • AUSIMM
    A geostatistical Approach to Coal Reserve Classification

    By Just GD, Gillies ADS

    There is an increasing need for reliable and comparable coal resource data and it is necessary to standardize the traditional classification procedures by quantifying the three basic evaluation crit

    Jan 1, 1987

  • AUSIMM
    Open Circuit Disc Balling At Hamersley's Dampieer Pelletizing Plant

    The considerations which led to the decision to_ install discs at the Dampier Pellet Plant of Hamer ley Iron Pty. Ltd. are described. Initial testwork showed that the ore could be ground dry in ope

    Jan 1, 1974

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    The successful deployment of a fatal risk system, designed for the front-line

    By C J. Pitzer

    The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine

    Mar 29, 2023

  • AUSIMM
    Platinum Wealth, Community Participation and Social Inequality in South AfricaÆs Royal Bafokeng Community û A Paradox of Plenty?

    By W Akpan

    The Royal Bafokeng community in South AfricaÆs North West Province represents a unique case in Sub-Saharan Africa in terms of its positioning in the natural resource economy. It receives royalties dir

    Jan 1, 2009

  • AUSIMM
    The Sorby Hills, W.A., Lead-Silver-Zinc Province

    By Lee RJ

    A significant basemetal province is recognised in the southern part of the Bonaparte Basin, Western Australia. Epigenetic stratabound carbonate hosted Pb-Ag-Zn mineral- isation occurs in dolomites

    Jan 1, 1986

  • AUSIMM
    Use of an on-line Moisture Meter to Investigate Product Moisture in Coal Preparation

    By Jensen B, Ofori P, He Y, White E, Stanmore B, Brien M, O&apos

    As part of a large AMIRA project, an on-line moisture meter was installed at two mine sites in Central Queensland. This project investigated the factors which control the moisture content of coarse (&

    Jan 1, 1995

  • AUSIMM
    Development of a Laboratory Flotation Method to Test Plant Mineral Aggregation

    By D Morgan, D Sato, B Lumsden, S Senanayake

    Laboratory flotation tests on fresh cyclone overflow samples are a useful tool to troubleshoot and indeed to improve plant performance; however, reproducibility between laboratory flotation test and p

    Sep 1, 2014

  • AUSIMM
    Project-Finance Risks ù Due Diligence Matters

    Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/

    Jan 1, 2007

  • AUSIMM
    A Review ù Pillar Stability Issues at DOZ Block Cave Mine

    By D Flint, O Rindriatmoko

    PT FreeportÆs Deep Ore Zone (DOZ) Mine is the latest block cave mine within the East Ertsberg Skarn System (EESS).Issues with undercutting and stress concentrations at the extraction level were experi

    Jan 1, 2005

  • AUSIMM
    Strategic Production Planning - The Economics of Managing Multiple Ore Sources

    Kambalda Nickel Mines (KNM) currently have eight operating underground mines, three on care and maintenance and other orebodies at various stages of development. Each operation differs greatly in sc

    Jan 1, 1995

  • AUSIMM
    Fuzzy Model of a Multigrade Structure for Support of Decision-Making and Management in Mineral Processing

    By M J. Pejovic, I Miljanovic, A Milutinovic4, T Benovic, A Petrovski

    The paper presents a model of a multigrade monitoring-management structure for support to decision making and management in real and extended time in mineral processing (MP). The model was created as

    Sep 26, 2011

  • AUSIMM
    Political and Social Aspects of Present and Future Tunnelling

    Our modern cities are almost incapable of sustaining themselves without subsurface infrastructure, which is not identifiable at first glance. This very soon becomes evident when the chaotic conditions

    Jan 1, 1999