Environmental and Social Constraints to Mineral Mining Projects – Finding the Key to Unlock the ResourceBy A M. Avis
This paper presents an overview of recent developments in the Environmental Impact Assessment (EIA) process to provide the background for a more detailed analysis of environmental and social constrain
Oct 5, 2011
-
Advanced Ventilation Control – An Analysis of Innovation and Environmental SustainabilityBy V S. Mutton, M J. Shearer
"The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G
Aug 31, 2015
-
Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity SettingBy D A. Williams, P J. Chapman
Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu
Jul 27, 2015
-
Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel SegmentsBy M Wieloch, D Wimpenny, M Chappell
Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in
Sep 17, 2014
-
Strategic short-term geotechnical designBy K T. Mandisodza, T J. Cartledge
The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d
Jun 22, 2022
-
Mapping and Prioritising Rehabilitation of Abandoned Mines in AustraliaBy A M. Lechner, V Glenn, M Edraki, D R. Mulligan, C Unger
With more than 50 000 recorded abandoned mines in Australia, effective management strategies are needed to prioritise and manage health, safety, environmental and socio-economic risks and opportunitie
Jul 10, 2012
-
Trigger Action Response Plans for Diesel Exhaust ExposuresBy J Jeffery, P G. Knott, F Velge, C Evans
A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.
Aug 31, 2015
-
Reconciliation of Orebody Model Predictions – System and PeopleBy T Burns, P Savory
In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data
Aug 18, 2014
-
MMG’s Australian Operating Model – the Implementation, Successes and LearningBy R M. S Watsford, M Davis
In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening
Jun 22, 2016
-
Mineralogy and Magnetic Susceptibility of the Proterozoic Granites, Related to Gold Mineralisation, Pine Creek Geosyncline, Northern Territory, AustraliaBy Z U Bajwah
During the Palaeoproterozoic, a large number of granitic intrusions were emplaced in the various parts of the Pine Creek Geosyncline (PCG). In the central region, the granitic magmatism is represent
Jan 1, 1994
-
Permanent Rockbolts - The Problems are in the DetailBy R Bertuzzi
Permanent rock bolts in civil engineering are taken as having to serve their design purpose for at least 50 years. In many projects the design life is specified as greater than 100 years. A review of
Jan 1, 1999
-
Flotation circuit efficiency improvement at Northern Star Resources Limited’s Kanowna Belle gold mineBy A Nugraha, H Thanasekaran, K Tatetdagat
The Kanowna Belle gold mine is located in the Eastern Goldfields of Western Australia, approximately 18 km north-east of Kalgoorlie. The processing plant is designed to process 2 Mt/y and has the capa
Aug 29, 2018
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
A Decision-making Framework for Water Supply and Flood Protection Options in Net Present Value TermsBy H J. J Boshoff, A J. Karrasch
Mine planners frequently face the challenge of mitigating the impact of climatic events on mining operations, such as floods and droughts. Specific water management infrastructure can be implemented t
Jun 28, 2016
-
Bulk carrier vessel tracking automation – the Dalrymple Bay use caseBy W Russell, P Wighton, J Franke
Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled
Nov 8, 2021
-
Brazil - Gold - 2000By Subrahmanyam T. V, Rao V. D
GOLD, the most important and highly coveted valuable metal, is being sought and exploited in almost all the geological environ- ments by the developed, developing and underdeveloped coun- tries of th
Jan 1, 1988
-
A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitationBy E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine
Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i
Jul 25, 2018
-
Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway ProjectBy W M. Tekano, T S. Coulter, N M. Hutt
The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell
Jan 1, 2003
-
A case study in managing a high consequence geotechnical risk in a Queensland coalmineBy K Young, M Martin, D Payne
This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor
Nov 29, 2022
-
An assessment of battery trolley systems’ performance in surface minesBy H Bao, M Nehring, M Kizil, P Knights
The mining sector, a notably energy-intensive industry worldwide, is a major consumer of fossil fuels, leading to significant carbon emissions globally. The move towards electrification, coupled with
Sep 1, 2024