Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Environmental and Social Constraints to Mineral Mining Projects – Finding the Key to Unlock the Resource

    By A M. Avis

    This paper presents an overview of recent developments in the Environmental Impact Assessment (EIA) process to provide the background for a more detailed analysis of environmental and social constrain

    Oct 5, 2011

  • AUSIMM
    Advanced Ventilation Control – An Analysis of Innovation and Environmental Sustainability

    By V S. Mutton, M J. Shearer

    "The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G

    Aug 31, 2015

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Mapping and Prioritising Rehabilitation of Abandoned Mines in Australia

    By A M. Lechner, V Glenn, M Edraki, D R. Mulligan, C Unger

    With more than 50 000 recorded abandoned mines in Australia, effective management strategies are needed to prioritise and manage health, safety, environmental and socio-economic risks and opportunitie

    Jul 10, 2012

  • AUSIMM
    Trigger Action Response Plans for Diesel Exhaust Exposures

    By J Jeffery, P G. Knott, F Velge, C Evans

    A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.

    Aug 31, 2015

  • AUSIMM
    Reconciliation of Orebody Model Predictions – System and People

    By T Burns, P Savory

    In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data

    Aug 18, 2014

  • AUSIMM
    MMG’s Australian Operating Model – the Implementation, Successes and Learning

    By R M. S Watsford, M Davis

    In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening

    Jun 22, 2016

  • AUSIMM
    Mineralogy and Magnetic Susceptibility of the Proterozoic Granites, Related to Gold Mineralisation, Pine Creek Geosyncline, Northern Territory, Australia

    By Z U Bajwah

    During the Palaeoproterozoic, a large number of granitic intrusions were emplaced in the various parts of the Pine Creek Geosyncline (PCG). In the central region, the granitic magmatism is represent

    Jan 1, 1994

  • AUSIMM
    Permanent Rockbolts - The Problems are in the Detail

    By R Bertuzzi

    Permanent rock bolts in civil engineering are taken as having to serve their design purpose for at least 50 years. In many projects the design life is specified as greater than 100 years. A review of

    Jan 1, 1999

  • AUSIMM
    Flotation circuit efficiency improvement at Northern Star Resources Limited’s Kanowna Belle gold mine

    By A Nugraha, H Thanasekaran, K Tatetdagat

    The Kanowna Belle gold mine is located in the Eastern Goldfields of Western Australia, approximately 18 km north-east of Kalgoorlie. The processing plant is designed to process 2 Mt/y and has the capa

    Aug 29, 2018

  • AUSIMM
    Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations

    By D Kent, J Bullock, M Wilkinson

    Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su

    Oct 16, 2017

  • AUSIMM
    A Decision-making Framework for Water Supply and Flood Protection Options in Net Present Value Terms

    By H J. J Boshoff, A J. Karrasch

    Mine planners frequently face the challenge of mitigating the impact of climatic events on mining operations, such as floods and droughts. Specific water management infrastructure can be implemented t

    Jun 28, 2016

  • AUSIMM
    Bulk carrier vessel tracking automation – the Dalrymple Bay use case

    By W Russell, P Wighton, J Franke

    Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled

    Nov 8, 2021

  • AUSIMM
    Brazil - Gold - 2000

    By Subrahmanyam T. V, Rao V. D

    GOLD, the most important and highly coveted valuable metal, is being sought and exploited in almost all the geological environ- ments by the developed, developing and underdeveloped coun- tries of th

    Jan 1, 1988

  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project

    By W M. Tekano, T S. Coulter, N M. Hutt

    The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell

    Jan 1, 2003

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    An assessment of battery trolley systems’ performance in surface mines

    By H Bao, M Nehring, M Kizil, P Knights

    The mining sector, a notably energy-intensive industry worldwide, is a major consumer of fossil fuels, leading to significant carbon emissions globally. The move towards electrification, coupled with

    Sep 1, 2024