Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    RISKGATE« - A Case Study in Application to Fires on Mobile Plant

    By J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott

    Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address

    Sep 18, 2012

  • AUSIMM
    Planning revegetation for relinquishment

    By S D. Fox, P B. Swart

    Statistics showing that mine rehabilitation is falling behind rates of disturbance continue to be reported in the media. Unfortunately, most reported statistics do not account for the large growth-cyc

    Jul 25, 2018

  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021

  • AUSIMM
    Maintaining the Practical Component in Mining Engineering Education Programmes

    By M Kizil

    Mining Engineering Degree programs have traditionally had a practical emphasis and have been highly vocational in nature. However, over the years, there has been an increasing attention to the more sc

    Jan 1, 2002

  • AUSIMM
    Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.

    By Fallins J

    THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately

    Jan 1, 1930

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI approach

    By N Patel, S Narendranathan, T Mok, J Lowe

    The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners

    Aug 2, 2023

  • AUSIMM
    Electrification and use of Electric Hydraulic Equipment at Mount Lyell

    In 1972, with the West Lyell Open Pit winding down, mining operations transferred underground. All development tunnelling until the end of the decade was carried out by a fleet of ten pneumatic Jumbos

    Jan 1, 1985

  • AUSIMM
    Computer-Based Remote Control of a Highwall Mining System

    By Lewis W. H, Leigh M. C, Mayercheck W. D

    The U. S. Department of Interior's Bureau of Mines, in conjunction with a cooperator in the U. S. A., are developing a new highwall mining system (HMS) for coal extraction in unreclaimed and

    Jan 1, 1988

  • AUSIMM
    Design, implementation and field performance of a face destress blasting method for mine development

    By E Villaescusa, C Drover, I Onederra

    Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at

    Nov 29, 2022

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Health, Safety and Sustainability

    By D Cliff, K Bailey

    Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im

    Nov 20, 2012

  • AUSIMM
    The Impact of a Derelict Base Metal Mine on the Aquatic Environment

    By McIlveen GR

    The water pollution hazard posed by the derelict Conrad mine site, to the water and associated stream sediment of Borah and Maids Creeks and the nearby Copeton Dam storage, has been assessed. Mine w

    Jan 1, 1988

  • AUSIMM
    New Continuous Production System in Block Cave Mining – the Rock Flow System

    By M Frenzel

    At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu

    May 9, 2016

  • AUSIMM
    Setting new standards at Kanmantoo – effective grade control procedures

    By M Reid, H Arbon

    Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an

    Sep 20, 2017

  • AUSIMM
    Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels

    By R Lau

    The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres

    Mar 8, 2011

  • AUSIMM
    Deformation History and the Formation of Auriferous Quartz Veins in the Warratta and Mount Poole Inliers, Northwestern New South Wales, Australia

    The Warraua and Mount Poole Inliers form part of a discontinuous series of basement complexes in the northwestern corner of New South Wales. The Inliers comprise mainly clastic sediments of low metamo

    Jan 1, 1992

  • AUSIMM
    The Need for Specification Development in Australian Road Tunnels

    By T Brown

    Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty

    Mar 8, 2011

  • AUSIMM
    The Use of Rezoning Techniques to Model Historic Tailings Failures

    By D Reid

    Run-out analyses of tailings storage facilities are typically undertaken using methods based on rheological theory. These are reasonable techniques to model the behaviour of tailings that, through sig

    Jul 27, 2015

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011