Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RISKGATE« - A Case Study in Application to Fires on Mobile PlantBy J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott
Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address
Sep 18, 2012
-
Planning revegetation for relinquishmentBy S D. Fox, P B. Swart
Statistics showing that mine rehabilitation is falling behind rates of disturbance continue to be reported in the media. Unfortunately, most reported statistics do not account for the large growth-cyc
Jul 25, 2018
-
Challenging the Norms Time Usage Model – Mobile Underground Mining EquipmentBy R Ballantyne, M Adams
Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the
Mar 15, 2021
-
Maintaining the Practical Component in Mining Engineering Education ProgrammesBy M Kizil
Mining Engineering Degree programs have traditionally had a practical emphasis and have been highly vocational in nature. However, over the years, there has been an increasing attention to the more sc
Jan 1, 2002
-
Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.By Fallins J
THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately
Jan 1, 1930
-
The critical pool levels for the Yallourn Mine determined using the MGRI approachBy N Patel, S Narendranathan, T Mok, J Lowe
The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners
Aug 2, 2023
-
Electrification and use of Electric Hydraulic Equipment at Mount LyellIn 1972, with the West Lyell Open Pit winding down, mining operations transferred underground. All development tunnelling until the end of the decade was carried out by a fleet of ten pneumatic Jumbos
Jan 1, 1985
-
Computer-Based Remote Control of a Highwall Mining SystemBy Lewis W. H, Leigh M. C, Mayercheck W. D
The U. S. Department of Interior's Bureau of Mines, in conjunction with a cooperator in the U. S. A., are developing a new highwall mining system (HMS) for coal extraction in unreclaimed and
Jan 1, 1988
-
Design, implementation and field performance of a face destress blasting method for mine developmentBy E Villaescusa, C Drover, I Onederra
Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at
Nov 29, 2022
-
In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case studyBy K Grohs, A Satriawan, S R. Pearce
Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi
Aug 2, 2023
-
Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and ExecutionBy N Elith
The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st
Nov 8, 2011
-
Health, Safety and SustainabilityBy D Cliff, K Bailey
Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im
Nov 20, 2012
-
The Impact of a Derelict Base Metal Mine on the Aquatic EnvironmentBy McIlveen GR
The water pollution hazard posed by the derelict Conrad mine site, to the water and associated stream sediment of Borah and Maids Creeks and the nearby Copeton Dam storage, has been assessed. Mine w
Jan 1, 1988
-
New Continuous Production System in Block Cave Mining – the Rock Flow SystemBy M Frenzel
At the last MassMin Conference in Sudbury, Caterpillar’s vision of a continuous mining concept for block caving operations was presented on the background of global raw material demand and its continu
May 9, 2016
-
Setting new standards at Kanmantoo – effective grade control proceduresBy M Reid, H Arbon
Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an
Sep 20, 2017
-
Possible Improvements to Current Design Practices in Fire Safety Design for Road TunnelsBy R Lau
The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres
Mar 8, 2011
-
Deformation History and the Formation of Auriferous Quartz Veins in the Warratta and Mount Poole Inliers, Northwestern New South Wales, AustraliaThe Warraua and Mount Poole Inliers form part of a discontinuous series of basement complexes in the northwestern corner of New South Wales. The Inliers comprise mainly clastic sediments of low metamo
Jan 1, 1992
-
The Need for Specification Development in Australian Road TunnelsBy T Brown
Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty
Mar 8, 2011
-
The Use of Rezoning Techniques to Model Historic Tailings FailuresBy D Reid
Run-out analyses of tailings storage facilities are typically undertaken using methods based on rheological theory. These are reasonable techniques to model the behaviour of tailings that, through sig
Jul 27, 2015
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011