Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Glass Sand Industry in Australia: Production, Processes and Markets (b11bdfa0-ef26-4950-bf21-8765ff14b0ec)

    By Richards RG

    The Australian glass sand industry produces some 2.8 million tonnes per annum of silica sand, of which about 2.0 million tonnes are exported and the rest is for the domestic market. Approximate produc

    Jan 1, 1990

  • AUSIMM
    The Spatial Distribution of Grade

    By S Vearncombe

    SpaDiSÖ is a revolutionary approach to the spatial analysis of point data using geometry to analyse geometry! SpaDiSÖ uses each and every spatial relationship and is not dependent on mathematical mode

    Jan 1, 2000

  • AUSIMM
    Unravelling the adsorption modes of flotation reagents by atomistic simulations

    By J Lainé, M Badawi, A C. de Araujo, Y Foucaud, C Veloso

    Flotation is the one of the most used techniques for the mineral separation of non-ferrous ores worldwide. However, the increase of the complexness along with the decrease of ores liberation sizes oug

    Aug 24, 2022

  • AUSIMM
    Application of Infrared Spectral Data for Predictive Modelling of Alteration-Mineralisation Systems

    By S Pontual

    The use of spectral data has traditionally been for obtaining mineral information and for mapping out alteration systems. The output from these data is typically in the form of mineral assemblages and

    Aug 22, 2011

  • AUSIMM
    Recent Operation at Harima Works

    By Kadoya H, Kondo Y

    The Harima works were established in 1964 and started operation in 1966. The initial capacity was 3500 t/month of zinc and 1500 t/month of lead. Until 1990 a lot of improvements had been made and th

    Jan 1, 1993

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Foreword (7965683f-3b26-4771-bc18-123c6df66373)

    In late 1984, Council of the Australasian Institute of Mining and Metallurgy accepted a proposal to establish a Mineral Heritage Committee. This was to be involved in matters relating to mineral he

    Jan 1, 1987

  • AUSIMM
    Subsidence and Strata Control Under Stored Waters in the Southern Coalfield New South Wales

    By Kennerley P

    A significant part of the reserves of the Southern Coalfield lie beneath major water storages and their impounding dam structures. One of the functions of the NSW Government's Dams Safety Com

    Jan 1, 1986

  • AUSIMM
    Planning Effective Management of Gas Emissions in an Underground Coalmine

    By D J. Black

    The process of excavating and mining coal causes fractures in the overlying and underlying strata. The fractures provide pathways for gas released from coal seams and other gas-bearing strata to flow

    Jun 28, 2016

  • AUSIMM
    Surface and Near Surface Gold at Vunda, Fiji

    Surface and near surface particulate gold occurs sporadically over an area of some60 km2 between Vunda and Navilawa on the west coast of Viti Levu, Fiji.Background grades of 0.01 ppm can be found in t

    Jan 1, 1984

  • AUSIMM
    Construction and Maintenance of Underground Mine Roads

    By Seedsman R. W

    Good roads are essential in moving men and materials to and from the underground workplace. Coffey Partners International Pty Ltd (Coffey) has recently completed a underground coal industry funded p

    Jan 1, 1995

  • AUSIMM
    Paste Backfill Production Using Canmet's Silo Technology

    By A Annor, L J. Chen

    The production of paste backfill has typically been accomplished through the adaptation of existing technology. Thickeners and disc filters have several drawbacks when applied to production of tailing

    Jan 1, 1998

  • AUSIMM
    Upgrading of the Mechanical Braking System of a Large Blair Multi-Rope Rock Hoist

    By J Harmse

    This paper deals with the modernisation of the brakes on an electrically coupled Blair multi-rope hoist and covers the removal of the old calliper brakes and hydraulic control system, and its replacem

    Jan 1, 2005

  • AUSIMM
    Classification And Quantification of Ore Grain Textures of the Hilton North Deposit, Mount Isa, Queensland, Australia

    Studying the ore textures in a discrete orebody is a novel approach to estimating liberation potential of the ore minerals present. As part of a PhD thesis, this project aims at classifying and quanti

    Jan 1, 1993

  • AUSIMM
    Sulphur and Lead Isotopic Studies of the Bottle Lake Massive Sulphide Deposits, Vancouver Island, B.C., Canada: Sources of the Ore Constituents in a Submarine Exhalative Environment.

    By Juras ST, Krouse RH, Godwin CI

    The Buttle Lake camp is in central Vancouver Island, southwestern British Columbia, Canada. The camp hosts world-class polymetallic volcanogenic deposits of Devonian, Frasnian age (370Ma). This paper

    Jan 1, 1990

  • AUSIMM
    Chemistry of Flotation

    Since its commercial in Australia at Broken Hill in the early part of the 20th century, the flotation process has grown to become the single most important minerals separation method available to

    Jan 1, 1984

  • AUSIMM
    A Novel Approach to Estimate the Gap Between theáMiddle- and Short-Term Plans

    By J Ortiz

    In almost all copper mining companies, mine planning is done considering different time frames, leading to long-term (life-of-mine) (LOM), medium-term (first three years) and short-term (first year, m

    Sep 26, 2011

  • AUSIMM
    Development, Simulation, Economic and Environmental Evaluation of a Coal Processing Flow Sheet

    By J Tien, J Huang, N Haque, M O’Brien

    Coal preparation is an integral part of producing coal for thermal powerplants and metallurgical processing plants. Coal processing plants use various unit processes to separate gangue and ash content

    Jun 28, 2016

  • AUSIMM
    Geometallurgical Modelling – A Mineral Processor's Perspective

    By A Stradling

    For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can

    Sep 5, 2011

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016