Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Effect Of Ore Pulp On The Adsorption Rate Of Gold Cyanide On Activated Carbon
By Linge H. G
The effect of the presence of ore pulp on the adsorption rate of gold on activated carbon has been studied. A substantial reduction in the rate occurs when the pulp is present. The reduction in ra
Jan 1, 1987
-
Evaluation of a Dragline-Hopper-Truck Mining System
By Dickerson A. W
The most important mining problem facing many of the established surface coal mines in the Bowen Basin area of Queensland is the rising cost of overburden stripping associated with increasing depths t
Jan 1, 1992
-
Development of Intensive Dore Silver Cupellation at Pasminco Metals - BHAS
By Thompson D, Burgess G. C
Subsequent to large scale trials in 1987, the installation of a submerged lance Sirosmelt furnace system was approved in late-1988 for the cupellation of retort bullion to dore silver. Commissioning
Jan 1, 1992
-
Mine Planning in a Phosphate Deposit
By Muge F, Pereira H
In the early stages of the planning of a new exploitation, the error in ore reserve estimation is an important factor that must not be disregarded. As this error can be computed by geostatistical m
Jan 1, 1977
-
A 29 MW Ice System for Mine Cooling
Projected cooling requirements for ERPM led to the first proposals for the large- scale use of ice for mine cooling in the early 1980's. Following successful research into ice conveying and ic
Jan 1, 1988
-
Water Control in Exhaust Ventilation Raises and Associated Fan Works
The Olympic Dam Mine is a large, mechanised, underground operation currently producing 2.2 million tonnes-per-year of copper/uranium/gold ore. The mine is accessed via one shaft and one service declin
Jan 1, 1992
-
The Introduction of Self Contained Self Rescuers into the South African Mining Industry
The Government Mining Engineer of South Africa has decided to legislate that Self Contained Self Rescuers (S.C.S.R.) become a mandatory piece of equipment for all those persons proceeding undergro
Jan 1, 1988
-
The Rehabilitation of Open Cut Coal Mines in the Bowen Basin, Queensland
The Bowen Basin of Central Queensland covers a total area of 3 200 000 ha. The Basin has proven reserves of about 24 000 000 tonnes of coking coal and steaming coal which constitutes about 70 perc
Jan 1, 1987
-
Risk Based Closure Engineering for Sustainability
By J M. Dwyer, S Williamson
Acceptable post-closure performance of decommissioned mining operations is a critical factor in persuading todayÆs environmentally conscious public that the mining industry will not continue to burden
Jan 1, 2003
-
Application Of In-The-Hole Hammer Drilling At The C. S. A. Mine, Cobar
The last two years have seen a rapid change-over from mechanised cut and fill. stoping to the more economic and productive long hole open stoping method, such that today more than 80 per cent of to
Jan 1, 1977
-
Australian Taxation Laws as they Relate to Investment in Pacific Rim
This paper deals with the Australian taxation laws, and in particular the income tax laws, as they apply to mineral exploration and development both in Australia and off-shore. The Australian tax
Jan 1, 1987
-
The Concept Of Drilling Supply And Service Contracts
Drilling is one of the most, significant cost components of any stoping or develop- ment operation. Two of the factors contri- buting to the drilling cost are the supply and servicing of consumable
Jan 1, 1977
-
Legal Certification of Mine Managers
The introduction of legal certification of mine managers is a matter of history. It was introduced as part of legislation for mine safety. It has been said that such legislat- ion was written in blo
Jan 1, 1980
-
Carbon-in-Pulp Testwork and Flowsheet Development
By Sehic OA
One aim of testwork and flowsheet development is to ultimately provide a reliable and flexible plant that is simple to operate and maintain. Testwork can indicate amenability of ores to CIP treatmen
Jan 1, 1982
-
Drillling Patterns and Ore Reserve Assessments
By Watson D. F
Armstrong's (1983) criticisms of PhiIip and Watson's (1982b) note on optimal drilling patterns are based on misinterpretation, supported by errors in geometry. Furthermore, Armstrong argues
Jan 1, 1984
-
Installation of an Underground Dispatch System and its Use in Business Performance Management Within OsborneÆs Mining Department
Within the Business Process Improvement Program initiated at Placer Dome during 2003 was the Business Performance Management Project (BPM).BPMÆ s aim has been to extract productivity improvements from
Jan 1, 2005
-
Mining and Processing of a Low Grade Gold Orebody in the Wau Valley, Papua New Guinea
Renison Goldfields Consolidated Limited (RGC) and Consolidated Gold Fields Plc (CGF) purchased New Guinea Goldfields Limited (NGG) in 1982 as an exploration venture. Following an intensive drillin
Jan 1, 1984
-
On the Planning of Underground Storage of Stormwater and Mechanical Boring of Sewer Shield Tunnelling in Tokyo
Tokyo Metropolitan Government designs the stormwater storage plans in underground, as a measure of flood control in completed urban district and improvement of combined sewarage system. This time,
Jan 1, 1987
-
How Ore Deposits can be Overestimated Through Computational Methods
By Watson DF
Calculation of the amount of metal in an ore deposit or mining block should be approached by multiplication and integration of appropriate numerical manifolds describing the spatial distribution of
Jan 1, 1987
-
Quantitative Assessment of Undiscovered Gold Endowment in Central and Western Victoria, Australia
By A Olshina, C Willman, D Moore
GeoScience Victoria has completed quantitative assessments of undiscovered gold endowment in the northern parts of the Bendigo and Stawell Zones. The under cover area in the Bendigo Zone (10 000 km2)
Jan 1, 2008