Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    The Highmont Concentrator Startup

    By R. S. Fukuhara, M. J. Allan

    "Highmont, a wholly owned subsidiary of Teck Corporation, operates a 25,000 ton/day mine and concentrator located in the Highland Valley of British Columbia. Construction of the plant commenced in the

    Jan 1, 1982

  • CIM
    New Circuits for the Treatment of Fine Grained Zinc/Lead Ore at the Sullivan Concentrator (6bee0d7e-0e76-4074-a289-b60e63163849)

    By R. S. Simkus, J. R. Egan

    "Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant test work conduct

    Jan 1, 1994

  • CIM
    Metallurgical Testing: Modeling Recovery versus Ore Grade

    By Manqiu Xu

    "Ore grades are decreasing and ore deposits are becoming more complex. In order to make a sound economical decision about a mining project, metallurgical testwork must be carried out. A few large “rep

    Jan 1, 2013

  • CIM
    Improving mining and minerals plant performance: operations and maintenance working together using new information technology

    Operations and maintenance departments have had a long-standing adversarial relationship. The widespread evolution and adoption of modern management techniques, such as reliability centered maintenanc

    Jan 1, 2009

  • CIM
    Mass Balances in Mill Metallurgical Operations

    By R. Tipman, T. C. Burnett

    "A general computer program has been written to calculate material balances using multiple regression techniques. The program can handle metal assays or size distribution data obtained in multiple sur

    Jan 1, 1978

  • CIM
    Gravity Concentration of Gold from Base Metal Flotation Mills

    By M. Ounpuu

    "Gold, because of low head grade and recovery, is usually of minor importance in the economics of base metal flotation mills. Because of the above little metallurgical attention is usually provided to

    Jan 1, 1992

  • CIM
    The Effect of Particle Production History on Gold Leaching

    By Jessica Egan, Daniel Hodouin, Claude Bazin

    "The recovery of gold by leaching is influenced by the size of the gold carrier particles and the chemical environment. Using the relationships between the leaching rate, infinite recovery and particl

    Jan 1, 2009

  • CIM
    Gold "Preg-Robbing" by Pyrite: Natural and Process Induced

    By Stephen L. Chryssoulis

    """Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l

    Jan 1, 1997

  • CIM
    Grinding Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of an SABC grinding circuit using CEET technology applied to grindability data produced from testing 100 samples and distributed across the blocks of a mine plan using

    Jan 1, 2007

  • CIM
    Process Safety Management

    By Ertugrul Alp

    Alp & Associates - Who We Are ?? Canadian consulting company (1999-?) ?? Principal Consultant: Dr. Ertugrul Alp, P.Eng. ?? Over twenty-five years experience serving the chemical, mining, pulp & pap

    May 1, 2008

  • CIM
    Centrifugal Concentration and Separation of Precious Ores

    By B. V. Knelson

    "GENTLEMEN:This paper will deal with centrifugal separation - theory and practical, and since the Knelson Concentrator is the only centrifugal concentrator with a properly fluidized bed, this paper wi

    Jan 1, 1985

  • CIM
    Adapting to Ore Characteristics at Lac des Iles Mine

    By Erin N. Legault-Seguin

    The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000

    May 1, 2009

  • CIM
    Reduction of Free Gold Losses in the Cleaner Circuit with the Installation of a Gravity Circuit at the Kemess Mine

    By Martin Froehling, Curtis Mohns, Rahim Rajwani, Michael Fullam

    "The Kemess mining and milling complex is operated by Northgate Minerals Corporation and is located in the mountains of north-central British Columbia, 430 kilometers northwest of Prince George. The c

    Jan 1, 2007

  • CIM
    Effect of Gravity Recovery on Overall Plant Recovery. Sadiola – A Case Study (998ef7ed-734f-4917-a31d-ff2d1cd09bd4)

    By Craig Naudé

    "An enhanced gravity concentrator was installed in conjunction with an Intensive Leach Reactor at the Sadiola plant in Mali last year and commissioned in Dec 2007.There has been much debate over the y

    Jan 1, 2009

  • CIM
    Enhancements in the interpretation of geochemical data using multivariate methods and digital topography

    By E. C. Grunsky, B. W. Smee

    "The development of low-cost, rapid multielement analytical techniques has generated large geochemical databases in many exploration programs. When a sampling program consists of several thousand samp

    Jan 1, 2003

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • CIM
    Paste Production Storage Mechanism (PPSM), a Major Advance in Solids Concentration Technology

    By Rudy Tenbergen, Dick Farmery, Jim Naylor

    "Paste backfill has replaced cemented rock fill as one of the components to improve ground · control and mine safety at the Macassa Operation of Kinross Gold Corporation in Kirkland Lake, Ontario. It

    Jan 1, 1997

  • CIM
    Design & Development of the Barmac Rotopactor

    By Bryan A. Bartley

    "Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla

    Jan 1, 1985

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009