Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Experience in the Low Pressure Casting in Printed Molds of a Thin Bladed Aluminum A356 Impeller

    By G. Morin, F. Chiesa, B. Tougas, B. Duchesne, Jocelyn Baril, N. Giguère

    "An aluminum A356 compressor impeller was sand cast using the Low Pressure technique. The casting was limited in size (170 mm in diameter, 1.2 kg in weight) and very intricate in shape thus making 3D

    Jan 1, 2018

  • CIM
    A New Era in Pressure Hydrometallurgy

    By Fathi Habashi

    A new era in pressure hydrometallurgy is marked when the roasting - leaching - electrowinning process in the zinc industry was replaced by direct pressure leaching of zinc concentrate. Since then, the

    Jan 1, 2014

  • CIM
    Experimental Studies of the Solubilities of Aluminum Oxy-Hydroxy Phases to 300 °C

    By D. J. Wesolowski, D. A. Palmer, P. Bénézeth, S. Hilic

    The equilibrium solubilities of gibbsite, Al(OH)3, and boehmite, A1OOH, have been extensively studied in our laboratory from 30 to 90°C, and 100 to 300°C, respectively, to ionic strengths of 5 mol.kg-

    Jan 1, 2004

  • CIM
    Control of Iron in the Hudson Bay Zinc Pressure Leach Plant

    By S. Shairp

    The first commercial application of the Dynatec two-stage zinc pressure leach process commenced operation at the metallurgical complex of Hudson Bay Mining and Smelting Co., Limited in Flin Flon, Mani

    Jan 1, 2006

  • CIM
    Enhancing Bacterial Activity in a Uranium Mine

    By D. W. Duncan, A. Bruynesteyn

    Acidic mine waters containing solubilized uranium have been observed in many uranium and some copper mines. In every case, the sulphide and iron oxidizing bacterium, Thiobacillus ferrooxidans, was als

    Jan 1, 1971

  • CIM
    Welding -A Useful Maintenance Tool

    By H. Thomasson

    This paper will deal with on-site maintenance welding using the stick electrode, electric arc process. It is primarily concerned with the underlying principles, the application of which, or the lack o

    Jan 1, 1967

  • CIM
    Predictive Modeling For In Situ Recovery Operation

    By Gwenaële Petit, Ulan Massimkhanov, Gilles Joubert

    For its Zuuvch Ovoo uranium deposit in Mongolia, Badrakh Energy (partly owned by Orano Mining) is working on the prefeasibility study for exploitation by ISR (in situ recovery). As part of this projec

    Jan 1, 2020

  • CIM
    The Behaviour of As(III) and As(V) During the Precipitation of Alunite at 98°C

    By J. E. Dutrizac, Alba Sunyer

    The factors affecting the precipitation of arsenic-free alunite (KAl3(SO4)2(OH)6) were investigated in a series of laboratory experiments. Although the amount of alunite precipitated increased with in

    Jan 1, 2011

  • CIM
    Application of Sodium and Biogenic Sulphide for Copper Precipitation in a Continuous Reactor

    By Isabel C. B Rodrigues, Flávia D. Reis, Versiane A. Leão, Rosa M. F. Lima

    Attention has been focused in recent decades upon the precipitation of metal sulphides from acid mine drainage (AMD) and pregnant leach solutions, due to the advantages of the sulphide precipitation p

    Jan 1, 2014

  • CIM
    Iron Control and Management in the Zinc Industry

    Iron control and iron residue management and disposal are significant issues in all zinc production processes. This paper briefly reviews the most important primary zinc production routes and discusse

    Jan 1, 2006

  • CIM
    Building on Canadian Capabilities for Space Resource Missions

    By John Ratti

    Building on Canadian Capabilities for Space Resource Missions: Space resource science and technology mission building blocks Canadian historical perspective Status and future pursuits It takes

    May 1, 2013

  • CIM
    A Comparison of Bubble Rise Velocity Profile of two Surfactants to Explain Gas Holdup Data

    By A. A. Rafiei, J. A. Finch

    A previous study comparing n-pentanol and the polyglycol Fl50 showed that the two reagents could give the same gas holdup but with different size bubbles. The finding implies that bubble rise velocity

    Jan 1, 2009

  • CIM
    Pre-Concentration of Platinum Group and Base Metal Ores by Dense Medium Separation

    By L. Jones, S. R. Lawrence, A. R. Holloway

    Whilst dense medium separation is best known for its ability to concentrate diamond and coal deposits, the process is now being employed in southern Africa as a pre-concentration step to improve the e

    Jan 1, 2009

  • CIM
    Model Predictive Control as a Tool for Production Ramp-Up and Optimization at the Nkomati Nickel Mine (f9e698a2-cbdb-4f4f-bd3e-792b4bb440cd)

    By K. Becerra, D. G. Almond, T. D. Maru

    "Nkomati Nickel Mine in South Africa processes one of the world’s hardest ores in a 375k TPM autogenous grinding circuit. The plant employs an unconventional processing circuit, comprising a primary a

    Jan 1, 2012

  • CIM
    Flotation Improvements at Placer Dome's Campbell Mine

    By J. A. Folinsbee, Andre Robitaille, Tony Y. Chong

    "Conventional crushing and grinding is followed by gravity concentration to recover free milling gold. Refractory gold, finely disseminated within the pyrite and arsenopyrite matrix, is recovered by f

    Jan 1, 1998

  • CIM
    Bulk Commodity Characterisation for Transportable Moisture Limit Determination

    By Ralph J. Holmes, David McCallum, Alan Roberts, Rolando Orense, University of Auckland, Tobias Krull, Tom Honeyands, Kenneth Williams

    "The safe ocean transport of bulk commodities like iron ore, coal, nickel ore, manganese ore and bauxite by large bulk ships is vitally dependent on the stability of the cargo under the influence of w

    Jan 1, 2016

  • CIM
    Measuring Roof-Bolt Response to Axial and Shear Stresses: Laboratory and First in-situ Analyses

    By T. R. Kostecki, K. V. Jessu

    "Roof bolts are subjected to axial stresses, shear stresses, or both. Axial and shear stresses were compared between roof bolts machined with two and three slots. Shear stresses perpendicular to and a

    Jan 1, 2016

  • CIM
    Gas Well Hydrate Control by Sub-Surface Injection of Glycol

    By B. L. Moreau

    Certain gas wells tend to form hydrates in the production tubing. This paper outlines a method developed and used by the Author's company to overcome the problem. The injection of glycol to con

    Jan 1, 1958

  • CIM
    Life has no Limits. Purifying Water Mined from Asteroids for In Situ Resource Utilization

    By Laura Kelsey

    Contaminant Robust In Situ Water Extractor CRIWE Nafion-based water clean-up Extract purified water from natural extraterrestrial sources In situ water processing for downstream electrolysis

    May 1, 2013

  • CIM
    Syncrude's Low Energy Extraction Process: Commercial Implementation

    By S. Ng, Peter Stapleton, Paul Mankowski, J. Spence, R. Siy

    "Syncrude has developed a low energy extraction process for the recovery of bitumen from oil sand. This new process operates at a temperature of 25 °C, resulting in substantially lower energy costs an

    Jan 1, 1999