Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation
By E. Douglas, V. M. Malhotra
"This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine
Jan 1, 1989
-
The use of wetlands for effluent polishing at Placer Dome, Campbell Mine
By Benoit Bissonnette, David Gelderland
"The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi
Jan 1, 2003
-
Comparative Grinding Pilot Test of Grinding Balls vs. Balls/Mill Pebs Blend
By V. K. Alves, P. Lacoste-Bouchet
"In order to improve ball milling efficiency in pellet plants, Companhia Vale de Rio Doce (CVRD), experiments new technologies in Santa Luzia (M.G. – Brazil) research center facility. Pilot grinding t
Jan 1, 2005
-
Development of Oxidation Resistant Titanium Alloys by Niobium Addition
By G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers
The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li
Jan 1, 2014
-
The Oxygen Demand of Flotation Pulps
By F. Rosenblum, P. Spira
"Techniques were developed to determine the oxygen demand of sulphide ore pulps in the laboratory and in concentrators. The effect of variables which influence oxygen demand was studied, and it is sho
Jan 1, 1974
-
Goldstream Concentrator Design and Operation
By Stuart McTavish
"Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th
Jan 1, 1985
-
Towards Optimum Value in Underground Mine Scheduling
By Bryan M. Maybee
The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground
May 1, 2009
-
Horses for Courses – Tailoring Front End Design to Project Requirements
By Paul Staples, Paul Messenger, Greg Lane
"Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic
Jan 1, 2008
-
Concepts for Remote Mineral Projects
By L. J. Vincze
The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a
Jan 1, 1980
-
Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)
By Jean Cayouette
"In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi
Jan 1, 2002
-
Innovations in Gold and Silver Recovery: World Overview
By Hans von Michaelis
"INTRODUCTIONThe renaissance in gold and silver recovery technology has continued to unfold and it is appropriate to review some of the useful new technologies as well as try to identify some of the i
Jan 1, 1985
-
Optimizing Performance at the David Bell Mine Concentrator
By K. Meyer
"The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den
Jan 1, 1991
-
Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate
By A. Drouin, D. Lemieux, C. Chouinard
"A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t
Jan 1, 2017
-
Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment
The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca
May 1, 2009
-
The Marketing of Nickel
By K. H. J. Clarke
"ALTHOUGH nickel was not identified as a separate element until a Swedish scientist, Axel Frederick Cronstedt, did so in 17 51, its utilization dates from pre-historic times. From its humble beginning
Jan 1, 1960
-
A regressive mode of highwall failure in coal strip mines
By B. Stimpson, K. Kosar, K. Barron
"A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t
Jan 1, 1986
-
Environmental consequences of the placement of radium-barium sludge in tailings areas
By K. L. Murphy, G. Multamaki, P. M. Huck
"A preliminary evaluation, based on existing data, has been made of the implications of placing radium-barium sludge in tailings areas. The study was restricted to a consideration of possible increase
Jan 1, 1982
-
In Kiruna mineral processing starts underground - bulk sorting by LIF
By Åke Krukka, Heribert F. Broicher
"The iron ores of the Kiruna Mine in Sweden are of exceptional quality but for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low i
Jan 1, 2002
-
Optimization of the paste backfill plant at Louvicourt mine
By J. Cayouette
In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through
Jan 1, 2003
-
Advanced Control Decision Tree (46th Annual Canadian Mineral Processors Operators Conference© , Ottawa, Ontario, January 21-23, 2014)
By Michel Ruel
"This paper describes how to make advanced control choices when difficult processes need improvement. The decision-making process involves choosing between a rules-based approach and a model-based app
Jan 1, 2014