The use of wetlands for effluent polishing at Placer Dome, Campbell MineBy Benoit Bissonnette, David Gelderland
"The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi
Jan 1, 2003
-
Comparative Grinding Pilot Test of Grinding Balls vs. Balls/Mill Pebs BlendBy V. K. Alves, P. Lacoste-Bouchet
"In order to improve ball milling efficiency in pellet plants, Companhia Vale de Rio Doce (CVRD), experiments new technologies in Santa Luzia (M.G. – Brazil) research center facility. Pilot grinding t
Jan 1, 2005
-
The Oxygen Demand of Flotation PulpsBy F. Rosenblum, P. Spira
"Techniques were developed to determine the oxygen demand of sulphide ore pulps in the laboratory and in concentrators. The effect of variables which influence oxygen demand was studied, and it is sho
Jan 1, 1974
-
Development of Oxidation Resistant Titanium Alloys by Niobium AdditionBy G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers
The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li
Jan 1, 2014
-
Goldstream Concentrator Design and OperationBy Stuart McTavish
"Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th
Jan 1, 1985
-
Towards Optimum Value in Underground Mine SchedulingBy Bryan M. Maybee
The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground
May 1, 2009
-
Obtaining Maximum Value from Metallurgical Projects - Avoid Throwing it AwayBy A. Eltringham
Operations downstream of mining and beneficiation are still being subjected to increasing scrutiny as highly capitalized projects have been either slow to achieve their targets or have actually failed
Jan 1, 2011
-
Horses for Courses – Tailoring Front End Design to Project RequirementsBy Paul Staples, Paul Messenger, Greg Lane
"Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic
Jan 1, 2008
-
Concepts for Remote Mineral ProjectsBy L. J. Vincze
The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a
Jan 1, 1980
-
Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)By Jean Cayouette
"In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi
Jan 1, 2002
-
Innovations in Gold and Silver Recovery: World OverviewBy Hans von Michaelis
"INTRODUCTIONThe renaissance in gold and silver recovery technology has continued to unfold and it is appropriate to review some of the useful new technologies as well as try to identify some of the i
Jan 1, 1985
-
Optimizing Performance at the David Bell Mine ConcentratorBy K. Meyer
"The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den
Jan 1, 1991
-
Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite ConcentrateBy A. Drouin, D. Lemieux, C. Chouinard
"A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t
Jan 1, 2017
-
Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance AssessmentThe rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca
May 1, 2009
-
A regressive mode of highwall failure in coal strip minesBy B. Stimpson, K. Kosar, K. Barron
"A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t
Jan 1, 1986
-
Environmental consequences of the placement of radium-barium sludge in tailings areasBy K. L. Murphy, G. Multamaki, P. M. Huck
"A preliminary evaluation, based on existing data, has been made of the implications of placing radium-barium sludge in tailings areas. The study was restricted to a consideration of possible increase
Jan 1, 1982
-
The Marketing of NickelBy K. H. J. Clarke
"ALTHOUGH nickel was not identified as a separate element until a Swedish scientist, Axel Frederick Cronstedt, did so in 17 51, its utilization dates from pre-historic times. From its humble beginning
Jan 1, 1960
-
In Kiruna mineral processing starts underground - bulk sorting by LIFBy Åke Krukka, Heribert F. Broicher
"The iron ores of the Kiruna Mine in Sweden are of exceptional quality but for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low i
Jan 1, 2002
-
Optimization of the paste backfill plant at Louvicourt mineBy J. Cayouette
In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through
Jan 1, 2003
-
Advanced Control Decision Tree (46th Annual Canadian Mineral Processors Operators Conference© , Ottawa, Ontario, January 21-23, 2014)By Michel Ruel
"This paper describes how to make advanced control choices when difficult processes need improvement. The decision-making process involves choosing between a rules-based approach and a model-based app
Jan 1, 2014