Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • CIM
    Establishing a vegetative cover on base metal tailings-experience at Buchans, Newfoundland

    By Paul J. O'brien, George N. Neary

    "The base metal mine at Buchans, Newfoundland, has been producing since 1928. For many years, mill tailings were disposed of by dumping into a nearby natural watercourse via which they were transporte

    Jan 1, 1981

  • CIM
    Making money from wastes: a custom circuit within Clarabelle Mill

    By Alain Bouchard, Germain Labonté, Jim Barrett

    "Mill feed materials that are not run-of-mine ore are often a challenge for mineral processors and tend to accumulate in stockpiles, where they remain unprocessed for many years and become “slow movin

    Jan 1, 2002

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • CIM
    MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering Industry

    By Paul Miranda, Corby Anderson

    "The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res

    Jan 1, 2007

  • CIM
    A Pilot-Scale Treatment of coal Preparation Plant Effluent by the Selective Agglomeration Process

    The construction, commissioning and operation of a continuous pilot-scale selective agglomeration (oil agglomeration) unit are described. This plant has been used to recover fine coal from an effluent

    Jan 1, 1979

  • CIM
    Goldcorp’s Penasquito Pyrite Leach Project

    Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit

    Jan 1, 2017

  • CIM
    The Use of Charcoal as an Alternate Internal Fuel Addition in the Pelletising Process

    By Keith R. Vining

    Solid fuel, usually coke or anthracite, is commonly added to ground iron ore fines in the pelletising process to reduce the amount of burner fuel required and the maximum firing temperature, while mai

    May 1, 2007

  • CIM
    Simple Mechanisation of Narrow Vein Deposits in South Africa

    By Julian Wills

    The Candrill was developed with Soredem as a one-operator rockdrill for Canadian narrow vein mining. It provides the benefits of increased drilling rates, lower noise and vibration, mass reduction of

    Oct 1, 2001

  • CIM
    Analysis of results from a PFC measurement campaign

    By P. Desclaux, A. Gosselin

    "In 1999, PFC measurements were carried out at Alcan smelters as part of a large measurement campaign led by the Canadian Aluminium Association. Side worked prebake (SWPB) and horizontal stud Söderber

    Jan 1, 2002

  • CIM
    In Latin America: Decency and Dividends

    By C. W. Van Law

    WE have just heard a very able presentation, by Mr. J. C. Cameron, on the subject of Recent Trends in Labour Relations, as they exist today in Canada (l). With minor changes, what he said applies equa

    Jan 1, 1945

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    Corrosion Behaviour of Swellex Bolts in Underground Mining Environments

    By F. Charette

    The paper reviews recent investigations of the impact of corrosion on the performance of both plain and coated Swellex rock bolts. It addresses the problems associated with estimating and predicting c

    May 1, 2004

  • CIM
    Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern Ontario

    By A. H. Mumin, A. K. Somarin, K. S. Oran

    "Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake

    Jan 1, 2007

  • CIM
    Normetal Mine

    By W. L. Brown

    "The Normetal mine is about 7 miles east of the Ontario-Quebec boundary, and 13 miles north of the town of Dupuy on the Canadian National railway. The mine workings are largely on lots 44 and 45 in th

    Jan 1, 1954

  • CIM
    Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BC

    By Ed Beswick

    Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design

    May 1, 2008

  • CIM
    Stratigraphy and structural analysis of the North Gold Zone at Montauban-les-mines, Quebec

    By Jean-Marc Simard, Vincent Jourdain, Denis W. Roy

    "Seven lithologic units, informally characterized, were recognized in the vicinity of the Montauban orebody. The first five lie in stratigraphic order. From structural bottom to structural top these a

    Jan 1, 1987

  • CIM
    Understanding the Relationship: Bitumen Production and the Athabasca River

    Overview ?Oil Sands Background ?Water Use in Surface Mining ?Tailings Disposal ?Water Balance for Surface Mining ?Implications of Emerging Regulations ?Water Management Framework ?Tailings P

    May 1, 2009

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    Treatment of Talcose Molybdenite Ores

    By G. I. Mathieu, R. W. Bruce

    Flotation schemes for the separation of molybdenite from other minerals are based on utilizing the Inherent hydrophobicity of molygdenite (Fuerstenau1). This natural floatability was attributed to the

    Jan 1, 1974