Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Fording River Mine-an overview

    By P. J. Urso

    "This paper discusses the mining problems encountered at the Fording River coal mine to date, and how they have been solved. All of the production now comes from surface mining, but underground hydrau

    Jan 1, 1980

  • CIM
    Arsenic removal from gold processing waste waters: the potential ineffectiveness of lime

    By Kazuteru Tozawa, Robert G. Robins

    "The stability of calcium arsenate is discussed in relation to the possible misuse of lime in the treatment of gold processing waste waters. Stability diagrams have been derived and experimental resul

    Jan 1, 1982

  • CIM
    Modification of Conventional Thickener by Installation of Lamella Modules

    By I. Stanoev, V. S. Stoilov, I. Gradinarov, E. D. Visariev, I. A. Bonchev, Aurubis Bulgaria

    "Aurubis is the leading integrated copper group and the world’s largest copper recycler. In Copper smelter Aurubis Bulgaria (Pirdop), the residual copper in the slags from Flash furnace and Converters

    Jan 1, 2016

  • CIM
    A New On-stream Size Indicator PSI-200

    By M. Falutsu

    "The PSI-200 is a rugged, innovative, and easy to install on-stream size analyzer. Its calibration is simple and can be done on-line, during operation. Two measurements are displayed on the panel, whi

    Jan 1, 1993

  • CIM
    The H. B. Mine

    By W. T. Irvine

    "The H.B. Mine, a zinc-lead operation of the Consolidated Mining and Smelting Company of Canada Limited (Cominco), is in south central British Columbia, on Sheep Creek, a west-flowing branch of the Sa

    Jan 1, 1949

  • CIM
    Interpretation of airborne gamma ray spectrometry data from Sudbury, Ontario

    By W. M. Moon, Hugh G. Miller, C. -S. So

    "Digital image processing and enhancement techniques have been applied to airborne gamma ray spectrometry data from Sudbury, Ontario. These results have been correlated and compared with the available

    Jan 1, 1994

  • CIM
    The Role of Bacteria and the Addition of Pyrite During Leaching of Co(III) from Heterogenite

    By L. Zeka, I. Ndala, J. Frenay, S. Gaydardzhiev

    "Reductive leaching of cobalt (III) from a heterogenite bearing ore has been performed. Pyrite was added to the system and simultaneously bioleached in order to provide ferrous iron as reducing agent.

    Jan 1, 2016

  • CIM
    Development of Flowsheet and Reagent Scheme for the Treatment of Martison Lake Phosphate Niobium Ore

    By S. M. Bulataovic, D. M. Wyslouzil

    "The Martison Lake phosphate-niobium deposit is composed of unconsolidated residuum containing clay and silt-size particles of phosphate, niobium, iron and clay minerals. This paper deals with the lab

    Jan 1, 1986

  • CIM
    The Advantages of the Nemaska Electromembrane Process to Directly Produce Lithium Hydroxide

    By Jean-Francois Magnan

    "The old conventional process to produce lithium raw material dates from 1954 (CA patent #504477A). This process produces low purity lithium carbonate (Li2CO3) only. To obtain battery-grade carbonat

    Jan 1, 2016

  • CIM
    A Review of Current and Possible Practice in Copper Mineral Recovery by Froth Flotation

    By H. J. Hartjens

    "With the trend towards bringing into production ore bodies of lower and lower copper content every possible avenue of approach to achieve maximum copper metal recovery and keep milling costs to a min

    Jan 1, 1970

  • CIM
    Sustainable Standards for the Mining & Metallurgical Industry of the 21st Century

    By Denis J. Kemp

    The 20th Century saw changes in the mining and metallurgical industry not only technically but also in social and environmental expectations. As projects continue to become larger to maintain competit

    May 1, 2002

  • CIM
    Scorodite in the CESL Process for Copper-Arsenic Concentrates

    By K. Mayhew, A. Lossin, H. Salomon-de-Friedberg

    "The proportion of arsenic-bearing copper concentrates that supply the copper industry is on the increase. The current strategy of miners and smelters to blend feeds to reduce average arsenic levels

    Jan 1, 2016

  • CIM
    Slope Mass Rating (SMR) Geomechanics Classification: Thirty Years Review

    By R. Tomás, J. B. Serón, M. Romana

    The Slope Mass Rating (SMR; Romana, 1985) geomechanics classification was developed as a sequel of Bieniawski’s Rock Mass Rating (RMR) system, which was almost impossible to use in slopes due to the e

    Jan 1, 2015

  • CIM
    Heavy media cyclone circuits

    By J. Hoover

    "IntroductionThis chapter will discuss the operational and maintenance aspects of a heavy media cyclone circuits as applied to coal processing and using magnetite as the media. It deals with heavy med

    Jan 1, 1989

  • CIM
    Sampling Sand and Gravel Deposits for Backfill at Hollinger

    By M. D. Quinn

    THE sand and gravel used for backfilling at the Hollinger mine is obtained from deposits in a low range of hills some three miles north of the mine, where the Company owns a number of claims. The mate

    Jan 1, 1944

  • CIM
    The Railway's Part In Coal Mining

    By D. W. McDonald

    Coal mining and railway transportation are so closely en-twined and so dependent one upon the other that the failure of one would mean the total collapse of the other. With this indisputable fact in m

    Jan 1, 1924

  • CIM
    Cu-Au Skarn Mineralization, Minas de Oro District, Honduras, Central America

    By John Drobe, Robert M. Cann

    "Abstract - The Minas de Oro Cu-Au skarn and replacement deposits are located in the highlands of central Honduras, 90 km north-northwest of the capital of Tegucigalpa.The deposits formed in Cretaceou

    Jan 1, 2000

  • CIM
    Ground geophysical investigations over the Casmo molybdenite deposit

    By A. Sacit Saydam

    "Induced polarization/resistivity and magnetometer surveys have been carried out over the Casmo molybdenite deposit in mountainous terrain of northern British Columbia. Molybdenite occurs in quartz-be

    Jan 1, 1983

  • CIM
    Development and Implementation of an Expert System for Grinding Control at the Dome Mine

    By John Eggert, Paul Benford

    "Since 1982, Placer Dome Inc. -Dome Mine has steadily increased mill throughput. Tonnage has increased from a nominal design capacity of 3000 short tons per day, attained in 1985, to 4130 stpd by the

    Jan 1, 1994

  • CIM
    Soil profile development in vegetated uranium tailings (A Synopsis)

    By D. R. Murray

    "A promising long-term solution to uranium tailings reclamation has been the establishment of vegetation directly on the waste material. The soil profiles of areas vegetated for 0, 3, 8 and 10years ar

    Jan 1, 1984