Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Sustainable use of Geotechnical Data for Improved Mine Planning and Design Through Multi-Parametric Modeling

    By Andrew D. Lapworth

    The use of geological and grade models has been standard practice in mine design for many years now, with a wide range of software available to create and analyze the models. Although geotechnical par

    May 1, 2007

  • CIM
    Laminated Displacement Discontinuity Analyses for Estimating Stresses, Strain, Convergence and Subsidence During the Recovery of Safety Pillar at Soma Coal Field- Western TURKEY

    By C. Okay Aksoy

    In Turkey, the increasing demand for lignite has necessitated an increased emphasis on both lignite production and recovery. This emphasis has resulted in a gradual increase in the application of the

    May 1, 2004

  • CIM
    Light Stable Isotope Evidence for a Metamorphogenic Origin for Bedding-Parallel, Gold-bearing Veins in Cambrian Flysch, Meguma Group, Nova Scotia

    By Alan L. Sangster

    Auriferous, bedding-parallel veins occur in zones of carbonaceous, argillaceous and sulfidic turbidites in the Lower to Middle Cambrian sandy flysch of the Goldenville Formation. The 0348 values for v

    Jan 1, 1992

  • CIM
    Catalytic and Non-Catalytic CO oxidation on Au/TiO2 Catalysts

    By Jorge M. C. Soares

    The CO oxidation reaction has been studied on Au/TiO2 catalysts prepared by incipient wetness (IW) and deposition-precipitation (DP) methods. Additionally the assessment of activity was also conducted

    Oct 1, 2003

  • CIM
    Optimization of Die Cooling in the Aluminum Alloy Wheel Casting Process

    By Jianglan Duan, Steve L. Cockcroft, Andre B. Phillion, Carl Reilly, Daan M. Maijer

    "In the aluminum alloy wheel casting process, careful design of the cooling system in the die and its operation (cooling channel timing) are critical to achieve quality and productivity goals. The pro

    Jan 1, 2014

  • CIM
    Evaluation of Scale up Effect on High Pressure Grinding Roll (HPGR) Implementation at Pt Freeport Indonesia (cdb77a25-01d8-4e23-be0d-f16f699bd6bc)

    By J. Mosher, G. Banini, J. Hollow, A. Villanueva

    Prior to installation of High Pressure Grinding Rolls (HPGR) at PT Freeport Indonesia (PT-FI) a series of laboratory tests were carried out to determine the design parameters and also determine key pe

    Jan 1, 2012

  • CIM
    Repairs of Brunswick Mining, Smelting and Fertilizer concentrate and bulk handling system

    By D. T. Aikens, R. Gaudreault

    "This paper summarizes structural repairs carried out on a marine wharf consisting of six 13.7 m by 13.7 m reinforced concrete cribs linked together by five 14.6 m long beam spans. As a result of prob

    Jan 1, 1988

  • CIM
    The Evolving Legal Regime Governing Ethics And Sustainability in the Mining Industry

    By A. C. Drost

    The mining industry has been put under closer scrutiny in recent years, which has led to the adoption of a plethora of initiatives in countries around the world and by international organizations, som

    Aug 1, 2013

  • CIM
    Detection of Collectors on Mineral Grains by Tof-Sims

    By Ken G. Stowe, Stephen L. Chryssoulis, Christian Bendel, Joe Y. Kim, Ewald Niehuis

    "TOF-SIMS (Time-of-flight secondary ion mass spectrometry) was used to detect collectors sorbed onto the surface of mineral particles in concentrate and tailings samples from the Brunswick, Matagami a

    Jan 1, 1995

  • CIM
    A flexible computerized maintenance program for a micro, mini or mainframe

    By Ken Musgrave

    "A program is described that helps managers and supervisors control maintenance more effectively. Work- order generation, preventive maintenance, repair parts inventory, planning and scheduling, repor

    Jan 1, 1986

  • CIM
    COLOMBIA - Colombian Emerald Reserves Inferred from Leached Beryllium of their Host Black Shale

    By Gaston Giuliani, Jérome Massot, Didier Bourlès, Lionel Siame

    "Abstract - We present a new approach for the evaluation of the potential of emerald reserves in gem projects using beryllium (Be) mobility. The distribution of Be in the different phases of hydrother

    Jan 1, 1999

  • CIM
    Quality Assurance, Continuous Quality Improvement and Standards

    By Marcel Vallée

    "Abstract-In recent years, several unsavory events in international mineral exploration, as well as several widely publicized project difficulties and failures have occurred. The report Setting New St

    Jan 1, 1998

  • CIM
    HPGR’S in Minerals: What do Existing Operations Tell us for the Future? (40e020ea-2542-4068-987d-f3eed8ac9f34)

    By Rene Klymowsky, Norbert Patzelt, Egbert Burchardt, Johann Knecht

    "The challenge of ""ore bodies getting steadily harder and lower in grade"" was brought to light during the first oil crisis in the 70's. Shortly afterwards, HPGRs appeared on the scene with the

    Jan 1, 2012

  • CIM
    Application of Deadtime and Gain Compensation to Sag Feeder Control at P. T. Freeport Indonesia

    By Andrew Neale, Len Anderson, Rob Perry

    "P.T Freeport Indonesia's new SAG mill commenced operation in February 1995. The reclaim system consists of four apron feeders and a series of three conveyors. The feeders are used in various combinat

    Jan 1, 1996

  • CIM
    New Trends in Advanced Process Control and Impact on Minerals Processing Operations

    By Alan B. Morrow, William A. Poe

    "Minerals processing operations are constantly challenged with improving production rates, yields, energy efficiency and process stability. Advanced Process Control has proven to be an effective tool

    Jan 1, 2016

  • CIM
    Integrated Advanced Grinding Control System at Newmont Ahafo (4ebdb86b-3410-4a78-94cd-dbe1c9ed39a6)

    By O. Guyot, A. Broussaud, M. Revalor, G. Legrand, D. Kok, E. Roux

    "The paper describes the advanced grinding control system implemented at Newmont Ahafo gold mine, Ghana in 2009 and 2010. It shows how the different components of the Advanced Process Control (APC) sy

    Jan 1, 2012

  • CIM
    Characteristics of Gold Bonding Wire in IC Packages

    By Shinji Shirakawa

    The gold wire bonding technology is widely used for electrically connecting aluminum pads on IC devices to external terminal of semiconductor. In 1960?s, the tensile strength of gold bonding wire wa

    Oct 1, 2003

  • CIM
    Sequential Acid Leaching of Nickel Laterites with Iron Precipitation

    By J. D. Gillaspie, D. T. White

    "Sulphuric acid atmospheric leaching of nickel saprolite / garnierite ores was proposed in the early twentieth century, prior to the development of the pressure acid leaching process for limonite ores

    Jan 1, 2016

  • CIM
    Revisiting Ground Vibrations due to Mining Equipment Motion (7108fd07-daac-4ac4-863b-5e76cda3b2f0)

    By T. G. Joseph, M. Welz

    ABSTRACT: Joseph (2002) introduced passive seismic monitoring to measure mining equipment performance. This paper evaluates the potential of passive seismic monitoring to correlate mining equipment op

    Jan 1, 2011

  • CIM
    Alkaline pressure oxidation at Barrick Mercur

    "In conjunction with Banick Mercur , Wright Engineers Limited designed the first multi-stage aqueous pressure oxidation system in an alkaline environment in North America. A three-stage slurry heating

    Jan 1, 1989