  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • CIM
    The Behaviour of Gold in Hemlo Mines Ltd. Grinding Circuit (aa6f7398-0561-40ff-b0b4-243c3a8474e3)

    By S. Banisi, J. Marois, A. R. Laplante

    "This paper compares the behaviour of gold and ore in the grinding circuit of Hemlo Gold Ltd. Particular attention is given to grinding kinetics, classification behaviour, and liberation. For grinding

    Jan 1, 1991

  • CIM
    Control System Performance Assessment-Best Practices

    By Michel Ruel

    "PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo

    Jan 1, 2011

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )

    By Trevor Yeomans

    "NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o

    Jan 1, 2008

  • CIM
    Determining Ore Breakage Characteristics using the Steel Wheel Abrasion Test

    By Tapiwa Chenje, Victor Olivas, Peter Radziszewski

    "Ore breakage and grinding media wear have always been considered and determined separately in laboratory tests. However the two processes are linked with the ore broken down in any comminution device

    Jan 1, 2011

  • CIM
    An agent-based framework for open pit mine planning

    By K. Awuah-Offei

    Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in

    Jan 1, 2008

  • CIM
    Environmental Stewardship ? How do you balance impact with mitigation?

    By Carol E. Jones

    Outline ? Reclamation is a primary mitigation. ? Understand baseline environment and land use. ? Determine reclamation goals. ? Selecting reclamation technology. ? Determine technical risk. Rec

    May 1, 2008

  • CIM
    Learning From Experience: Aboriginal Programs In The Resource Industries

    By Barrie Robb

    Outline 1. Mackenzie Aboriginal Corporation (MAC) 2. ACR background 3. ?Learning from Experience? project - What - Why - lessons 3. How Industry could contribute to sustainable Aboriginal comm

    May 1, 2008

  • CIM
    Benefication of Low Grade Ore at the Detour Lake Mine

    "The Detour Lake Mine is located in northeastern, Ontario, approximately 300 kilometres northest of Timmins and 185 kilometres by road northeast of Cochrane. The mill processes a free milling gold or

    Jan 1, 2016

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • CIM
    Introduction -Papers on Cemented Backfill

    By J. R. Emery, D. F. Coates

    "FOUR PAPERS ON CEMENTED BACKFILL were given at the Annual General Meeting of The Canadian Institute of Mining and Metallurgy in 1970:Weaver, W. S., and Luka, R., ""Laboratory Studies of Cement-Stabil

    Jan 1, 1970

  • CIM
    Update of Span Design Curve for Weak Rock Masses

    By Andrea M. Ouchi

    A major focus of ground control research presently being conducted by the Geomechanics Group in the University of British Columbia Mining Engineering Department is to incorporate weak rock masses (RMR

    May 1, 2004

  • CIM
    Application of the SART Process to Heap Leaching of Gold-Copper Ores at Maricunga, Chile

    By Kevan J. R. Ford, Chris A. Fleming, Robert D. Henderson

    "Kinross Gold Corporation’s Maricunga mine in Chile presents an ideal opportunity to apply the SART process to a heap leach operation. Given increasing levels of cyanide complexed copper in current pr

    Jan 1, 2008

  • CIM
    Slag loss control with Bessemer mattes

    By P. Toscano

    The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-conv

    Jan 1, 2004

  • CIM
    Slag loss control with Bessemer mattes (7a7d6df1-1191-4a91-90b7-94a6293af197)

    By P. Toscano, T. A. Utigard

    "The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-con

    Jan 1, 2004

  • CIM
    The Recovery of Copper from Copper Oxide Ore using Heap Leaching, Solvent Extraction and Electrowinning

    By R. H. Walton

    "In recent years the recovery of copper from low grade oxide ores has received widespread attention. The cost of treating such ores using conventional technology, such as milling and flotation, is fre

    Jan 1, 1990

  • CIM
    Mineralization and Metallurgy of the Samatosum Project

    By P. J. Gron

    "The Samatosum Project is a base and precious metal deposit located in south central British Columbia. A dilute ore reserve of 766, 682 tonnes grading an average 1.1% copper, 3.0% zinc, 1.4% lead, 833

    Jan 1, 1990

  • CIM
    Mine ventilation fan specification and evaluation

    By J. S. Stachulak, K. A. Mackinnon

    This paper deals with specifying and evaluating fans for mine ventilation projects. Topics such as fan and equipment design life, operating points, and operating conditions are discussed. Common opera

    Jan 1, 2004

  • CIM
    Recovery of Zinc, Manganese and Lead from Pyrometallurgical Sludge by Hydrometallurgical Processing

    By J. -F. Blais, M. -O. Simonnot, P. Charbonnier, J. Mocellin, Université de Lorraine INRA, G. Mercier

    "Huge amounts of air pollution scrubber sludge have been generated during ferromanganese production using blast furnace. These residues have been historically deposited in ponds near steel making plan

    Jan 1, 2016

  • CIM
    Assessing the Returns to Copper Exploration, 1989-2008

    By R. A. Leveille, M. D. Doggett

    "Economic returns for the copper industry have been assessed by building cash flow models for each of the 100 new mines brought into production over the past 20 years. Ninety-one of the 100 new mines