Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)

    By Danny Déry-Chamberland, Peter Bowman, Michael Byle

    "The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on

    Jan 1, 2016

  • DFI
    Design And Specification Considerations For Environmental Cutoff Walls

    By Daniel Ruffing, Jeffrey Evans

    Vertical cutoff, or barrier, walls are an integral part of environmental site remediation efforts. Vertical barriers are commonly deployed to limit the influx of clean ground water and/or to control t

  • DFI
    Restoration Of Railway Embankment – A Case Study

    By Prodyot Kumar Ray, Sudip Kumar Koley, Aminul Islam, Somnath Banerjee

    One of the most important topics in the construction industry is the building of railway embankments. Being such a delicate and significant structure, it is crucial to properly design the embankment a

    Sep 1, 2022

  • DFI
    Construction Of The Main Tower Pier Caissons For The Greenville Bridge In Mississippi

    By F. Keith Jacobson

    To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus

    May 11, 2007

  • DFI
    A Case History On Design, Construction, And Performance Of Stone Column Ground Improvement Beneath An Mse Embankment

    By Karen Dawson

    This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge ab

  • DFI
    San Francisco-Oakland Bay Bridge: OPA Winner

    By Gerry Houlahan

    "The 2015 Outstanding Project Award (OPA), which recognizes the superior work of DFI members, was awarded for the San Francisco- Oakland Bay Bridge New East Span. The award was presented to representa

    Jan 1, 2015

  • DFI
    Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2008

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • DFI
    Founded on Creativity North Dakota’s Four Bears Bridge

    By Terrence R. Udland, Russell D. Call

    "Honored with a DFI 2006 Special Recognition Award, the Four Bears Bridge was constructed across Lake Sakakawea and opened to traffi c in September 2005. The very large lake size and severe winter con

    Jan 1, 2007

  • DFI
    Session 16 "Deep Mixing Method IV"

    By Mary Ellen Bruce

    Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only

    Feb 10, 2003

  • DFI
    2017 OPA WINNER - Tri-Pod Suction Buckets for Offshore Wind Turbine Foundation

    By Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu

    "Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).

    Jan 1, 2017

  • DFI
    Tri-Pod Suction Buckets for Offshore Wind Turbine Foundation

    By Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu

    "Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).

    Jan 1, 2017

  • DFI
    Real-Time Anchor Testing and Data Management

    By Bora Okumusoglu, Devon K. V. Mothersille

    "AnchorTest is an innovative software package, specifically developed for tablets, that permits ground anchor test data assessment and management in real time. The solution has two components: a front

    Jan 1, 2017

  • DFI
    LRFD and Its Implications for QC/QA of Deep Foundations

    By Bernard Hertlein, Chia K. Tan

    "The move to LRFD methods for structural design by AASHTO, ACI, AISC , ASCE, and the FHWA has been a major change for the American construction industry. The deep foundations industry has arguably bee

    Jan 1, 2005

  • DFI
    Ground Freezing Combined Method for Urban Tunnel Excavation

    By Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto

    "The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three

    Jan 1, 2015

  • DFI
    Micropiles In Soft Florida Limestone

    By James D. Hussin

    The Florida limestone is a relatively soft rock which presents many challenges to engineers when designing deep foundations. One alternative is micropiles which have grown significantly from their ear

    Jan 1, 2003

  • DFI
    Wick Drain Guide Specification (Method)

    "1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi

    Jan 1, 2014

  • DFI
    Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a Wetland

    By Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian

    "Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2

    Jan 1, 2017

  • DFI
    Use of Post-Grouted Drilled Shafts in Coastal Mississippi

    By Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues

    "Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual

    Jan 1, 2015

  • DFI
    Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)

    By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung

    "Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt

    Jan 1, 2017