    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • DFI
    O Street Anchored Precast Lagging And Soldier Pile Retaining Wall

    By John Wise

    Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu

    Jan 1, 2003

  • DFI
    Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983

    By Bengt Fellenius

    The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast

    Jan 1, 1984

  • DFI
    Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular Piles

    By Koichi Kobayashi

    Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora

    Jan 1, 2006

  • DFI
    Characterization Of Loess For Deep Foundations

    By Robert L. Parsons

    This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet

    Jan 1, 2009

  • DFI
    Tied-Back Micropile Walls In Landslide Repair

    By Kevin W. Cargill

    In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound

    Jan 1, 2006

  • DFI
    Recommendations For Implementing And Interpreting Non­Destructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.

    By Jose L. Garcia

    The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra

    Jan 1, 2006

  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • DFI
    "Value Engineering" In United States Of America

    By Maral Papazian Bedian

    Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng

    Jan 1, 2002

  • DFI
    Anchoring Tall Buildings In Lower Manhattan

    By Andrew Pontecorvo

    The design of foundations for the tall buildings of lower Manhattan rely on the use of high capacity, rock anchors to resist overturning forces generated by lateral loads from wind, earth, water and,

    Jan 1, 2011

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    Stub Pier Stabilization Performance

    By Swaminathan Srinivasan, Jess A. Schroeder

    "Landslide activity along U.S. 50 in Cincinnati, Ohio (USA) has caused roadway damage for decades. After a necessary closure of three lanes due to slope movements, emergency stabilization measures wer

    Jan 1, 2017

  • DFI
    Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:

    By Robert W. Bergwall

    The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T

    Jan 1, 1997

  • DFI
    Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary

    By Francis D. Leathers

    Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform

    Jan 1, 1994

  • DFI
    Bored Piles With Base Preloading By Grouting - The Polish Experience

    By Bolestaw A. Ktosihski

    Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr

    Jan 1, 2006

  • DFI
    Piling Problems - Introduction

    By D. Millgard

    Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.

    Jan 1, 1991

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988

  • DFI
    Design Of Concrete Tunnel Liners And Pipes By Ring Compression Theory ? Synopsis

    By W. Lum

    In the U.S., flexible metal pipe culverts are designed by ring compression theory because the pipes are capable of deflecting and deriving side support from surrounding ground. For economy, tunnel

    Jan 1, 2010

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • DFI
    A Small Diameter Vibration Pile With Soil Compaction

    By Miklós Kovács

    A new type of the cast in situ piles is introduced. The installation of the new pile is based on a pushing in/gaining back procedure. A temporarily closed tip element with square shaped cross-section

    Jan 1, 2002