Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Small Borehole Blasting in High Liability Locations

    By Geff Gordon, Dale Nies

    Small diameter borehole blasting can be very efficient and cost effective. As residential development continues to expand, many areas are now requiring blasting for site preparation and upgrading old

    Jan 1, 1990

  • ISEE
    New Horizons of the Engineering of Blasting in Service of Productivity: Selective Sequencing

    By Matias Suarez, Diego Zenteno

    This paper is aimed to display the new advancements of blasting engineering done in different mining sites throughout the country, associated to electronic sequencing, energy of the explosive and its

    Feb 1, 2020

  • ISEE
    A Rational Method for Predicting Damage to Historical Structures Subjected to Blasting Vibrations

    By Kenneth Medearis

    The accurate prediction of possible damage to historic structures subjected to blasting-related ground motions is not infrequently the dominant factor in whether or not a mining or quarrying operation

    Jan 1, 1993

  • ISEE
    Blast Segmentation for Vibration Management

    By Lee Julian

    Ground vibrations generated by mine blasting must be controlled to comply with legislation and to protect sensitive local or site infrastructure. The consequences of exceeding imposed limits can range

    Jan 1, 2014

  • ISEE
    In-Plant Demolition of 900 Cubic Yard Machine Base

    By Ed Jr Smith, Calvin J. Konya

    The purpose of this paper is to describe the case history of a blasting project conducted jointly by Precision Blasting Services and Cherokee Explosives. It is the intent of the authors to show how bl

    Jan 1, 1986

  • ISEE
    Attenuation of Blasting Vibrations in South Florida, Part II

    By Greg Mclellan, Mark Johnson, John Pepper

    In this paper, the measured vibrations are plotted in terms of the individual PPV components versus Scaled Distance (SD) on logarithmic scales. The maximum PPV is pIotted on a separate graph and equat

    Jan 1, 2001

  • ISEE
    Vibration prediction from controlled blast tests

    By Nadir Plasencia, Rogerio: Neves Mota

    The evaluation of vibrations induced to build structures is one of the main concerns when dealing with blast works. EDP, the main Portuguese producer of electricity is presently incrementing energy pr

    Jan 1, 2008

  • ISEE
    Cross-hole Seismic Measurement of Blast Induced Rock Mass Quality Change: A Review

    By William Adamson

    Precise and data driven methods of predicting and modelling blast induced vibration intensity are created and applied under field conditions on a routine basis today. These models are fed with control

  • ISEE
    Cross-hole Seismic Measurement of Blast Induced Rock Mass Quality Change: A Review

    By William R. Adamson

    This paper describes some of the results of previously unpublished research studies conducted in underground operations in Chile and Australia, where cross-hole seismic measurement profiles were inter

    Feb 1, 2020

  • ISEE
    Comparison of Highwall Control Methods at Bayswater Colliery

    By Tapan Goswami, Michael Croucher

    At Bayswater Colliery various methods of controlling highwall stabii were investigated. The use of presplitting was trialled and its effectiveness measured. The presplit hole spacing and explosive cha

    Jan 1, 1999

  • ISEE
    Surveying the Damage: Post Traumatic Stress and Pre-Blast Surveys

    By Jeffrey Loeb

    Recent trends in blasting engineering and its related fields, at the level of professional academia, have tended to exclude detailed discussion and examination of the formative experiences of the engi

    Jan 1, 2009

  • ISEE
    Journal: Blastserve, Look for the New Online Blasters Forum!

    Blastserve, ISEE’s Listserve is being replaced by our new Blasters Forum-online, an exclusive member benefit. Our goal is to provide an ISEE forum for you to network with your peers and exchange techn

    Jan 1, 2013

  • ISEE
    Blast fragmentation model to increase mill productivity and optimize resources based on the Mine to Mill Methodology

    By A. Ribeiro

    The effective utilization of resources and process optimization play a crucial role in the sustaining and growth of overall businesses. This principle holds true in the mining sector, where particular

    Jan 1, 2024

  • ISEE
    Defining and controlling the environmental impacts of blasting at a major opencast coal mine

    By D. Mason, W. J. Birch

    Blasting operations are arguably one of the most contentious areas of surface mining.Many operators carry out outine monitoring as required by Mineral Planning Authorities. However in so doing they on

    Jan 1, 2011

  • ISEE
    Time Correlations Between Building Cracks and Blasting

    In this paper, the author points out the need to beware of simple time correlations as proof of cause and effect when comparing building cracks and blasting operations. There is a need to be aware of

    Jan 1, 1981

  • ISEE
    Digital Delay Blasting At United Taconite LLC

    By William Everett, Jack Eloranta

    United Taconite is an iron ore mine operated by Cleveland-Cliffs Inc (Cliffs) located near Eveleth, Minnesota. The mine, originally known as Eveleth Taconite Mines, was purchased in December 2003 by C

    Jan 1, 2006

  • ISEE
    Predictive Modelling for Equipment Blast Exclusion Zone Reduction

    By Kim Henley, Chris Batten

    This paper discusses the use of the Orica WildFireTM flyrock model to help mining operations in Australia and Asia minimise blast exclusion zones for equipment, increasing utilisation and productivity

    Feb 1, 2020

  • ISEE
    A Kinematic Approach for Blast Modeling

    By Ruilin Yang

    Kinematic approach of blast modeling refers to using the velocity, strain, or displacement as controlling parameters to model blasting, rather than the stress and the material constitutive relations.

    Feb 1, 2020

  • ISEE
    New Firing Method for Underwater Blasting (Remote-Controlled Blasting System by Electromagnetic Firing Method)

    By Takeo Ueda, Masashi Nakano

    We have developed a new blasting system remotely controlled by an electromagnetic firing method, which has proved advantageously applicable to sites where rapid tidal current or deep water may cause s

    Jan 1, 1983

  • ISEE
    Reactive Ground Learnings and Prevention

    By R. Jacob

    Mining has been around for a long time, and new deposits are being discovered continually but are becoming more complex for processing and typically sulfide in nature. Most of the large easy deposits

    Feb 6, 2023