Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Oxidative Precipitation Of Fe And Mn By Air/So2
By Michelle Mouton, Johanna van Deventer, Jussi Vaarno
Mintek has been involved in numerous projects to remove Fe and Mn from dilute Co sulphate solutions by means of oxidative precipitation using air/SO2. Test work was done using a gas induction system,
Jan 1, 2007
-
Communicating Confidence in Mineral Resources and Mineral Reserves
Mining is an inherently risky business; from the technical, environmental, social, and economic uncertainties associated with advancing an exploration prospect to a viable project to the operating, ma
Jan 1, 2014
-
Process Performance Of Bacterial Leaching Reactors: The Contribution Of Mathematical Modelling
Bacterial leaching represents an unusual problem in biochemical engineering, because the substrate for bacterial growth is not supplied directly, but is a product of another reaction, the leaching of
Jan 1, 2000
-
Development Of A Viable Process For The Recovery Of Zinc From Oxide Ores
The Skorpion Zinc Project demonstrated the viability of the production of zinc from non-sulphide (commonly called ?zinc-oxide?) ores, using the leach/solvent extraction/electrowinning process route. T
Jan 1, 2008
-
Incorporation Of Ore Grade Uncertainty Into The Push Back Design Process
By J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Contracting, Complexity And Control: An Overview Of The Changing Nature Of Subcontracting In The South African Mining Industry
By B. Kenny
The aim of this paper is to provide an overview of existing forms of subcontracting in the South African mining industry. A descriptive framework is developed to understand different subcontracting ar
Jan 1, 1999
-
An Evaluation Of The Self-Directed Work Team Concept As A Means To Improve Overall Performance On South African Gold Mines
By C. F. Strydom
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree The Self-directed work team concept is the product of relentless performance pressure on Americ
Jan 1, 2002
-
The Giant Kamoa—Kakula Project in the Democratic Republic of Congo
By B. Matsetela, S. Amos, V. Nkuna
"The Kamoa-Kakula copper project—a joint venture between Ivanhoe Mines, Zijin Mining Group Co. Ltd, and the government of the Democratic Republic of Congo—has been independently ranked as the world's
Nov 1, 2018
-
Separation Of Nickel And Cobalt From Calcium, Magnesium And Manganese By Solvent Extraction With Synergistic Mixtures Of Carboxylic Acids
By A. C. du Preez
The separation of nickel and cobalt from calcium, magnesium and manganese by solvent extraction using synergistic mixtures of carboxylic acids was studied. Addition of certain viable synergists to com
Jan 1, 2004
-
Reply To The Comments Made By J.M. Schaekers* And D.W. Dew* On The Paper ?Neutralization Of Bioleach Liquors?
By B. M. Nyombolo
The interest shown in our paper by Drs Schaekers and Dew, and their favourable comments, are appreciated. However, some of their remarks require a response. Stability testing procedures Regard
Jan 1, 2001
-
The Link Between The Design Process In Rock Engineering And The Code Of Practice To Combat Rock Fall And Rockburst Accidents (b912fa13-df3d-4808-854e-a64433f9a771)
The paper deals with the importance of design and of codes of practice in ensuring safe working conditions in mines. The design principles involved in the design process are dealt with, and the import
Jan 1, 2004
-
Copper Mining in Zambia - History and Future (VOLUME 116)
By J. Sikamo, A. Mwanza, C. Mweemba
"The Zambian copper mining industry as we know it today had its genesis in the 1920s. Consistent private sector-driven investment in the industry over a period of over 50 years in exploration, mine de
Jan 1, 2016
-
Prediction of the geological condition ahead of the tunnel face in TBM tunnels by geostatistical simulation technique
By K. Aoki, Y. Mito, S. Shirasagi
The authors developed the TBM Excavation Control System (the TBM Navigator), in order to realize the advanced observational construction. During the excavation using this system, the rock strength val
Jan 1, 2003
-
Predicting The Stability Of Rockpasses From The Geological Structure
Instability in rockpasses at deep levels often initiates as a result of stress induced fracturing of the rock on the walls of the pass. This may then progress to a stage at which the geological struct
Jan 1, 2005
-
Dynamic Support Rationale and Systems
By U. Singh, E. T. Brown, J. Coxon
The rapid fracturing and deformation that occurs around excavations during rock bursts demand that support and reinforcement systems have both deformability and damping capabilities. The energy deman
Jan 1, 2003
-
Annual Report - For The Year Ended 30th June, 2000
Council for 1999/2000 President M.H. Rogers President Elect Dr L.A. Cramer Vice Presidents Senior A.A.B. Douglas Immediate Past President J.R. Dixon Junior S.J. Ramokgopa Hon
Jan 1, 2000
-
Study on Tunneling in Rock Masses with Inclined Layers Using Discontinuous Deformation Analysis (DDA)
By J. -H. Wu, S. Nishiyama, Y. Ohnishi
The behaviors and stress distributions of the inclined jointed rock masses with different dip angles obtained from DDA are compared to the results of laboratory tests. By calculating the block stress
Jan 1, 2003
-
Reply To H.G. Denkhaus ?Brittleness And Drillability? - In The Journal Of SAIMM, Vol 103. No. 8. Pp. 523
A large number of brittleness concepts have been used in very different studies in the literature. One of them is the B1brittleness concept. In this study, the objective is to criticize the B1 brittle
Jan 1, 2003
-
Activity Based Costing: Challenging The Way We Cost Underground Coal Mining Systems
By G. H. Lind
This paper discusses the traditional costing approach currently used in the underground coal mining industry. Activity Based Costing (ABC) is identified as being a potentially more effective manner in
Jan 1, 2001
-
A Lining Management System For Submerged Arc Furnaces
By Wayne Burmeister, Danie Benade, Louis Meyer, Hugo Joubert
What is not measured cannot be managed. This is true of most things, including a furnace lining. This paper describes a Lining Management System used for this purpose. It provides the operations st
Jan 1, 2007