Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
PCBs In Underground Mines: EPA/MSHA Enforcement InitiativeBy C. D. Secrest
Visiting Spring Canyon, a historic coal mining district near Helper, Utah, I was impressed by the great accomplishments that had taken place there. A tour book of the region tells of a period that beg
Jan 1, 1993
-
Access To Crushed Stone-The East And Front RangeBy J. S. Hayden
It is becoming increasingly difficult to secure local aggregate resources that meet quality standards and local restrictions without conflicts with other land uses and environmental regulations. The s
Jan 1, 1997
-
Tunnel Condition Assessment: State of the Practice - RETC2023By Ali Hafiz, Aidin Golrokh, Tom Iseley, Kaz Tabrizi, Saleh Behbahani
In the USA many highway tunnels were built during the 1930s through 1960s. This indicates that these tunnels have exceeded their intended design service life. Based on the initial tunnel inventory con
Jun 13, 2023
-
Carbon Reactivation In A Vertical Furnace For Gold/Silver Recovery - Presentation Synopsis:This treatise presents the application of the vertical furnace in a carbon regeneration system. Comparison is made to a rotary kiln. The construction, operation and control of the vertical furnace and
Jan 1, 1985
-
International Social License in Mining Projects (398d5fa8-9bb7-41fe-a37a-87700a767f4f)By D. E. Hulse
"Social License, the consent of the neighbors and community to develop and operate a mine, has received little attention until recently. Though social license is intangible, not having this relationsh
Jan 1, 2016
-
Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe
Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon
Dec 1, 2022
-
Energy Management In Minerals ProcessingBy T. S. Govindan
The first step in energy conservation in any industrial plant involves implementing many of the day-to-day "house-keeping" items such as fixing leaks, turning out lights, etc. When this step has been
Jan 1, 1978
-
Use Of Geostatistics In Prediction Coal Quality Ranges For An Underground Room And Pillar Mine ? IntroductionBy Kadri Dagdelen
New underground coal mines have become increasingly expensive to open. A simple drift mine producing a raw coal product can cost as much as $50 million while a new shaft mine producing a washed coal p
Jan 1, 1983
-
Methane Dilution Using High Volume Scrubbers in a Continuous Miner SectionBy James Veri, Andrew H. Stern, Gerald N. Torbert
When mining coal, the occurrence of high methane liberation rates can often overwhelm the existing ventilation capabilities of the working place and result in elevated levels of methane gas. These “ga
Jan 1, 1997
-
The Regeneration ProjectBy S. B. Hildebrand
One of the highest costs associated with insitu leaching of copper is electric power. The ReGeneration Project addressed this cost issue with a research and development project for BHP Copper. The pro
Jan 1, 1998
-
A Short-Longwall For Mining Continuous Miner ReservesBy M. P. Oommen
This paper provides a brief look at a proposed short-longwall for coal, development. The proposed method is an attempt to realize the advantages of longwall mining in deposits that, historically, woul
Jan 1, 1993
-
Geology And Exploration Of The Kelsey Lake Diamondiferous Kimberlites, ColoradoBy Howard G. Coopersmith
A resource of low grade good quality diamonds has been discovered through the Diamond Company NL-Moonstone Diamond Corp. Joint Venture. A limited bulk sample diamond test of two large kimberlite pipes
Jan 1, 1991
-
The Use Of Mathematical Programming For Strip Mine Planning And SchedulingBy Mark E. Gershon
The development of long term plans and schedules for strip mines now faces many companies, especially those developing large properties in the West. The rule of mining the lowest strip ratios first, w
Jan 1, 1983
-
Uncertainty Estimates for Geometallurgical ModelsBy Mario E. Rossi
Often geometallurgical models are prepared at various project stages from very few data and are assumed to be representative of very large tonnages. These may include recovery models; crushing and gri
Jun 25, 2023
-
Construction Of Explosion Resistant SealsBy C. R. Stephan
Explosion-resistant seals in underground coal mines isolate the environment within the sealed area from the active workings of the mine. The current United States Title 30 Code of Federal Regulations
Jan 1, 1997
-
The Regional And Stratigraphical Context Of Zechstein 3 And 4 Potash Deposits In The British Sector Of The Southern North Sea And Adjoining Land Areas.By Denys B. Smith
Electric logs and cuttings records from Zechstein 3 and 4 strata in boreholes in the British Sector of have been interpreted in the light of numerous cored boreholes through this sequence in north-eas
Jan 1, 1978
-
Machine Learning Models for Suspension System Performance Prediction in Large Dump TrucksBy S. Frimpong, D. Ali
For achieving bulk economic excavation, large dump trucks are being used in majority of the earth moving operations resulting in high impact shovel loading operations (HISLO) which exposes the operato
Jan 1, 2019
-
New Mexico's Mine Dewatering Act: Overview Of The Law And Its ApplicationBy John B. Draper
The 1980 Mine Dewatering Act was enacted to protect water rights and to allow mine dewatering to proceed where impairment of a water right might have otherwise created a bar to mine development. In Ne
Jan 1, 1983
-
Wire Sawing As A Tool For Underground Excavation WorkBy Joseph F. Peters
The paper will begin with the physical parameters of design in a wire saw. These will include such things as the type of wire used, abrasives, horsepower of operation, and drive components. It will th
Jan 1, 1997
-
An Engineering Approach To Mine Opening Design ? IntroductionBy Lawrence Adler
The design of an underground opening involves the coincidence of two highly complex and poorly specified components. First, the structural or mechanical characteristics of a geologic rock mass are not
Jan 1, 1968