Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Introduction (f248dc61-7d23-42d4-878e-d425d635fc78)By Christopher J. Bise
PRINCIPLES OF MINE PLANNING During the initial planning stages, all mining operations are analyzed and evaluated in a similar fashion. This similarity holds true because the mine-planning procedure ca
Jan 1, 1986
-
Advances In Autogenous And Semiautogenous GrindingBy Vladimir G. Kochnev
Crushing and grinding account for the major portion (60 to 80 percent) of the overall expenses for ore processing. Autogenous (AG) and semiautogenous grinding (SAG) have been considered a step forward
Jan 1, 2008
-
Second Avenue Subway—Tunneling Beneath ManhattanBy Geoffrey Fosbrook, Donald Phillips, Anil Parikh
The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im
Jan 1, 2005
-
Though Not a Record Year, the Coal Industry Performs Well in 1983By L. Westerstrom
Supply and Demand After a dismal first half, the industry saw a marked improvement in its markets during the final six months of 1983. Domestic consumption was 17.6% higher in the second half of th
Jan 5, 1984
-
Medium-Temperature Pressure Leaching Of Copper Concentrates - Part III: Commercial Demonstration At Bagdad, ArizonaBy J. O. Marsden
Parts I and II in this series of papers presented the chemistry of medium-temperature pressure leaching of copper sulfide concentrates and reviewed the metallurgical development of a process to effect
Jan 1, 2007
-
Image-based marine resource exploration and biodiversity assessment with MAMAS (Marine data Asset Management and Analysis System)By D. Brün, T. W. Nattkemper, T. Kuhn, T. Schoening
Underwater exploration for marine resources using camera-equipped devices (OFOS, ROV, AUV) is receiving growing attention. This development is creating a continuously growing pile of digital underwate
Sep 1, 2014
-
Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? IntroductionBy I. Ocak
Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme
Jan 1, 2011
-
Challenges in undertaking inertisation of fires in underground minesBy A. D. S. Gillies
Inertisation is used to enhance the safety of underground mine areas either to avoid the potential for a combustion event or to stabilize a situation after an ignition, fire or heating. The primary ob
Jan 1, 2009
-
Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer ProgrammingBy M. Kuchta, A. Newman
LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use
Jan 1, 2002
-
Copper Industry Continues to Break RecordsBy William R. Yernberg
SME’s Arizona Conference was held at the Doubletree Hotel at Reid Park in Tucson on Dec. 4 and 5, 2005. The annual conference is organized by the Arizona Conference Board of Directors, which represen
Jan 1, 2006
-
Planning and Preliminary Design of the North-South Bypass Tunnel, Brisbane, AustraliaBy Tony Peglas, Harry Asche, Eva Wood
The North-South Bypass Tunnel is a new $AUD1.5 billion underground traffic route in Queensland, Australia, a project of the Brisbane City Council. The tunnel is approximately 5.2 km long, bypassing th
Jan 1, 2005
-
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels ProjectBy Brian Fulcher
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1
Jan 1, 2008
-
Long-Term Trends in Copper PricesBy John E. Tilton
Real copper prices during the past several decades display two striking characteristics. First, they are highly volatile. Within a year or two, copper prices can rise or fall by 30% or more. Second
Jan 1, 2002
-
Middle Rouge Parkway Interceptor Extension—A Case HistoryBy Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty
The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in
Jan 1, 2007
-
Investigation of Stability of an Unconventional Water-Obstruction Gate Pillar with a Curved Boundary in Mining Inclined Ultra-Thick Coal SeamsBecause of complex geological environments, a number of coal reserves occur in inclined or dipping coal seams in certain parts of the world. Longwall top coal caving using split-level a singleentry pa
Jan 7, 2020
-
Bolivar Cu-Zn Skarn Deposit, Sw Chihuahua, Mexico - IntroductionBy T. Robyn
The Bolivar Cu-Zn skarn deposit in the Piedras Verdes mining district of Chihuahua is one of many base and precious metal deposits in the north-northwest trending Sierra Madre Belt extending across th
Jan 1, 2012
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Numerical Analysis for the Prediction of Bump Prone Conditions: A Southern Appalachian Pillar Coal Bump Case StudyTwo miners were fatally injured when a pillar bump occurred during retreat mining in a southern West Virginia coal mine. The mine was operating in the Eagle seam with overmining in the No. 2 Gas and P
Jan 7, 2020
-
Pre-Support Measures for Shallow NATM Tunneling in Urban SettingsBy Vojtech Gall
Pre-support measures for urban tunneling have seen a substantial development in the recent past. Ground improvement techniques, pipe-arch and spiling methods now allow for non-disruptive tunneling at
Jan 1, 2008
-
Paragenesis And Metal Associations In Interior Alaska Gold Deposits: An Example From The Fairbanks District (78a5358a-5cda-49ae-b93d-ba8558df1a55)By K. Severin, B. Flanigan, P. Marion
“Plutonic-related” gold deposits in Interior and SW Alaska (Tintina Gold Belt) vary significantly in size, grade, vein/deposit morphology, depth of emplacement, distance from causative pluton and meta
Jan 1, 2000