Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design of Yield Pillars in the Southern Coal Field of New South WalesBy Bhattacharyya AK
With increasing demand for more efficient production from the underground coal mines in the Southern Coalfields- of New South Wales, their design and operational aspects are constantly being review
Jan 1, 1992
-
Design Of Yieldable Tunnel Supports For Creeping RocksBy N. D. Cristescu
An analysis of the interaction between a creeping rock and a yieldable lining is presented. The following cases are considered: an elastic lining, a lining made of circular shaft rings that may slide
Jan 1, 1997
-
Design Of Yieldable Tunnel Supports For Creeping Rocks (PRIPRINT 94-76)By N. D. Cristescu
The aim of the present paper is to show how a mathematical modeling of a creeping rock and that of an yieldable lining can allow us to obtain an optimization of the lining design and generally of the
Jan 1, 1994
-
Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble FormationBy Emad Farouz
The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c
Jan 1, 2006
-
Design Optimization Of Grasberg Block Cave HaulageBy D. Marsh
The feasibility study for the Grasberg Block Cave mine, finalized in May 2008, indicated a production capacity of 160,000 tonnes per day. A rail haulage system was an integral part of the mine design
Jan 1, 2010
-
Design Optimization of Longwall Chain PillarsBy Behdeen Oraee, Amirhossein Bangian, Kazem Oraee
"Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple
Jan 1, 2010
-
Design Optimization With Risk Analysis to Minimize Belt Conveyor CostBy Marian W. Otrebski, Julian A. Korneck
Long distance, overland conveyors require significant capital outlay of which up to 70% may be contributed to the cost of belting. Significant savings may be achieved by identifying possible risk are
Jan 1, 1998
-
Design Overview of Technogrid Conveyance Arresting System and Mounting Details in the Hermosa Headframe - SME Annual Meeting 2026By C. H. Stephenson, Z. White
This paper presents the design approach case study for incorporating a Technogrid® conveyance End-of-wind arresting system within the new South32 Hermosa headframe. Focus is placed on energy absorptio
Feb 22, 2026
-
Design Parameter For Jacked PileBy Sugie Prawono
Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr
Jan 1, 1999
-
Design Parameters for the Central Thickened Discharge Method for Tailings DisposalThe central thickened discharge system of tailings disposal takes advantage of the natural beach slope formed by sub-aerially discharged tailings, and the non-segregating properties of thickened tai
Jan 1, 1991
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en
Jan 1, 2004
-
Design Practice Of Circular Diaphragm Wall Structure With Large Diameter ? SynopsisBy X. Y. Hou
The design practice of several circular underground projects with large diameter is summarized. By taking the advantages of load-bearing of circular structure, a rational annular tensile bar support s
Jan 1, 2010
-
Design Practices For Multiple-Seam Longwall Mines - ObjectiveProvide longwall operators with practical information and guidelines concerning mine design to reduce problems associated with the interaction of adjacent workings in multiple-scam longwall mines.
Jan 1, 1994
-
Design Principles for Optimizing an Established Survey Slope Monitoring SystemBy N. Mphathiwa
When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th
Jan 1, 2014
-
Design Principles for Soft Ground CutterheadsBy Werner Burger
The last decade has witnessed a rapid development and application of slurry and EPB type tunnel boring machines. Both soft ground types are able to excavate tunnels in unstable ground conditions below
Jan 1, 2007
-
Design Problems Associated With Port Handling FacilitiesBy Ian S. Ross
The emphasis in this paper is focussed on dry bulk car go or the same cargo converted to slurry form for ease of handling. It is this type of cargo which is of primary interest to the mining industry
Jan 1, 1972
-
Design Problems For Underground Nuclear Waste Disposal In BasaltBy Birger Schmidt
The design of underground nuclear waste disposal facilities poses new problems related to the requirement of long term safety against radionuclide migration. The degree and effects of rock disturbance
Jan 1, 1981
-
Design Procedure and Results from a Field Test of Soil Freezing as Stabilisation of Bottom Slice FillBy P Andersson, P Marklund
Evaluation of different techniques for bottom fill stabilisation showed that frozen fill was the most economical method. In order to test the method a full-scale field test was performed in the Rehnst
Jan 1, 1998
-
Design Procedure for Arch Canopies for Rehabilitation of High-Roof-Fall AreasBy Richard A. Allwes
A procedure is presented for the design of an arch canopy for the application of rehabilitating a high-roof-fall area. This procedure is specifically developed for evaluating an unbackfllled arch cano
Jan 1, 1986