Search Documents

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • SME
    Boart Longyear 4200 Surface Drill Features Improved Safety

    Safety is the No. 1 concern of any drill contractor or mine operator. Everyone in the industry knows a safe site helps stabilize operational costs and enables higher productivity. When it comes to ex

    Jan 1, 2009

  • NIOSH
    IC 8598 An Economic Appraisal Of The Supply Of Copper From Primary Domestic Sources

    By Harold J. Bennett

    This study was performed by the Bureau of Mines to evaluate the potential supply of primary copper from domestic resources. A tonnage-price relationship was developed indicating the quantity of copper

    Jan 1, 1973

  • AIME
    Forthcoming Meetings Of Societies (d2604bb6-453d-4fc4-a8a8-bd5598e33581)

    Organization Place Date 1918 American Society of Mechanical Engineers...:.. Worcester, Mass. June 4-7 American Institute of Chemical Engineers Berlin, N. H. June 19-22 American Concrete Institute A

    Jan 6, 1918

  • AIME
    Nondestructive Inspection of Metals

    By A. V. De Forest

    INSPECTION and test methods of great diversity have been used from the most ancient times to select raw material, control its manufacture, and appraise its finished properties and value. The "miller t

    Jan 1, 1940

  • AUSIMM
    Mobile Crushing and Screening Plant Applications for Small- to Medium-Sized Iron Ore Projects

    By D Connelly

    There is now a new generation of mobile crushing and screening plant systems available which have been developed based on the motivation of reducing truck haulage. Newly designed mobile crushing and s

    Aug 12, 2013

  • SME
    Wireless Access To Live Data From Mining Operations - Anywhere & Anytime

    By R. Heersink, C. H. Wells

    Innovations in communications and real-time information systems are providing industry opportunities to improve profitability. Real-time operating data is collected from equipment across a site or ev

    Jan 1, 2002

  • AUSIMM
    Flint Clays of the Merrygoen-Digilah Area

    The area between Merrygoen and Digilah is located on a structural high that separates the Sydney Basin from the Great Artesian Basin, and hence the stratigraphic succession of younger rocks overlying

    Jan 1, 1973

  • NIOSH
    OFR-11-80 Application Of Satellite Data To Surface Mine Monitoring In Selected Counties Of South Carolina

    By James N. Bayne

    An examination and analysis of Landsat digital data in the monitoring of surface mines in selected counties of South Carolina.

    Jan 1, 1979

  • ABM
    Simulação Da Degradação Mecânica De Pelotas De Minério De Ferro Em Forno De Redução Direta

    By Fernando O. Boechat

    Com a redução da oferta de minério granulado de boa qualidade no mercado mundial e as restrições ambientais à sinterização, as pelotas de minério de ferro passaram a ocupar um papel importante como ma

    Aug 1, 2018

  • AUSIMM
    Mining Methods in the Waihi Mine, N.Z.

    By Johnston W. H

    MINING operations in the Waihi mine began, under the present proprietorship in the year 1889. Previous to this, and as far back as the year 1880, the presence of reefs in the Martha Hill had been know

    Jan 1, 1912

  • SME
    Predictions Of Pit Lake Water Column Properties Using A Coupled Mixing And Geochemical Speciation Model (86271191-aaee-42de-b39f-4185708aba18)

    By D. Dunbar

    Flooding of open pits now receives considerable attention from the mining industry as an option that may minimize environmental impacts, particularly when anoxia in pit lake deep waters can effectivel

    Jan 1, 2001

  • AUSIMM
    Processing Strategies for Hidden Valley Operations

    By J Watt

    The Hidden Valley Gold Project is located in a remote and mountainous area of the Morobe Province approximately 30 km south of the township of Bulolo and approximately 90 km south-southwest of the pro

    Jan 1, 2009

  • CIM
    Murrin Murrin CCD1 Rake Mechanism Modification the Decision and the Result (3e495dbc-2cca-4184-88b3-9cc5914b2481)

    By Brad Hewitt, Jeff Belke

    "Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and op

    Jan 1, 2005

  • SME
    Using Administrative Controls to Reduce Tailings – Dam Risk

    By G. H. Glos

    There was a time when an occasional failure of a tailings embankment was considered an acceptable risk associated with mining activities. This is not the case anymore. A major tailings failure today

    Jan 1, 1999

  • NIOSH
    Estimated Sound Power Radiated By Surfaces On A Continuous Miner Tail Section Using Vibration Measurements

    By David S. Yantek

    Miners in underground coal mines experience prolonged exposure to high noise levels, often with A-weighted sound levels in excess of 90 dB. Field tests have shown that the continuous miner conveyor i

  • DFI
    Response to Load for Four Different Types of Bored Piles

    By Mario Terceros H., Bengt H. Fellenius

    "ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore

    Jan 1, 2014

  • AUSIMM
    Techniques Used and Problems Encountered in Normal and Reverse Circulation Drilling at the Mt Roseby Project, Cloncurry, North West Queensland

    Techniques Used and Problems Encountered in Normal and Reverse Circulation Drilling at the Mt Roseby Project, Cloncurry, North West Queensland

    Sep 13, 2010

  • AUSIMM
    Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologies

    By M J. Shearer

    An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume

    Aug 28, 2017

  • SME
    Long-Term Stability Of Overburden Above Room And Pillar Mines

    By Gennaro Gerald Marino

    Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for

    Jan 1, 1986