  • AIME
    Minerals Beneficiation - Magnetic Separation for Mesabi Magnetite Taconite

    By J. E. Forciea, O. E. Palasvirta, L. G. Hendrickson

    AH pilot and commercial plants working with Mesabi Range taconite employ wet magnetic separation. Progress is being made with a dry magnetic process, but this has not yet been applied to taconite exce

    Jan 1, 1959

  • SME
    Mine Safety Applications Of A Geographic Information System

    By S. E. Phillipson

    The Mine Safety and Health Administration?s (MSHA) Roof Control Division (RCD) collects a variety of geological and engineering information pertaining to mining conditions in surface and underground m

    Jan 1, 2008

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • AUSIMM
    The Planning of Modern Colliery Development for the Steel Industry

    By Lonie W. M

    The rapid development of the Australian steel industry over the past twenty years has greatly increased the demand for coking coal from the collieries owned by the Broken Hill Proprietary Co. Ltd. and

    Jan 1, 1957

  • NIOSH
    RI 5435 The International Systems Of Hard-Coal :Classification And Their Application To American Coals ? Introduction And Summary

    By W. H. Ode

    In 1949 the Coal Committee of the Economic Commission for Europe, Geneva, Switzerland, established a Classification Working Party, to develop an international system for classifying coal. This project

    Jan 1, 1958

  • DFI
    EFFC-DFI Geotechnical Carbon Calculator Project

    By Vincent Joannes, Marine Lasne, Luca Brenelli, Colin Serridge, Inge van Baardwijk, Martin Stanley, Anthony Fisher, Mary Ellen Bruce, Tony Suckling, Pedro Avellanosa

    "Abstract The European Federation of Foundation Contractors (EFFC) and Deep Foundations Institute (DFI) developed a sector-specific carbon accounting methodology and associated “carbon calculator” for

    Jan 1, 2014

  • SAIMM
    Bed Blending Design Incorporating Multiple Regression Modelling And Genetic Algorithms

    By M. Kumral

    The efficiency of an ore-processing unit depends on the consistency of the characteristics of raw material entering the plant. When the mined ore is highly variable in quality, the only way to ensure

    Jan 1, 2006

  • DFI
    The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis

    By Dan A. Brown

    The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia

    Jan 1, 2011

  • AUSIMM
    Technology of Electrolytic Reduction of Alumina by the Hall-Heroult Process: V. The Formation of Chiolite by Reaction Between Molten Cryolite and Aluminium

    The reactions between molten aluminium and cryoIite have been determined from a material balance of all components involved in the process. The interpretation of results were supported by x-ray diffra

    Jan 1, 1968

  • IOM3
    Underground disposal of radioactive waste by United Kingdom Nirex Ltd.

    By B. J. Breen, C. S. Mogg

    Considerable borehole investigation work has been completed at a proposed site at Sellafield in Cumbria, supplemented by seismic surveys, other geophysical sensing and geological mapping. The focussin

    Aug 1, 1994

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • AUSIMM
    Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,

    By Met B. E

    During the operation of the Parkes process of desilverising, and in the earlier days of the continuous process, gold and silver were removed separately from softened lead bullion. Gold was removed in

    Jan 1, 1937

  • ISEE
    Reducing Overall Toxic Fumes at Fixed Work Output, by Formulating

    By Michael Wieland

    For shooting rock properly, some relatively fixed quantity of rock work is required from the total charge mass, while keeping the overall toxic fumes to a minimum. The overall fumes weighted for the t

    Jan 1, 2006

  • CIM
    Coarse Lead Flotation Practice at Polaris

    By R. Simkus, J. K. Gowans

    Polaris Operations, a Cominco Ltd. lead-zinc mine, is located on Little Cornwallis Island, Northwest Territories, at Latitude 75°23' N and Longitude 96°75' w. When the Polaris Mine went into operation

    Jan 1, 1984

  • CIM
    Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada

    By Stephen P. Quin

    One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti

    May 1, 2003

  • CIM
    Implementing Best Practices of Metal Accounting at the Strathcona Mill

    By Donald Leroux, Asim Tuzun, Simon Gariépy, Luc Lachance, Hayley Halsall-Whitney

    "The importance of coherent material balance results has long been recognized by mining and metallurgical companies. Although this is still true nowadays, various stakeholders are increasingly concern

    Jan 1, 2012

  • SME
    Technical Considerations For TBM Tunneling In The Andes

    By Dean Brox

    The use of Tunnel Boring Machines (TBMs) for tunnel construction of long tunnels in the Andes of South America has been of mixed success in the past due to a variety of reasons and key lessons can be

  • SME-ICGCM
    Design and Performance of a Longwall Coal Mine Water-Barrier Pillar

    By Francis Kendorski

    The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were

    Jan 1, 2007

  • NIOSH
    RI 5946 The Performance And Operating Characteristics Of An Image Furnace Having 60-Inch Paraboloidal Mirrors ? Summary

    By Edwin E. Maust

    In response to the ever- increasing demand for high temperature materials, the Bureau of Mines instituted a program for the study and development of superrefractories, One of the major tools obtained

    Jan 1, 1962

  • SME-ICGCM
    Two Case Studies Of The Performance Of Rib Supports

    By M. K. Larson

    The U.S. Bureau of Mines conducted a study to evaluate support interaction between conventional bolts and the rib at two Western coal mines. The principal goal was to develop guidelines for designing

    Jan 1, 1996