Search Documents

  • SAIMM
    Thermophilic Mineral Bioleaching Performance: A Compromise Between Maximizing Mineral Loading And Maximizing Microbial Growth And Activity

    By A. Sissing

    Paper written on project work carried out in partial fulfilment of M.Sc. (Chemical Engineering) degree Thermophilic bioleaching, conducted at temperatures in excess of 65°C, provides considerable b

    Jan 1, 2003

  • NIOSH
    Carbonizing Properties: British Columbia, Matanuska Valley (Alaska), And Washington Coals And Blends Of Six Of Them With Lower Sunnyside (Utah) Coals ? Introduction

    By J. D. Davis

    THIS-report gives results of in investigation of the carbonizing properties of 18 coals, including 2 from Alaska, 12 from British Columbia, 3 from Washington, and 1 from Utah. Each coal was carbonized

    Jan 1, 1952

  • AUSIMM
    Influence of Elements on the Properties of Lead. Part VII.-The Influence of Composition on the Creep Rate of Industrial Lead

    By Met M. E, Worner H. K

    During the past two years, a large number of creep tests has been carried out on electrolytic lead, special assay lead and ordinary refined (Port Pirie) lead. Some of these tests have already been rep

    Jan 1, 1936

  • NIOSH
    IC 7446 Annual Report of Research and Technologic Work on Coal, Fiscal Year 1947

    By P. M. Ambrose, A. C. FtELDNER

    This , the twelfth annual report of research and technologic work conducted by the Bureau of Mines on coal and coal products , summarizes the research and tests conducted frah July 1, 1946, to July 1,

    Jan 1, 1948

  • DFI
    Instrumented Load Tests On Closed-And Open-Ended Piles

    By Junhwan Lee

    Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p

    Jan 1, 2003

  • NIOSH
    RI 6046 Differential Sulfatization Of A Georgia Manganiferous Iron Ore ? Introduction And Summary

    By H. P. LeVan

    The aced for reliable reserves of the essential element, manganese, has been a continuing concern of the Federal Government for more than three decades. Because of the increasing vulnerability of outs

    Jan 1, 1962

  • SME
    The Germination Of A Failure: The Role Of Human Factors In Effective Root Cause Analysis

    By R. J. Latino

    Because of the lack of a universally accepted definition or standard for RCA, we are left to our own conventions in the marketplace as to what is most ?effective? or a ?Best Practice? for our own faci

    Feb 27, 2013

  • SME
    Subsidence Potential In The Eastern Kentucky Coal Field

    By C. A. Johnson, K. F. Unrug

    The identification of the major subsidence areas in the Eastern Kentucky Coal Field has been made to distinguish the subsidence phenomena on the basis of geographical location. Further, this identific

    Jan 1, 1986

  • AUSIMM
    Operating Strategies for Custodians of Company Assets Creating Wealth

    By A L. Welsh, P S. Newling

    Mill operators are entrusted to manage what are normally the largest capital assets on any mine site. Achieving maximum utilisation and lowest costs that drive operating margins are realised by applyi

    Sep 7, 2015

  • ISEE
    Experience with and benefits from the use of 3D Stereophotogrammetry for blast design and control

    By Peter Moser, Mark Ganster, Andreas Gaich

    Surveying of a bench face before blasting is a pre-requisite for a proper blast planning and for a satisfying blasting result both in terms of safety and fragmentation. When surveying a bench face, pr

    Jan 1, 2007

  • SME
    Geometallurgical Modeling of the Escondida Deposit - Mining, Metallurgy & Exploration (2023)

    By Andres Salazar, Carlos Delgado Robles, Richard K. Preece

    Minera Escondida, located in the Antofagasta Region of northern Chile, is the world’s largest producer of copper as concentrate and SX-EW cathode. Projects to increase mill and flotation capacity bega

    Aug 31, 2023

  • TMS
    Anode Casting Operation, Process Improvements And Anode Quality At The Ilo Refinery

    By Victor Raul Alarcon

    The Ilo Refinery was commissioned in 1975, with a cathode production capacity of 150,000 tpy. In 1994, Southern Perú Copper Corporation (SPCC) purchased the Refinery from Minero Perú SA. Subsequentl

    Jan 1, 2005

  • DFI
    Estimation of Shaft and Base Responses from Pile Load Test

    By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran

    "Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc

    Jan 1, 2017

  • SME
    Mine Planning Software Models Empire Mine Ore

    By Allan E. Koski

    Ceveland-Cliffs uses a specialized software package in mine planning at the Empire Mine, an iron ore mine it manages on Michigan’s Marquette Iron Range. The application puts together years of mining

    Jan 1, 2000

  • CIM
    From Drill Core to Metal: A Multi-Disciplined Approach to Flowsheet Development

    By Norman O. Lotter, Virginia Lawson, Mika Muinonen, Dominic Fragomeni, Jorge F. Oliveira

    Development of metallurgical flowsheets from drill core to production of finished metal involves two main domains: process mineralogy to sample the ore and develop a successful flowsheet producing sal

    Jan 1, 2014

  • AUSIMM
    Endeavour 26 North Copper-Gold Deposit, Goonumbla, N.S.W.-Paragenesis and Alteration Zonation

    A new porphyry copper gold district has been discovered at Goonumbla near Parkes in central New South Wales. Endeavour 26 North is the largest deposit known to date with a possible resource of 166

    Jan 1, 1986

  • NIOSH
    IC 7130 Testing Respiratory Protective Equipment For Approval ? Introduction

    By H. H. Schrenk

    The purpose of respiratory protective equipment is to prevent the inhalation of harmful or objectionable atmospheres. Although constituents or contaminants that may render an atmosphere irrespirable o

    Jan 1, 1940

  • CIM
    Geology and setting of the Red Mountain gold-silver deposits, northwestern British Columbia

    By D. A. Rhys, M. Sieb, M. A. Prefontaine, C. L. Swanson, S. R. Frostad, H. Q. Smit

    "Gold-silver mineralization at Red Mountain (1992 resource of 2.5 million tonnes grading 12.8 g/t Au and 38.1 g/t Ag) occurs within several discrete zones within a folded sequence of Middle to Late Tr

    Jan 1, 1995

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • DFI
    Fundex - Deep Foundation Institute Tensile Pile Test Seminar - September 9 & 10, 1993 - Introduction

    After the Loma Prieta Earthquake, which caused major damage to viaducts in the Bay Area, the California Department of Transportation set up a test programme for foundation piles. Funderingstechnieken

    Jan 1, 1993