Search Documents

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • DFI
    Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load Testing

    By Tatsunori Matsumoto

    In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were

    Jan 1, 2006

  • DFI
    First Quality Tissue Plant, Lock Haven, Pennsylvania: A Case Study Of Drilled Displacement Dewaal Piles ? Introduction

    By Gordon King

    The site of the First Quality Tissue plant is located on a previous paper production facility in Lock Haven, Pennsylvania. The new development, which included the construction of a tissue machine buil

    Jan 1, 2004

  • TMS
    Variance And Heterogeneity In Melt Samples From Industrial Ferro-Alloy Furnaces

    By Jacques J. Eksteen

    Any effort to improve the metallurgical control of industrial furnaces employed in the primary extraction of high carbon ferroalloys are bound to fail unless the variability of the melt is not fully a

    Jan 1, 2006

  • CIM
    Investigation into Iron Ore Concentrate Moisture Issues

    By T. Holmes, D. C. Russell, G. Jolly

    "The AMEC Oakville office is involved in the design and construction of an iron ore concentrator located in Liberia. Currently, the site ships Direct Shipped Ore (DSO) to overseas customers. The DSO m

    Jan 1, 2014

  • AIME
    Magazines, Etc., For Sale to Complete Members? Sets

    The Institute has prepared a list of Societies' publications, magazines, . etc., which were duplicates and were discarded at the time of the consolidation of the libraries of the three Founder So

    Jan 1, 1916

  • AUSIMM
    Spontaneous Combustion and Simulation of Mine Fires and Their Effects on Mine Ventilation Systems

    By H W. Wu, D Humphreys

    The structure of a comprehensive research project into mine fires study applying the Ventgraph mine fire simulation software, preplanning of escape scenarios and general interaction with rescue respon

    Jan 1, 2005

  • SME
    Copper Precipitation And Cyanide Recovery Pilot Testing For The Newmont Yanacocha Project

    By S. Acar, M. Botz

    Introduction In 2007, Newmont Mining Corporation will begin construction of a milling and cyanidation leaching circuit for the Yanacocha site in Peru. Ore to be processed in the circuit contains a r

    Jan 1, 2007

  • AUSIMM
    Spodumene: A Mineral Source of Lithium

    By Elliott A, Kingsnorth D. J

    The development of a large high grade spodumene orebody, in excess of 30M tonnes containing at least 7M tonnes at 4.0% Li20, by Lithium Australia Ltd at Greenbushes, Western Australia is significan

    Jan 1, 1989

  • AUSIMM
    Mineralogical and Geochemical Analysis of Ironsand at Taharoa, New Zealand

    By S Jokanovic, J L. Mauk

    The Taharoa ironsand deposit covers approximately 16 km2 and is located 144 km south of Auckland on the west coast of the North Island, New Zealand. The heavy mineral-rich sands predominantly contain

    Jan 1, 2003

  • SME
    English Sea Drives - A Success Story

    By Joseph L. Margin

    From a stubborn start to record setting performances in little over a year, that is the story of the English Running Tunnel Boring Machines. The program to transfer technical information on these high

    Jan 1, 1991

  • CIM
    Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper Concentrator

    By G. Cordingley, A. Mwanza

    Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an

    Jan 1, 2014

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • AUSIMM
    Notes on a Railway Tunnel Carried on Timber

    The timber township of Powelltown, Victoria lies N.E. of Yarra Junction, 60 miles east of Melbourne and in the site of the mill of the Victorian Hardwood Company Proprietary Ltd.A lift gauge railway o

    Jan 1, 1925

  • NIOSH
    Bulletin 169 Illinois Mining Statues Annotated

    By J. W. Thompson

    BURYING DEAD MINERS. BURYING BODIES OF DEAD MINERS. REVISED STATUTES (HURD) 1874, P. 263. SEC. 22. LIABILITY OF RAILROADS, ETC., FOR BURIAL EXPENSES.-When any railroad company, stage or any steamboat

    Jan 1, 1919

  • DFI
    Three-Dimensional Numerical Modelling of Load Distribution and Settlement of Pile Groups

    By Onur Kacar

    A numerical approach has been implemented to assess the settlements of pile groups bearing in clay. A three-dimensional finite element program has been utilized to model a vertically loaded spread foo

    Jan 1, 2018

  • SAIMM
    Development of a Fuzzy Model for Predicting the Penetration Rate of Tricone Rotary Blasthole Drilling in Open Pit Mines

    By A. Nuric, S. Nuric, L. Kricak, M. Negovanovic, S. Mitrovic

    "SynopsisRotary drilling with rolling tricone bits is the most widely used method for drilling large-diameter blast-holes in large surface mining operations. This drilling method is applicable to a wi

    Jan 1, 2015

  • SAIMM
    Stability evaluation of room-and-pillar rock salt mines by using a flat jack technique – A case study

    By M. Z. Emad, N. Abbas, Y. Majeed

    Room-and-pillar mining is commonly employed for the extraction of rock salt in undergroundmines. Pillar stress is a major concern in these mines as it is directly related to stability and mineralrecov

    Jun 5, 2023

  • SME
    Evaluation of Large Tunnels in Poor Ground—Alternative Tunnel Concepts for the Transbay Downtown Rail Extension Project

    By David Hopkins, Steve Klein, Bradford Townsend, Ed Sum, Derek Penrice

    INTRODUCTION The Transbay-Caltrain Downtown Extension (DTX) Project involves the construction of an approximately 1.5-mile rail line that will extend Caltrain commuter service and the future Calif

    Jan 1, 2007

  • CIM
    Effects of Borehole Deviation on Blasting Results and the Tolerable Error in Borehole Surveying

    By Jerry J. Ran

    In open stope mining borehole deviation is one of the main factors affecting the blasting results. Though previous research has identified some actual deviation patterns, these studies are unable to r

    May 1, 2002