Macraes Gold Project - Creating Value with MetallurgyBy Q Johnston
Since its inception in 1990, improved metallurgical processing technologies, coupled with mine planning enhancements and improved geological knowledge, have sequentially enabled better efficiencies an
Jan 1, 2001
-
A Study in Extreme Event Large Displacement Analysis of Large Diameter PilesBy Bret N. Lingwall, Byron Foster
The problem of reliable extreme event modeling of large diameter piles under enormous structural or kinematic loads has gained more attention in recent years. In particular, the soil response around t
Jan 1, 2018
-
Cobrepampa: magmatismo asociado y características metalogenéticasBy Michael Valencia, Alonso Marchena, Fredy Arcos, Miguel Chumbe
Cobrepampa es un depósito de cobre ubicado en Acarí (Caravelí-Arequipa). La mineralización se emplaza en pórfidos dioríticos pertenecientes al intrusivo Cobrepampa (Superunidad Linga) y está constitui
May 22, 2019
-
Waterproofing And The New Austrian Tunnel Method (NATM)By A. Kevin Beaton, Robert W. Laakso
The desire for dry passageways promotes the NATM as it provides a final support system most suitable for the installation of a waterproofing membrane. Waterproofing during construction is a cost effec
Jan 1, 1991
-
Development Of A New Mathematical Model For Prediction Of Surface Subsidence Due To Inclined Coal-Seam MiningBy A. Asadi
Subsidence phenomenon as an unwanted consequence of underground mining can cause problems for environment and surface structures in mine area. Surface subsidence prediction for inclined and steep seam
Jan 1, 2005
-
Bacís Flotation Cell For Gold- And Silver-Beard Pyrite RecoveryBy J. R. Parga
In mineral processing, poor froth-flotation performance translates into both an enormous loss of revenue and an unnecessary waste of the ore reserve. In this context, Bacís Mining Company developed a
Jan 1, 2009
-
RI 7277 Factors Affecting Detonation Velocities Of Desensitized Nitroglycerin In Simulated Underground FracturesBy J. S. Miller
The Bureau of Mines conducted surface tests to determine the feasibility of using liquid explosives for underground rock fracturing. The effects of configuration, confinement, length, critical layer t
Jan 1, 1969
-
Blasting Vibrations Control: The Shortcomings of Traditional MethodsBy Thierry Bernard, Pierre M. Vuillaume, Michel Kiszlo
"In the context of its studies for the trench ministry of the environment and for the French national coal board, INERIS (the French institute for the industrial environment and hazards, formerly CERC
Jan 1, 1996
-
A national curriculum in Australian minerals education: New generation flexible-delivery undergraduate coursesBy G. Kelly
A new minerals engineering education programme is being developed in Australia which aims to provide tertiary institutions with a package of educationally sound, high quality courses for undergraduate
Jan 1, 2003
-
Blasting Results Compared Using Crusher Powder Consumption and Tonnage of Rock ProducedBy Ron Glowe
This paper shows the potential of a new computer model, using the Glowe-Tech (GT) Tonnage Analyzer program to compare drilling and blasting results. This model uses the crushers and conveyors as measu
Jan 1, 2005
-
The Analysis Of FEM On The Anchorage Consolidation For Stabilizing A Tunnel With Thick Overburden ? SynopsisBy J. M. Pei
In this paper, the nonlinear finite element analysis is used to study the support system of a tunnel which is designed to pass through deep-embeded stratum. The rock mass is rather intact, though a se
Jan 1, 2010
-
Advances in Coarse Particle Flotation - Copper and GoldBy H Thanasekaran, J Kohmuench, B Seaman
To achieve an efficient separation in the flotation process, valuable particles need to be selectively segregated from the gangue while utilising a minimum number of flotation stages. TodayÆs existing
Jul 15, 2013
-
Perspectives on U.S. Energy OptionsNational Energy Technology Laboratory ?Only DOE national lab dedicated to fossil energy -Fossil fuels provide 85% of U.S. energy supply ?One lab, five locations, one management structure ?1,200 F
Jan 1, 2006
-
Controlled chloride cracking of austenitic stainless steel tube samples - SynopsisBy M. S. Raseroka
An experimental rig has been constructed to produce chloride stress corrosion cracks in Type 304L stainless steel tube samples. The samples are to be used to test possible in situ repair methods in fu
Jan 1, 2009
-
Modification Of Waelz Kiln Processing Of La Oroya Zinc FerriteBy P. C. Holloway
La Oroya zinc ferrite (19.5% Zn, 26.6% Fe, 0.052% Ga, 0.075% In) was roasted with coal under conditions more oxidizing than normally used in a Waelz kiln, and the roasted residues were leached with 20
Jan 1, 2008
-
Excavation Bracing Technology ? SynopsisBy G. F. Sowers
Excavation bracing is a special structural system. It is built from the top down. The design is controlled by the economical construction of another structure as well as by the movement of the ground
Jan 1, 2010
-
Automatic Substations Used In Coal MiningBy R. J. Wensley
THE use of small substations for the supplying of 275-volt energy to the locomotive and cutting machines in coal mines is a well-established practice. A few years ago, when labor costs were lower, the
Jan 9, 1921
-
RI 7943 Phases and Interdiffusion Between Titanium and Its MononitrideBy F. W. Wood
The Bureau of Mines has sought clarification of the Ti-TiN system by studying the phases formed by diffusion reactions between titanium and titanium nitride. Reaction couples were prepared by embeddin
Jan 1, 1974
-
RI 9511 - Evaluation Of Nondestructive Test Instruments For Wire RopeBy G. L. Anderson
The critical importance of wire rope integrity to the mining industry has led to the creation of standards for the retirement of wire rope as well as to the development of electromagnetic devices and
Jan 1, 2010
-
Alberta Lake Re-Established After Draining to Mine CoalBy Sukru Sumer
East Pit Lake is an artificially created lake that resulted from the remediation and reclamation of surface coal mining operations at TransAlta Utilities' Whitewood Mine in the Wabamun area west