Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mineralogy and Magnetic Susceptibility of the Proterozoic Granites, Related to Gold Mineralisation, Pine Creek Geosyncline, Northern Territory, Australia

    By Z U Bajwah

    During the Palaeoproterozoic, a large number of granitic intrusions were emplaced in the various parts of the Pine Creek Geosyncline (PCG). In the central region, the granitic magmatism is represent

    Jan 1, 1994

  • AUSIMM
    Characterisation of Coal Micro-Structure Using Scanning Electron Microscopy

    By Beamish B. B

    In this study, a systematic examination of the scale and variety of micro-structures in coal using Scanning Electron Microscopy (SEM) has been carried out, using coal samples of differing stages of

    Jan 1, 1991

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • AUSIMM
    Rock Excavation by Machine - A Comparative Study of Picks and Discs

    One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing

    Jan 1, 1976

  • AUSIMM
    Simulation Model of Gas Injection Aided Dewatering in Underground Mining

    By Kesser Z, Vincze T

    The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha

    Jan 1, 1988

  • AUSIMM
    Description of Effective Technology for Silver Recovery from Zinc Cakes Obtained as by-Product in Metallurgical Zinc Plants

    By Sataev IS, Malinovskaja ND, Otrozdenova LA, Knodov NV, Maximov II, Kuznetzou OK

    The technology of flotation recovery of silver from the residue of a zinc plant is described. The peculiarity of this technology is a preliminary pulp conditioning in sodium chloride solution in the

    Jan 1, 1993

  • AUSIMM
    Results of Radiometric Surveys in the Alligator River and Cobourg Peninsula Area of the Northern Territory

    The Bureau of Mineral Resources has been engaged in regional geological and geophysical field work in the Alligator River and Cobourg Peninsula area since 1971, following the discovery of major ura

    Jan 1, 1975

  • AUSIMM
    Practical Implicit Geological Modelling

    By H J. Ross, R K. Beatson, T J, W R. Fright

    Traditional method of explicitly defining three-dimensional (3D) ore-waste and geological boundaries relies heavily on a time-consuming process of manual digitisation. This method of modelling can be

    Jan 1, 2003

  • AUSIMM
    Forecast Trends of Australian Mineral Production to the Year 2000

    By Huleatt M, Perkin D, McLeod I, Mock C, Pratt R, Gourlay A, Timoney E, Knight N, Ward J

    Generally speaking, Australia's reserves of its more important minerals (in terms of export earnings) are adequate to sustain forecast rates of production to the year 2000. The rate of foreca

    Jan 1, 1981

  • AUSIMM
    Prediction of Subsidence Due to Longwall Mining at West Cliff Colliery

    By Shu DM, Moxon P

    Subsidence profiles over longwalls at West Cliff Colliery (WCC) are predicted by three methods, NCB Emperical Method, Salustowicz's Profile Functions and Superposition of Two Critical Profile

    Jan 1, 1986

  • AUSIMM
    Paper No. 162. The Refining of Base Bullion at Port Pirie, and Treatment of By-Products.

    The article, as written, represents a short account of the treatment of the base bullion from the Broken Hill ores, as carried on at Port Pirie, for the recovery of lead, silver, and gold, and for the

    Jan 1, 1907

  • AUSIMM
    Recent Experiences at the Kangaroo Flat Mine, Bendigo

    By M Hernan

    Bendigo Mining Limited has established a modern underground gold mine and processing plant at Bendigo in central Victoria. The Bendigo goldfield produced around 22 000 000 oz of gold between 1851 and

    Jan 1, 2008

  • AUSIMM
    The Composition of the Peko Copper Orebody, Tennant Creek

    The Peko copper orebody is associated with a body of magnetite rock which it has partly replaced. The primary ore averages about 9 per cent. copper and 4 dwt. gold per ton and locally IS much richer.

    Jan 1, 1955

  • AUSIMM
    The Engel Model-A Simulator for Optimizing Exploration Effort

    By Rowlands N. J, Zimmermann D. O

    The Engel Model search simulator is described with particular emphasis on preparation of input parameters. The computer has a "black box" role in the same way a telephone or radio is a "black box"

    Jan 1, 1974

  • AUSIMM
    Processing of Pisolitic Iron Ore at Mesa J

    Robe River Iron Associates (RRIA or Robe) is widely regarded as the worldÆs most cost-effective, consistent and reliable supplier of iron ore. It has been in operation since 1972 and globally is the f

    Jan 1, 2000

  • AUSIMM
    A Tracer Study of Discharge Segregation from a Paul Wurth Hopper

    By Jones JJ

    A laboratory study of size segregation is described using a model of a Paul Wurth hopper industrailly employed for blast furnace charg- ing purposes. Experimental charge materials used in the study

    Jan 1, 1984

  • AUSIMM
    No. 3 Shaft Winders and Winder House

    The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were

    Jan 1, 1957

  • AUSIMM
    Minimising cost of rheology control additives for iron ore slurries/tailings for enhancing processing performance

    By Y K. Leong

    Occasionally additives are used in the wet processing of iron ore tailings and slurries, for examples, in the thickening of tailings with flocculant to recover process water, and in the smooth pumping

    Sep 18, 2023

  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    Stress and D Formation of Mine Openings

    Flat jack stress determinations in selected colliery roadways have revealed a range of measured stress from 330-p.s.i. tension to 3,750 p.s.i. compression. Photoelastic examination of loaded plastic a

    Jan 1, 1963