Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of new performance prediction models for a raise boring machine based on indentation tests

    By C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas

    Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different

    Nov 29, 2022

  • AUSIMM
    New Zealand Institute of Mining Engineers

    I would take this, opportunity of thanking you for the high honour you have conferred on me in electing me to the responsible position of President. You may rest assured I will use my best endeavours

    Jan 1, 1901

  • AUSIMM
    Geometallurgical Sampling and Resource Estimation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Sep 5, 2011

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014

  • AUSIMM
    Automated Train Ore Transport

    By J Fisher, M Castro, A Hariyadi

    The train haulage system being designed for PT Freeport Indonesia’s Grasberg Block Cave (GBC) will be located within the mine at an elevation of almost 3000 m above sea level on the west side of the i

    May 9, 2016

  • AUSIMM
    Beyond Mine-to-Mill - Circuit Design for Energy Efficient Resource Utilisation

    By A R. Bye

    Energy comes at great cost to our world and societies and therefore we should use it wisely and optimally. Societal pressure is enforcing this and the industry must respond by being proactive.The mine

    Jan 1, 2009

  • AUSIMM
    Maximising resource utilisation in South Africa – the BIF story

    By A Singh, C Da Corte

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are typically composed of iron oxides (hematite and m

    Nov 8, 2021

  • AUSIMM
    Differences of Opinion in the Recent Geological Report on Broken Hill, N.S.W.

    IN the recent monograph on Broken Hill, N.S.W., by E. C. Andrews,* two independent petrological reports appear as Appendices 1 and n, by W. R. Browne and F. L. Stillwell respectively. In these conside

    Jan 1, 1924

  • AUSIMM
    Removal of Rate-Limiting Iron Precipitates from Low-Grade Copper Ore during Bacterial Leaching

    By Ralph B. S

    Bacterial leaching of low grade quartz felspar porphyry copper ore was studied in large-scale laboratory percolation leaching columns.Limitations in the release of soluble copper showed up before fift

    Jan 1, 1981

  • AUSIMM
    Use of Metallurgical Test Data in Resource Evaluation for Magnetite Deposits

    By J N. Farrell

    Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge

    Jul 11, 2011

  • AUSIMM
    Adjusted Real Option Valuation to Maximise Mining Project Value - A Case Study Using Century Mine

    By M Nehring, E Topal

    Nowadays mining projects are seeking new versions of evaluation that are based on the flexibility in the project. Real option valuation (ROV) is one of the modern evaluation methods that provides a to

    Jan 1, 2009

  • AUSIMM
    Rolling Mills finishing Processes Analysis

    By Atalla YM

    Steel rolling mill product finishing pro cesses gradually become or often already are unsuited for current production and marketing conditions. Indications are made as to what has been done to (i)

    Jan 1, 1975

  • AUSIMM
    Phytostabilisation and Phytomining – Principles and Successes

    By R L. Chaney, M Mahoney

    Mine and ore beneficiation wastes and smelter contaminated soils often cause phytotoxicity and threaten adverse environmental effects if not remediated. Science has clarified both the risks from soil

    Jul 16, 2014

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Tellurium in the Ores of the Hauraki Goldfields

    New Zealand has often been quoted by metallurgists and others as one of the countries in which Tellurium is found, and locally it has been recorded that appreciable quantities of tellurium have been m

    Jan 1, 1901

  • AUSIMM
    Cultural Challenges in Chinese/Australian Mining Mergers and Acquisitions - A CEOÆs Perspective

    By Y Zhu, W Liang, P Knights

    In recent years, Chinese companies have invested billions in Australian mineral exploration, development and processing. In 2008 - 2009 alone, the Foreign Investment Review Board approved $26.4 B of i

    Nov 20, 2012

  • AUSIMM
    Enhanced Drilling in Rio Tinto

    Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation is to improve the accuracy and consistency of mining processes and less

    May 1, 2010

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011

  • AUSIMM
    The Dissolution of Gold in Cyanide Solutions-An Electrochemical Study

    By Koch D. F A

    An electrochemical study of the dissolution of gold in aerated cyanide solution shows that the dissolution rate is determined by the nature of the surface. A passive film (probably a basic cyanide) fo

    Jan 1, 1964

  • AUSIMM
    Tunnel Construction by TBM Sand Bar Hydroelectric Project

    This paper discusses the recently com- pleted TBM-driven pressure tunnel at the Sand Bar Hydroelectric Power Project. The Sand Bar Project is a diversion scheme situated on the middle fork of the S

    Jan 1, 1987