Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave Operations

    By G Chitombo, A Perryman, A D. Campbell, J White, B Hollis

    This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable

    May 9, 2016

  • AUSIMM
    Iron ore transfer chutes – directions after 30 years of scale modelling

    By P Donecker

    Like all chains, iron ore values chains are only as strong as their weakest link, which in ore processing is often the humble chute. While mechanically the simplest element in the iron ore flow sheet,

    Sep 18, 2023

  • AUSIMM
    Rosedale Outfall Project – Overcoming Extreme Conditions

    By T Ireland

    The Rosedale Outfall Project utilised an earth pressure balance (EPB) tunnel boring machine (TBM) for only the second time in Auckland. Although the tunnel was excavated fully through East Coast Bays

    Mar 8, 2011

  • AUSIMM
    The Artificial Ventilation of the Broken Hill Proprietary Mine, N.S.W.

    UNLIKE coal mines, in which some form of artificial ventilation is rendered necessary by gases given off by the material mined and is also enforced by the mining laws of all countries, metalliferous m

    Jan 1, 1921

  • AUSIMM
    Practical Considerations when using Auxiliary Axial Flow Fans as a Primary Mine Fan

    By D Roughsedge, J van der Sandt, L van den Berg

    Axial flow fans are commonly used as auxiliary fans in underground mines to supply air to development headings. As diesel dilution requirements increase the fans used in conjunction with ventilation b

    Jul 1, 2013

  • AUSIMM
    Modelling Blast Movement for Grade Control at an Open Cut Gold Mine

    By E J. Sellers, A Cocker

    Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref

    Aug 18, 2014

  • AUSIMM
    Acid Progress for Alumina Extraction

    The CSIRO acid alumina employs the essential steps of digestion, hydrolysis and calcination to produce pure alumina from ores too high in silica or too low in grade for the Bayer process. The two latt

    Jan 1, 1963

  • AUSIMM
    Mine Water - Optimising for Site and Environment

    By P Thompson, B W. Atkinson

    Water treatment is not æcore businessÆ for mining companies.Just as mineral ores and coals are unique, each requiring detailed characterisation and pilot-testing to determine their optimum beneficiati

    Nov 26, 2013

  • AUSIMM
    The Copper-Lead-Sulphur System at High Temperatures, and its Application to Continuous Copper Drossing

    By Willis GM

    The matte-metal-equilibria in the system Pb-Cu-S have been studied at temperatures between 720 and 920¦C by direct sampling and D.T.A. methods. These results are compared with those of other worker

    Jan 1, 1975

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Fimiston Open Pit

    By Neill A, O&apos

    The City of Kalgoorlie/Boulder is situated approximately 600 kilometres to the east of Perth (Fig. 1), and is the major regional centre of the Eastern Goldfields, supporting a population of approxim

    Jan 1, 1991

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    Bubble Coalescence Behaviour in Dissolved Air Flotation Froths (Centenary of Flotation Symposium 2005)

    By S J. Neethling and, S J. R Simons

    In this paper the effect of humic substances (natural surfactants), electrolytes and solid particles on bubble coalescence, and as a consequence on froth stability, have been investigated. In this stu

    Jan 1, 2005

  • AUSIMM
    The Australian Mining Industry

    Your Worship the Mayor, Ron McCullough; the Honourable Tony McGrady M.L.A., Minister for Minerals & Energy; distinguished guests, ladies and gentlemen.It's both a pleasure and a privilege to have

    Jan 1, 1993

  • AUSIMM
    Modelling the Impact of Flash Flotation from Batch Cell Flotation Tests Using Limn

    By P Holtham, R Dunne, D Stoll

    Flash flotation is a process designed to remove coarse, liberated, fast floating minerals from hydrocyclone underflow. Irrespective of liberation, coarse particles would normally remain in a grinding

    Oct 29, 2012

  • AUSIMM
    Selective Open Pit Mining and Ore Treatment at Croydon Gold Mine, North Queensland

    By Kandemir H, Stafford G

    The Croydon Gold Mine is located in northwest Queensland and is a joint venture between Central Coast Exploration N.L. and Pancontinental Mining Ltd. The mining operation commenced in 1987 and co

    Jan 1, 1989

  • AUSIMM
    Flotation Mechanism Design for Improved Metallurgical and Energy Performance

    By R Coleman

    The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.

    Aug 8, 2011

  • AUSIMM
    Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mine

    By B J. Hutchison, S Gannon, J Chambers, D Oko-oboh

    The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min

    Sep 20, 2017

  • AUSIMM
    Manganese ù From Waste to High-tech Material

    By M D. Urbani

    HiTec Energy Ltd has been conducting research since 1996 into novel process routes for the treatment of low-grade and waste manganese sources for the production of high value and high quality electrol

    Jan 1, 2004

  • AUSIMM
    Improving stope extraction in the Hidden Secret orebody at Mt Charlotte Gold Mine

    By B Lance, D O’Brien

    The Hidden Secret ore body is located within the Mt Charlotte underground mining system in Kalgoorlie, Western Australia. Mineralisation of the Hidden Secret ore body is lode style and therefore diffe

    Mar 15, 2021