Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Lateral Crater Test in Open Pit Blasting Parameters Optimisation

    By Y M. Wang, W Z. Liu, L F. Li, X L. Zhang

    Based on the blasting crater theory, the equation between k under typical cases and burden line, charge height was obtained by open pit bench blasting analysis model. The model was calculated with min

    Aug 24, 2015

  • AUSIMM
    Dampier Port Upgrade Project - An Overview of Engineering, Procurement and Construction Management Project Management

    By A Radici, S Russell

    The Dampier Port Upgrade was completed in 2007 and is the largest project in Rio Tinto Iron Ore's expansion program. The project doubled Dampier Port's iron ore shipping capacity over a five

    Jan 1, 2009

  • AUSIMM
    Interdisciplinary Approach to the Analysis of Acid Mine Drainage at an Underground Lead Zinc Mine

    By Williams RE, Ralston DR

    Acid mine drainage is a serious environmental and economic concern, resulting in regulation of the mining industry and significant water treatment costs. An interdisciplinary approach is needed to a

    Jan 1, 1988

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Liquefaction behaviour of tailings under cyclic simple shear testing

    By A Li, H Jinto, M Laxman

    The behaviour of tailings under cyclic loading has an impact on the stability and deformation of tailings dams and a good understanding of the cyclic behaviour of the tailings under earthquakes is imp

    Jul 23, 2018

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Oxidative Dissolution of Nickel Sulphide Precipitated from a Nickel Refinery Waste Stream

    By Dyson NF

    Nickel sulphide precipitated from waste liquors at the Yabulu plant of Queensland Nickel Pty Ltd was pressure leached under various conditions. Leaching at 130¦C and 700 kPa of air dissolved 95 pe

    Jan 1, 1984

  • AUSIMM
    Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency

    By F Musa

    One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput

    Aug 8, 2011

  • AUSIMM
    An Exploratory Study Of Pre-Nucleated Pelletisation

    By Adamiak Z. P, Nicol S. K

    An exploratory study has been carried out on the applicability of pre-nucleated feed in pelletising operations. Measurements of the pellet quality parameters showed that iron ore pellets prepared

    Jan 1, 1974

  • AUSIMM
    Crown and Rib Pillar Recovery Techniques in Underground Hard Rock Mining

    By Szymanski J, Planeta S

    For many hard rock mines with near surface deposits, the surface crown pillars form the first line of protection for the immediate underground workings. Underground stopes are typically contained by

    Jan 1, 1995

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    Explosibilities of Selected Queensland Bowen Basin Coal Dusts

    By Jensen B

    The investigation of the explosion characteristics of nine Bowen Basin (Central Queensland) dust samples in a suitable coal dust explosion chamber using a new dust concentration probe provides several

    Jan 1, 1991

  • AUSIMM
    Search for Low Grade Iron Ores Amenable to Beneficiation

    By Gilbert DJ, Lemon NM

    A case history of a two year study of low grade ores in the Middleback Range area with the objective of defining possible areas of interest from a combination of geological- petrological-metallurgic

    Jan 1, 1975

  • AUSIMM
    Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy Assessment

    By R Ahola, M D. Henschel, M A. McParland

    With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr

    Nov 5, 2014

  • AUSIMM
    Geology of Beltana

    Willemite mineralization was discovered in 1966 in the North Flinders Ranges of South Australia, in the course of a stream sediment sampling programme. Further work outlined a total of nine separat

    Jan 1, 1975

  • AUSIMM
    Mathematical Modelling of Heat Transfer in Flash-Smelting Burners

    By Taylor R. N

    Flow simulations have been performed on the flash-smelting burners currently used at KNS. This paper presents studies of the heat transfer between gas and particles at the burner exit. Gas and parti

    Jan 1, 1992

  • AUSIMM
    An Integrated Approach to Evaluation of Blasts - A Case Study

    By Chung S

    The problems associated with equating calculated and measured properties of explosives with blast results are examined. The results from six full-scale test blasts in a limestone quarry are describe

    Jan 1, 1990

  • AUSIMM
    The Break Up of Recoverable Reserves at High Cut-offs

    By Armstrong M, Kleingeld W. J

    Current low prices for many metals mean that deposits have to be mined at high cut-offs (relative to their mean grade), which means that only a small percentage of mining blocks are above cut-off.

    Jan 1, 1995

  • AUSIMM
    Optimizing Exploratory Drill Hole Locations

    By Baafi EY, Chatterjee PK

    The quality of mine planning decisions ultimately depends on reliable estimates of the characteristics of the orebody. The quant- ifiable factors such as grades or thickness can be estimated from f

    Jan 1, 1986

  • AUSIMM
    Presidential Address (ab70c965-00cf-4b02-a258-10f691bb3809)

    May I first of all say that I am fully conscious of the great compliment paid to me when I was invited to accept the Presidential Chair for this current year. I realise that it is an onerous task by

    Jan 1, 1951