Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Practical Implementation of Dewatering and Depressurisation in Large Open PitsAll large open pits in Australia have been mined, or are planned to be mined well below the local water table. This raises several issues that impact on mine safety, mining costs and regulatory approv
Jan 1, 2003
-
Micro Computers Assist in Extinguishing a Bituminous Coal Mine FireBy Klinefelter G
The United States Steel Mining Co., Inc. recently experienced a major mine fire at the Cumberland Mine. This mine is located in Greene County, Pennsylvania, U.S.A. and is mining a high volatile bi
Jan 1, 1988
-
Light RailwaysThe story of the rise, progress, and development of our modern railway system is a long but an exceedingly interesting one. The phases it has passed through, the discussions that have arisen from time
-
Robust Decision Making û Application to Mine Planning Under Price UncertaintyBy F Grobler
Many projects fail because project performance in unfavourable economic conditions was not anticipated at the investment decision stage. This type of failure may have been avoided through the selectio
Sep 26, 2011
-
The True Values and Uses of Coal Seam Gas WaterArrow Energy NL has been operating a number of coal seam gas wells in the Darling Downs region of Queensland. At the time of writing this paper, the region is enduring an extended drought period. The
Jan 1, 2006
-
Cayeli Mine journey to become a safer mine with an innovative approach – Think! Safety ProgramBy S Flanagan, M M. Mete, A R. Tiryaki, M Guresci
First Quantum Minerals (FQM) operates the Cayeli underground copper mine in Turkey. In response to a lost time incident (LTI) that occurred at the mine in 2022, the mine management decided to introduc
Apr 16, 2024
-
Hydraulic Boulder Fragmentation Using Small Explosive ChargesBy P Worsey, B Lane
The recommended maximum explosive weight for boulder blasting using internal charges is 0.15 kg/m 3 (Olofsson, 1988). Normally this charge results in excessive scattering and flyrock, creating increas
Jan 1, 1999
-
Copper Converter Slag Treatment at Mount Isa Mines Limited, Mount Isa, QldBy Hare S. M, Lumsdaine I, O&apos
Converter slag assaying 3.7 per cent Cu is produced by Mount Isa copper smelter at a rate of up to 180 000 tonnes per annum.Priority is given to the processing of ore, however concentrator capacity pe
Jan 1, 1993
-
Cambrian Tectonics and Mineralisation in Western TasmaniaBy Keele R. A
The Cambrian structure in the Mt Read Volcanics was produced by four deformational events: obduction of forearc-derived mafic/ultramalic complexes in the early Middle Cambrian, a middle Middle Cambr
Jan 1, 1997
-
Studies in Size Separation by ScreeningLaboratory studies of batch and continuous screening of ferrous sinter mixtures (4-0.5 mm) are described. The results are analysed by an equation derived from the first-order rate law for the conditio
Jan 1, 1985
-
Northparkes Mines ù Design, Sudden Failure, Air-Blast and Hazard Management at the E26 Block CaveBy A van As
This paper serves to outline the circumstances and causes of the air-blast that occurred at Northparkes Mines in November 1999. It describes the design of the mine, the geotechnical issues surrounding
Jan 1, 2005
-
Arsenic and the Revegetation of Tailings DamsBy D Craw
A glasshouse experiment was set up to investigate arsenic uptake in rye corn grown in different arsenic rich substrates. Sods of material were taken from various locations and planted with rye corn se
Jan 1, 2007
-
Refining Bullion at Mount Morgan, QueenslandFOR some years after the erection of the first chlorination plant at Mount Morgan the ore sent to the works for treatment was mined entirely from the oxidized zone; consequently, the bullion recovered
Jan 1, 1911
-
The Role of Flotation Frothers in the Particle-Bubble Attachment ProcessBy He BQ
Static attachment of bubbles to solids is contrasted with dynamic attachment in flotation cells. The times of contact during particle-bubble collisions in dynamic attachment are compared with the
Jan 1, 1984
-
Geotechnical monitoring at the Porgera MineBy Yambu J, Titus K
Geotechnical investictations and monitoring have been integral to development of the Porgera Gold Mine. The steep, unstable terrain has required a program for monitoring of slopes and foundations whic
Jan 1, 1994
-
Application of Gas Suspension Calciner in Relation to Bayer Hydrate PropertiesBy Nickelsen J, Theisen KG, Hansen PH
The use of stationary calciners in the processing of aluminium hydroxide has emphas- ized the importance of Bayer hydrate properties with respect to particle breakdown during calcination and subsequ
Jan 1, 1981
-
Classification And Quantification of Ore Grain Textures of the Hilton North Deposit, Mount Isa, Queensland, AustraliaStudying the ore textures in a discrete orebody is a novel approach to estimating liberation potential of the ore minerals present. As part of a PhD thesis, this project aims at classifying and quanti
Jan 1, 1993
-
Assessing corrosion of reinforcement on a large scaleBy N Power, R Hassell, E Jones
Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels
Nov 29, 2022
-
Underground Ventillation Network Analysis by Using Graph TheoryBy Tominaga Y
Mine ventilation control is one of the most important techniques to suppress the disastrous region within a limited area, to have enough time of emergencies (ignitions, fires and so on) for undergr
Jan 1, 1981
-
Grade Control at a Multi-Source Operation - Mount Isa Lead Mine, Mount IsaBy N Davies, M J. Coward, P L. Hissey
Mount Isa Mines has four mining operations in Mt Isa with the X41 and Enterprise Mines producing copper and the Lead Mine and George Fisher producing lead zinc and silver. Each stream contributes ore
Jan 1, 2002