Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Big Diameter Tunnelling Beneath Low Rock Cover

    By N McKenzie, F Brodbeck

    The North-South Bypass Tunnel is the first project to get underway as part of BrisbaneÆs transport plan, which aims to improve the urban road network. The total length to be excavated is 6.8 km, which

    Jan 1, 2008

  • AUSIMM
    Validation of the AMIRA P9 Flotation Model Using the Floatability Characterisation Test Rig (FCTR)

    By J-P Franzidis

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant. It was developed as part of the AMIRA P9 project, primarily to determine ore floatabilit

    Jan 1, 2007

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    Planning and Installation of the New Underground Winder (No. 2 Hoist) on the Rosebery Mine Inclined Shaft

    This paper traces briefly the reasoning which led to the decision to extend the existing internal shaft at the Rosebery Mine and to instal underground a larger winder (No. 2 Hoist) with capacity to ha

    Jan 1, 1958

  • AUSIMM
    Renewing Rail Guides in a Winding Shaft

    The paper describes the preparation of new rail guides, removing existing rails, and replacing with new rails in a vertical winding shaft.INTRODUCTIONThe general practice in coal winding shafts is the

    Jan 1, 1947

  • AUSIMM
    Faulting in the Black Star Mine

    This paper records the observations of faulting in the Black Star mine workings. By classifying the faults into two groups, i.e., strike faults and transverse faults, and by pointing out the differenc

    Jan 1, 1953

  • AUSIMM
    Geophysical Prospecting (228be4ed-fbf9-4871-ae4e-1a7ba294500f)

    IT is intended herein: to make some brief comments on geophysical 'work in general and on the various methods, and then to refer to that branch which, perhaps, is of the greatest importance and i

    Jan 1, 1928

  • AUSIMM
    The Key Issues in 1982 Carbon-in-Pulp Technology

    By Menne DM

    The carbon-in-pulp (CIp)process has become well accepted and firmly established in the gold industry of South Africa and, at this stage, six large CIP plants are treating close to I million metric to

    Jan 1, 1982

  • AUSIMM
    Survey of the Sea Bottom in Connection with Working Coal Under Tidal Waters

    The paper deals with the taking of soundings in connection with coal mining operations under part of the Pacific Ocean adjoining John Darling Colliery.INTRODUCTIONIn the early days of mining in the Ne

    Jan 1, 1947

  • AUSIMM
    Lignite Mining at German Democratic Republic with Special Consideration of Overburden Conveyor Bridges (OCB) and Direct Dumping Combinations (XPS)

    The GDR has extensive lignite deposits at its disposal, which formed the basis for the development of an independent energy source after 1945 and which will retain their significance well beyond th

    Jan 1, 1989

  • AUSIMM
    Assessment of Options for Economic Processing of Preg-Robbing Gold Ores

    By K Buda, W Staunton, M Hill, V Tjandrawan

    One of the challenges facing the gold industry in the 21st century is the continuing need to identify new reserves of economically treatable ores. Discoveries of large, metallurgically simple orebodie

    Jan 1, 2007

  • AUSIMM
    Geology and Exploration on Mount Isa Prospecting Area

    During October 1947 an Authority to Prospect was granted by the Minister of Mines to lVIount Isa Mines Limited over an area of approximately 75 sq. miles to the north of Mount Isa.Application for the

    Jan 1, 1953

  • AUSIMM
    Evaluation of Solids Suspension in a Pilot-Scale Mechanical Flotation Cell

    By D A. Deglon

    Solids suspension is important in the design and operation of mechanical flotation cells, and is a necessary precondition to particle collection. Most of the fundamental hydrodynamic research that inc

    Jan 1, 2005

  • AUSIMM
    A Downhole Magnetic Tensor Gradiometer for Developing Robust Magnetisation Models from Magnetic Anomalies

    By C A. Foss, K Blay, K Leslie, D Hillan

    Magnetic field studies provide remote sensing of magnetisation distributions and a means to investigate moderately- to strongly-magnetised ore deposits that may be partially or totally buried. However

    Jul 13, 2015

  • AUSIMM
    A Revised Stratigraphic Framework for the McArthur Basin, NT

    By Haines P. W, Sweet I. P, Rawlings D. J, Page R. W, Plumb K. A

    Current regional geoscientific studies across the McArthur Basin as part of the National Geoscience Mapping Accord by the Northern Territory Geological Survey and Australian Geological Survey Organ

    Jan 1, 1994

  • AUSIMM
    A Fully Integrated Approach to Mine Planning for Proposed Mineral Sand Projects

    This paper examines the complex interplay of deposit characteristics, mining plans, tailings disposal techniques and rehabilitation requirements on planning for mineral sands operations. All component

    Jan 1, 2001

  • AUSIMM
    Underground Mine Fire Prevention at the South Mine, Broken Hill

    SINCE 1900, five underground fires of consequence have beenrecorded in the Broken Hill mines. These occurred at the Junction(1906), Proprietary (1906 and 1916), Block 14 (1906), and Centralmines (1923

    Jan 1, 1929

  • AUSIMM
    The Consultant Contribution to Major Australasian Mining and Mineral Processing Projects

    The last decade has seen a dramatic change in the. size and complexity of mining and mineral processing projects in Austral- asia. Major projects of today are vastly different from major projects of

    Jan 1, 1975

  • AUSIMM
    The Geology and Development of The Farm Fanning Gold Deposit

    By Houtgraaf M

    The Far Fanning gold deposit is situated 60 kilometres south-west of Townsville (Fig. 1). Previous recorded production is 3756 tonnes returning about 1600 ounces of gold. This has been taken from surf

    Jan 1, 1986

  • AUSIMM
    Futuristic Surface Mining Technology

    By Collins J. L, Fytas K

    Surface mining accounts for more than 50% of the world's total mineral production. In future years this status is expected to change somewhat in favour of surface mining. The production technol

    Jan 1, 1988