Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Fabrication of Porous Copper and Porous Copper Based Alloys with Controllable Pore Structure

    By Y. X. Li, L. R. Xiao, S. Gong, S. S. He

    Porous copper and porous copper based alloys with controllable pore structure have been manufactured successfully by sintering evaporation process. This process consisted of mixing copper or copper ba

    Jan 1, 2019

  • CIM
    The Precipitation of Copper from Mine Waters at Britannia Mines, B.C.

    By F. Ebbutt

    The copper-bearing waters now treated successfully at Britannia for the recovery of their copper content are almost entirely derived from what is known as the Fairview mine; this was the first extensi

    Jan 1, 1928

  • CIM
    The Treatment of Waste Slag Containing Hexavalent Chromium Using Sintering Method

    By Z. -G. Ren, J. -S. Qian, Y. -G. Yang

    The waste slags from chemical and metallurgical plants contain approximately wt 1% water soluble Cr6+. This hexavalent chromium is very harmful to human health, and the treatment of the slags has conc

    Jan 1, 2004

  • CIM
    The Mineral King Mine

    By W. W. Cummings

    The Mineral King Mine, owned and operated by Sheep Creek Mines is located in the Purcell mountain range of southeastern British Columbia. Production of lead and zinc concentrates commenced in 1954 som

    Jan 1, 1960

  • CIM
    7th Müller Award Lecture Engineering in Fractured Rock Masses

    By J. A. Hudson

    "The paper begins with a brief summary of Professor Müller’s formation of the ISRM and the contents of the previous six Müller lectures with their emphases on rock fractures. The geological origin of

    Jan 1, 2015

  • CIM
    The Du Pont Sequential Blasting System

    By D. O. Tansey

    This paper will describe the mechanisms involved in delay blasting and how they are applied with the use of D.S.B. It will examine the control of potential damage resulting from detonations, and show

    Jan 1, 1979

  • CIM
    Process Control in Gold Milling at Noranda's Hemlo Gold Mines Inc.

    By C. Larsen, R. A. Walker, A. Voth, C. Daoust

    "The 3000 t/d mill at Hernia Gold Mines Inc. was commissioned in March, 1985. By Canadian standards the concentrator is highly automated, however, unlike the retrofit systems in many other plants, the

    Jan 1, 1988

  • CIM
    Recovery of Hematite from HPAL Residue of Laterite Ore

    By G. Azimi, C. A. Ang, F. Zhang

    "Nickel recovery from laterite ores generates large amounts of solid and liquid wastes. This is primarily due to the low concentration of Ni (about 1.4 wt%) in the feed ore to the High-Pressure-Acid-L

    Jan 1, 2017

  • CIM
    Distributed control at the Kidd Creek grinding plant. Part I: Control strategy design

    By A. Desbiens, R. del Villar

    "This two-part paper summarizes the design and implementation of a distributed PIbased control strategy installed at the B grinding circuit, at the Kidd Creek Division of Falconbridge Ltd. Part I deta

    Jan 1, 1997

  • CIM
    Asbestos Fibre Exploration and Production Forecasts by Core Drilling: at Jeffrey Min, Asbestos, Quebec

    By George K. Foster

    The Jeffrey mine of the Canadian Johns-Manville Co., Limited, is in the town of Asbestos, situated approximately 100 miles northeast of Montreal and about the same distance southwest of Quebec, in Ric

    Jan 1, 1946

  • CIM
    The Influence of both Cation and Anion Type on Leaching Efficiency of Lanthanides from Ion-Adsorption Ores

    By V. G. Papangelakis, G. A. Moldoveanu

    "One of the major commercially viable secondary sources of rare earths elements (REE) are the ion-adsorption ores, containing 0.05-0.3 wt% rare earth oxides physically adsorbed on the surface of clay

    Jan 1, 2016

  • CIM
    Fine sizing by Cyclosizer and micro-sieve

    By M. Leroux, J. A. Finch

    "Sizing below 38 µm (400 mesh) is an increasing requirement in mill testing laboratories. The Cyclosizer is gaining wide acceptance in this role. A recent alternative is to use electro-formed sieves (

    Jan 1, 1982

  • CIM
    Development and Construction of the Antamina Surface Water Management Facilities

    By Matt Schuett

    Antamina Mine Facts • Surface Water Design Principles • Drainage Areas • SEDCAD Modeling • Impacted Runoff Collection • Clean Runoff Collection • System Flexibility • Outfall Construction

    May 1, 2004

  • CIM
    Reprocessing Of Historic Tailings from the Aunor Mine in Timmins

    By M. A. Tomlinson, A. Di Feo, T. C. Cheng

    "Goldcorp is evaluating the potential for economic reprocessing of historic tailings at several sites, including the Aunor A facility located in Timmins. The overall project is investigating the abili

    Jan 1, 2019

  • CIM
    Gold Mineralization in Archean Banded Iron Formation, Third Portage Lake Area, Northwest Territories, Canada (407bbb63-2364-4223-b699-c887fb23f7b7)

    By R. S. James, S. P. Goff, A. E. Armitage

    "Oxide-facies banded iron formation in the Third Portage Lake area is hosted by ultramafic and calc-alkaline volcanic rocks and related sedimentary rocks of the Archean (2.8 Ga) Woodburn Lake Group, 8

    Jan 1, 1996

  • CIM
    Arsenic Disposal Practices in the Metallurgical Industry

    By P. A. Riveros

    The literature on the arsenic disposal practices of the metallurgical industry and the long term stability of the disposed arsenic compounds were reviewed from a Canadian perspective. The review was c

    May 1, 2002

  • CIM
    Gold Mineralization in Archean Banded Iron Formation, Third Portage Lake Area, Northwest Territories, Canada

    By R. S. James, S. P. Goff, A. E. Armitage

    "Abstract - Oxide-facies banded iron formation in the Third Portage Lake area is hosted by ultramafic and calc-alkaline volcanic rocks and related sedimentary rocks of the Archean (2.8 Ga) Woodburn La

    Jan 1, 1996

  • CIM
    Falconbridge Mine-No. 9 Internal Shaft and Facilities

    By V I. McCallum

    In 1954, Falconbridge Nickel Mines Limited began the program of deepening the Falconbridge mine workings for 2,000 feet below the bottom, or 4025, level in order to provide twelve new levels for produ

    Jan 1, 1964

  • CIM
    Development of Mobile Inspection and Diagnostic System for Electric Power Conduit

    By Sang-Kyun Woo

    The electric power conduit (EPC) in Korea has been constructed since 1978. Facing the challenge of safety and sustainability of the EPC, it is urgent to develop an inspection strategy and maintenance

    Aug 1, 2013

  • CIM
    Alkali-Alumina and MgO-Alumina Molar Ratios of Altered and Unaltered Rhyolites

    By R. E. Whitehead

    "Abstract - Alkali-alumina and MgO-alumina plots are an effective instrument for displaying chemical and mineralogical compositions of altered and unaltered rhyolites and rhyodacites. They reveal that

    Jan 1, 2006