Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Drum Hoisting in North America ? Approach to Design

    By Mike Robotham

    When RFQ?s are received they often contain detailed technical specifications which suggest a departure from the suppliers own customary approach to the design. Both client and end user are quite right

    May 1, 2011

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • CIM
    The Development of a Novel Zinc Collector Using Both Lab and Mil Scale Trials

    By D. E. M. Plaumann, B. S. Fee, R. D. Hansen, R. R. Klimpel

    "The steps from experimental curiosity through to commercial product can be slow and tortuous in spite of the quality of the technological advances offered by the new development. Data generation and

    Jan 1, 1990

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore (13a41608-dfe4-4266-9026-6b4afd0847bf)

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • CIM
    Metamorphism of Witwatersrand Gold

    By H. E. Frimmel

    Abstract - Most of the gold in the Late Archean Witwatersrand Basin is of detrital origin but, in its present form, it is metamorphosed. The only relict detrital features preserved are the morpho­logi

    Jan 1, 1994

  • CIM
    Geology, Geochemistry and Mineralization at Falconbridge's Lac Short Gold Deposit, Gand Township, Quebec

    By A. Gauthier, J .. E. Muir, M. Cormier

    Falconbridge's Lac Shortt gold deposit is located in Gand Township, some 25 km north-east of Desmaraisville, The deposit was outlined in i980 by a drilling program me conducted by Falconbridge Ltd. in

    Jan 1, 1984

  • CIM
    Variable speed SAG milling

    By M. N. Brodie

    "The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to

    Jan 1, 2003

  • CIM
    Shovels And Draglines In Western Canada and Factors Affecting Hoist-Rope Service

    By R. G. Hamm

    A brief outline covering the shovels and draglines in use in the open-pit mines of Western Canada, including British Columbia, Alberta and the Yukon, is given, followed by the procedure for the select

    Jan 1, 1979

  • CIM
    New Opportunities for Closed Mining Sites: Bioprospecting for Antibacterial Agents

    By G. N. A. Senhorinho, J. A. Scott, C. A. Laamanen

    "Closed mine sites are widely regarded as a negative asset due to their legacy of environmental impacts. These sites are often characterized by waterbodies with elevated metal concentrations and low p

    Jan 1, 2019

  • CIM
    Selective Extraction and Recovery of Gold, Copper, and Other Base Metals from Mine Leach Cyanide Solutions Using Molecular Recognition Technology (MRT)

    By Ronald L. Bruening

    IBC has developed a cost effective MRT process for the selective extraction and recovery of gold, copper, and a mixture of other base metals from mine leach cyanide solutions. This is a two-stage syst

    Oct 1, 2003

  • CIM
    Mineral processing, research and development projects in Nova Scotia conducted through the Canada/Nova Scotia Mineral Development Agreement

    By D. M. Doyle, P. J. Hannon

    "The Canada/Nova Scotia Mineral Development Agreement (M.D.A.) is a subsidiary of a five-year Economic and Regional Development Agreement, signed on June 11, 1984. The objectives of the M.D.A. are to

    Jan 1, 1987

  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • CIM
    Advances in Cobalt Processing

    Cobalt mostly occurs as a minor, but valuable, constituent in most nickel and a few copper ores, however it is not generally found alone in commercially viable deposits. Its concentration and extracti

    May 1, 2009

  • CIM
    A Novel Model for Risk Assessment of Adjacent Buildings in Tunnelling Environments

    By Limao Zhang

    This paper presents a novel model to assess the risk of adjacent buildings in tunnelling environments based on Extended Cloud Model (ECM). ECM is an organic integration of Extension Theory (ET) and Cl

    Aug 1, 2013

  • CIM
    Lithium: Usage, Demand and the Québec Lithium Mine

    By Charles Taschereau

    The statements made in this presentation contain certain forward-looking statements concerning potential developments affecting the business, prospects, financial condition and other aspects of Canada

    May 1, 2011

  • CIM
    Bubble Load Measurement in the Pulp Zone of Industrial Flotation Machines - A New Device for Determining the Froth Recovery of Attached Particles

    By David Seaman, J-P Franzidis, Emmy Manlapig

    "A new device has been developed to directly measure the bubble loading of particle-bubble aggregates in industrial flotation machines, both mechanical flotation cells as well as flotation column cell

    Jan 1, 2004

  • CIM
    Oxidation-Precipitation Method to Treat Cyanide Effluents

    By H. Soto, J. Jara, F. Nava

    "A combination of oxidation and precipitation was used to eliminate cyanide from gold milling effluents. Preliminary laboratory work developed with both synthetic cyanide solutions and with industrial

    Jan 1, 1992

  • CIM
    Modifications to the process gas handling system at Kidd Creek's copper smelter

    By C. J. Newman, R. J. St. Eloi, G. Macfarlane

    "The Kidd Creek copper smelter has been expanded from its original design of59000 tonnes of copper per year to over 120 000 tonnes per year. Modifications to the process gas handling system and acid p

    Jan 1, 1994

  • CIM
    Cable Shovel Simulation leading to A Novel Dipper Design

    By Ning Shi

    This paper suggests an alternative design approach for an innovative shovel dipper, for use in ground conditions where cutting of virgin ground rather than scooping of blasted material is required. No

    May 1, 2004

  • CIM
    All-Hydraulic Bucket-Wheel Excavators (A Synopsis)

    By Walter Durst

    On October 16, 1978, the Harnback open cut of Rheinische Braunkohlenwerke, the largest open cut ever planned, was officially put into operation. It will outperform all of the large open cuts known at

    Jan 1, 1979