Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Uncertainty and Reliability Appraisal of CPT-Based Methods for Axial Pile Bearing CapacityBy Abolfazl Eslami, Sara Heidarie Golafzani
CPT-based methods considered as complementary tools for static analyses outperform other axial pile bearing capacity predictive methods. Considering soil spatial variability and minor errors associate
Sep 8, 2021
-
Retaining Structure for Berth at KrishnapatnamBy P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
Pile Foundations General - .1 Equipment informationBy Bengt H. Fellenius
.1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1
Jan 1, 1991
-
Performance Of Drilled Displacement Piles In The Midwestern United StatesBy W. Morgan NeSmith
Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp
Jan 1, 2009
-
Engineering Sustainability"What can we do in ground engineering to reduce damage to the environment, to repair historic pollution, to reduce our demand on basic resources and to reduce the carbon footprint of our industry? Som
Jan 1, 2009
-
The Effect of Helix/Wing Plate Deformation on End Bearing Resistance of Screw PilesBy Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"The use of steel screw piles has greatly increased in recent years because of the advancement in the installation mechanism and its performance under compressive, uplift and lateral loads. In a steel
Jan 1, 2015
-
Friction Loss in Tieback Anchors used for Landslide StabilizationBy John P. Turner, Benjamin J. Turner
"Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho
Jan 1, 2017
-
Analytical Expression for Plastic Hinge Length in Extended Pile-shaftsBy M. Hesham El Naggar, Mehdi Heidari
"Equivalent fixed-base cantilever model is a common approach for performance base seismic design of bridge structures supported by extended pile-shaft. In this method, global displacement ductility fa
Jan 1, 2017
-
Wolf Creek Dam Foundation Remediation – An Innovative SolutionBy Fabio Santillan, Lyndon Bedford
"This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra
Jan 1, 2015
-
Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile ComparisonBy David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard
"Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l
Jan 1, 2017
-
Installation and Efficiency of Common Helical Pile CouplingsBy Jason Herron, Joseph Brown
The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,
Jan 1, 2019
-
Concrete Filled Steel Tubes for Deep Foundations of Transportation StructuresBy Charles Roeder, Amy Leland, Dawn E. Lehman
Concrete filled steel tubes (CFSTs) are composite members that are commonly used in many countries today. CFST components are used in the United States, but they are more common in Asia, in part becau
Jan 1, 2019
-
Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, CanadaBy Shawna Munn, Carol Dounitch, Erika Acton
The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi
Oct 1, 2022
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, GaBy Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense SandsBy Nabil F. Ismael, Khalid Farraj
"The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa
Jan 1, 2017
-
Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry PracticeBy Martin D. Larisch, Ronald Damen
The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre
May 1, 2022
-
A Review of the Design Formulations for Static Axial Response of Deep Foundations from Cone Penetration Test DataBy Fawad S. Niazi
Analysis of deep foundations in terms of axial capacity has been a topic of great interest in the soil-structure interaction problems. Soil behavior is governed by a series of complex stress-strain ch
Jan 1, 2013
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Full-Scale Tests To Evaluate Lateral Pile Resistance At The Edge Of A SlopeBy Artak D. Mirzoyan
Pile foundations near the edge of a slope are often required to resist lateral loads. This is particularly important for piles at abutments of bridges. However, very few full-scale tests are availab
Jan 1, 2007
-
Seven Mile Dam Retrofit - A Global ChallengeBy Arvindh Gupta
BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally
Jan 1, 2004