Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Mining to Reduce Future Environmental Liabilities

    By Mark A. Williams

    "This paper was originally intended to be a presentation of a case study of two surface bituminouscoal mines in the southern Appalachian coal fields located within five miles of each other. These mine

    Jan 1, 1994

  • ISEE
    Blast Designs and Diagnostics Using Portable, Solid State, High-Speed Videography Systems

    By Bruce Vandenberg, R. Frank Chiappetta, John Foley

    Recent advances in solid-state, field portable, fast framing compact video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 4.1 seconds of

    Jan 1, 2000

  • ISEE
    Partnering in Blasthole Drilling

    By Ron Lutz

    In today’s world, production is the name of the game. We are all in business to make money. In the Quarrying and Mining industry the same holds true. The primary goal is to develop the best drilling a

    Jan 1, 2000

  • ISEE
    Blastcad 3D - Three Dimensional Underground Blast Design Software

    By Patrice Favreau

    In 1990 the Noranda Technology Centre commenced a project to develop an interactive three-dimensional blast design system using a commerical computer-aided drafting and design package (CADD). The obje

    Jan 1, 1992

  • ISEE
    Influence of Distance in the Effective Use of Electronic Detonators to Control Blast Induced Ground Vibrations

    By W. J. Birch, R. Farnfield

    The use of electronic detonators to control blast vibrations has been previously established by many authors. This is performed by determining the optimum delay period between the blast holes for a pa

    Jan 1, 2009

  • ISEE
    Demonstrating Competence from Charge Hands to Chartered Engineers

    By Ken Cross

    This paper aims to demonstrate that explosives organizations and workers have a legal, moral and financial duty to be able to demonstrate their competence when required, and how that may be achieved a

    Jan 1, 2013

  • ISEE
    Blast Designs and Controls in Steeply Dipping Coal Seams

    By Ricardo Gaviria, Vincinte Acosta

    There are major blast design and field procedures differences between conventional blasting in horizontally bedded coal seams and blasting underneath coal seams in a multi seam deposit with seam incli

    Jan 1, 1995

  • ISEE
    CEE BEE ZERO TWO Construction to Destruction - A Case Study

    By Deepak Vidyarthi

    This paper deals with various measures adopted in protecting a conveyor duct (named after a Conveyor Belt that was numbered as ‘02’) housing a 1600 mm (63 inches) belt conveyor system in a large, heav

    Jan 1, 2008

  • ISEE
    Demolition Using Water-Cased Kicker Charges

    By Emily Johnson, Catherine Johnson, Rachel Bauer, Paul Pitzel

    Demolition projects involving explosives may incorporate cutting charges to sever columns in collaboration with kicker charges that “move” the columns out of alignment. Traditional kicker charges ofte

    Feb 6, 2023

  • ISEE
    "Journal: Evaluating and Managing Blasting Risk Part II"

    By Gordon Revey

    The challenge of managing blasting risk, types of risk, public perception, and a system for managing risk were covered in the first part of this article in the May/June 2000 issue of the Journal of Ex

    Jan 1, 2001

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • ISEE
    Destructive Wave Interference in Underground Blasting Utilizing Precise Timing.

    By Kurt Oakes, Paul Worsey, Braden Lusk, Tony Brasier, Jerry Chambers, Scott Crabtree, Randy Wheeler

    Destructive wave interference has been studied in theory for many years. In application however, limited information can be found. Recently, circumstances have enabled a multidisciplinary team to util

    Jan 1, 2006

  • ISEE
    Burn Cut Pull Optimization through Varying Relief Hole Depths

    By Michael Allen, Paul Worsey

    In underground blasting, the pull of the initial cut is the limiting factor for the success of the rest of the round. By improving the pull of the first cut, a critical step is made towards improving

    Jan 1, 2015

  • ISEE
    Rock Fragmentation by Explosives: Myths and Realities

    By Wilfrid Comeau

    While researching for a theme lecture (Comeau, 1993l) on: 'The Mechanics and Physics Explosives', the author of Energy Transfer in Rock Fragmentaion by was confronted with many conflicting concepts re

    Jan 1, 1995

  • ISEE
    Blasting for Rescue Applications

    By John Norman

    This paper will cover blasting techniques that are applicable to underground and other rescue that involves removing obstacles and breaking rock in close proximity to rescuers and subjects.

    Feb 1, 2020

  • ISEE
    Vibration Monitoring Using In-house Developed Devices – A Taylor’s Approach

    By Francisco Sena Leite, Pedro Brito, Auã Kiahla, Raquel Carvalhinha, Tomi Kouvonen, Vinicius Miranda

    Shockwaves that generate vibration in the surrounding environment of a blast, are one of the most important factors to control drill & blasting works near delicate buildings as well as in sensitive st

  • ISEE
    Overburden Blast Cast Designs, Factors Affecting Results and Economics

    By Connie Postupack

    The purpose of the workshop is to show the effect of various blasting factors on the overall results.

    Jan 1, 1994

  • ISEE
    Energy-based Vibration Predictor Equations and Blast Damage Index for Blasting Gallery Panels

    By Sri C. Sawmliana, P. Pall Roy

    Damage to underground roof and pillars in blasting gallery (BG) panels has been an increasingly important area of study in recent years due to the invention of new explosives and cord systems which ha

    Jan 1, 2004

  • ISEE
    The Field Application of a Low -Cost Shock Sensor

    By Rob Farnfield, Charlie Adhock

    The measurement of near-field shock has always been an attractive proposition for those working in the field of explosive and blast performance. The most commonly employed technique involves the use o

    Jan 1, 2005

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001