Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Digital Simulation of a Flotation Circuit for Design--Case StudyBy K. K. Cheng, Z. M. Chen, A. L. Mular
INTRODUCTION Since the nineteen fifties, process engineers have been seriously concerned with process models for various purposes (1,2,3). Models serve as subroutines to mathematical flowsheets wh
Jan 1, 1986
-
Eicosanoid And Cytokine Production By The Alveolar Macrophage From The Coal MinerBy John L. Stauffer, Allan Lipton, Kim Leitzel, Lesley Gaydos, Laurence M. Demers, Douglas C. Kuhn
Eicosanoids and cytokines produced by the alveolar macrophage (AM) are key mediators of pulmonary inflammation and fibrosis resulting from occupational exposure to mineral dust. In order to determine
Jan 1, 1991
-
Effect Of Air Velocity On Conveyor Belt Fire Suppression Systems ? Preprint 09-135By J. H. Rowland
Four different types of fire suppression systems were evaluated in large-scale fire experiments to study the effect of air velocity on the effectiveness to extinguish conveyor belt fires. The four dif
Jan 1, 2009
-
NAPOLI UndergroundBy Paolo Prevedini, Antonello de Risi
"The city of Naples has one of the most ancient traditions of tunneling in the world, since Roman age until today. This was due to the softness of volcanic rock covering most of the city surface, this
Jan 1, 2016
-
Removal of molybdenum and heavy metals from effluents by flotationBy J. P. Hanten, G. Ramadorai
This paper presents laboratory and pilot plant data on the removal of heavy metals and molybdenum from mining-milling waste water. Molybdenum is removed as an Fe-Mo precipitate by proper addition of f
Jan 1, 1987
-
Safety Practices and Challenges in the Powder River BasinBy William A. Holgate
Coal production in the in the Powder River Basin began its tremendous expansion during the boom of the mid-1970s. New mines were opened from 1976 through the early 1980s. This expansion soon placed Wy
Jan 1, 1994
-
CERN’s LHC Project–Large Caverns in Soft Rock at the Edge of FeasibilityBy Hans-Christian Kurzweil, Klaus Mussger
CERN, the European Laboratory for Particle Physics, are upgrading their existing particle accelerator for the next generation of experiments and have three major packages of underground construction w
Jan 1, 2003
-
Rubber-Collared Drill SteelBy Joel K. Waterland
The Homes take Mining Company at Lead, South Dakota has a yearly production of 1,868,741 tons of ore produced from horizontal cut-and-fill stopes and timber cut-and-fill stopes. This production, in ad
Jan 1, 1963
-
Land Acquisition And Quarry Development At Dundee Cement Company, Clarksville, MissouriBy Adolf U. Honkala
Dundee Cement Company was incorporated in 1958. The equity capital for the venture was supplied by a Swiss firm called Holderbank Financier and a group of its principals. Holderbank Financier, a holdi
Jan 1, 1970
-
Development Of The Air-Sparged Hydrocyclone -- A Swirl-Flow Flotation ColumnBy Y. Ye, J. D. Miller, E. Pacquet, S. Gopalakrishnan
From laboratory research activities during the past five years, it is now evident that effective flotation separations can be achieved with the high-capacity air-sparged hydrocyclone. The effectivenes
Jan 1, 1988
-
Archean Gold-Silver And Copper-Gold Deposits In The Yilgarn Block, Western Australia: Greenstone-Hosted And Shear-Zone-Controlled SkarnsBy Andreas G. Mueller
Gold-silver and copper-gold deposits with high-temperature wallrock alteration of Ca-Mg-Fe-Al silicates occur in ca. 3.0 Ga old greenstone belts of the Yilgarn Block, Western Australia. The deposits a
Jan 1, 1990
-
The Next Generation of Mixed Ground Tunnel Boring Machines - NAT2022By Brad Grothen
What is the most economical way of tunneling in mixed ground that may experience high pressures? Non-continuously pressurized, mixed ground Tunnel Boring Machines (TBMs) are being utilized to deal wit
Dec 1, 2022
-
Next Generation Mine Planning: Advanced Scientific Approach to Optimize the Extraction SequenceBy D. Spitty
There are enormous complexities with mine planning and the problem itself presents a huge challenge to the existing mine planners performing this activity. Mine planning optimization supports planner
Feb 23, 2014
-
XXL Pipe Jacking: Technological Aspects of Large-Diameter and Long-Distance Drives - NAT2024By Peter Schmäh
Pipe-jacked tunnels are considered for a large variety of applications from water and sewage, cable ducts to challenging pipeline crossings or landfall construction. In most cases, Slurry MTBMs are us
Jun 23, 2024
-
Despite Tough Times, Optimism Underlies AMC ConventionBy Jim Oehler
The US minerals industry, as well we know, has been hit hard by the recent recession and is faced with what is projected to be a slow recovery. Even so, there was an underlying feeling of optimism at
Jan 11, 1982
-
Microtunnelling In California: Using An Enlarged Shield To Excavate Multiple Tunnel DiametersBy Kimberlie Staheli
A new sanitary sewer was installed in Pleasant Hill, California using microtunnelling methods. The project consisted of 693 meters of 1372 mm and 1981 mm concrete pipe. A Herrenknecht AVN 1200 was use
Jan 1, 1995
-
Development Of A Fiberglass Cable BoltBy D. A. Peterson
Laboratory testing was completed to determine the effectiveness of a fiberglass cable bolt (FCB) as a cuttable rock support for a continuous, hard-rock mining method. The FCB consists of four Polystal
Jan 1, 1993
-
Largest SAG Mill, With Slide-Shoe Bearings, Operates In AustraliaSemiautogenous (SAG) ball mills are being increasingly used today for the coarse grinding of a range of ores, including gold, copper and iron. Larger mines are demanding mills with larger throughputs.
Jan 1, 1998
-
Field Evaluation Of A Diesel Particulate Filter System Using A Copper-Based Fuel Additive For Regeneration.By C. J. Myers, D. L. McKinnon, A. A. Dasys
In 1988, the National Institute of Occupational Health and Safety (NIOSH) published an information bulletin stating that whole diesel exhaust should be considered a probable carcinogen. Since then, re
Jan 1, 1993
-
Tunnels - The Owners' ProblemsBy T. J. Jr. Corwin
This paper will cover the problems confronting an owner when planning and estimating the cost of a proposed tunnel. Three factors are known: the length, size and the time allocated for the completion
Jan 1, 1974