Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald MineIn recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,
Jan 1, 1997
-
Roof Stability Mapping to Forecast Ground Conditions at an Illinois Basin Coal MineBy Phil R. Ames, Anil K. Ray, Murali M. Gadde, John A. Rusnak
"Many factors can be responsible for coal mine roof falls including, mining geometry, stress conditions and local geology. In the Illinois Basin coal mines, roof instability is commonly attributed to
Jan 1, 2010
-
Rigid Or Yielding Roof Bolts: At The Face Or Away From The Face (3eff2ffb-d0b3-4171-9439-10f9fdec54f7)By R. D. Lama
The concept of rigid or yielding bolts is discussed based upon support requirements for excavations of equivalent geomechanical behaviour. The concept of equivalent geomechanical behaviour is introduc
Jan 1, 1992
-
High-Precision Dynamic Subsidence Prediction Model Aided by Field Measured DataBy Yuanfei Chen, Jianfeng Zha
"China is the largest producer and consumer of coal in the world. The mining-induced surface subsidence has bad influences on the surface and structures above the surface. In order to minimize disaste
Jan 1, 2017
-
Application of New Void Detection Algorithm for Analysis of Feed Pressure and Rotation Pressure of Roof BoltersBy Eric Keller, Jamal Rostami, Wenpeng Liu
"Roof and rib instability is an important issue in underground mining. To optimize ground support design, enhance ground stability, and reduce the possibility of roof or rib failure with minimal use o
Jan 1, 2016
-
Ground Control Criteria for Coal Reserve Optimization in Multiple-Seam MinesBy Eric Westman
Ground control problems caused by multiple-seam interaction frequently sterilize coal reserves. Interaction mechanisms differ for overmining and undermining and are controlled by mining, spatial. and
Jan 1, 1997
-
Optimization Research on Flexible Shield Supports Mining Method in Steeply Coal SeamBy Bingjie Huo
"China is a major coal producer and consumer. It is necessary to mine the steeply pitching coal seams due to development of the coal industry to meet the increasing needs for coal. Flexible shield sup
Jan 1, 2010
-
Investigation Into Abnormal Surface Subsidence Above a Longwall Panel in the Southern Coalfield, AustraliaBy Winton J. Gale
The subsidence over a longwall panel at Tahmoor Mine in the Southern Coalfield of NSW, Australia, was found to be approximately twice the size it had been in previous measurements. An investigation in
Jan 1, 2011
-
Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings (55897abb-5ce0-4661-bf26-04d03fe5d67b)By Gabriel Esterhuizen
The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stability
Jan 1, 2004
-
Automated Temporary Roof Support Systems: An UpdateBy William Gray
It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine
Jan 1, 1998
-
Whole-Mine Subsidence over Tabular Deposits and Related SeismicityBy William G. Pariseau, Michael K. McCarter
"The challenge of estimating mine-wide subsidence and linkages to seismicity over tabular deposits is addressed by a special finite element technique (dual node - dual mesh). Subsidence and mine-induc
Jan 1, 2016
-
Innovative Ground Support System (23660f1b-763d-4a59-bd83-98b27cd5764f)By P. A. Gray
Artificial ground support has developed into a relined science over the past 20 years. From reactive support systems such as timber props and steel supports, to active systems such as roof bolts and c
Jan 1, 1992
-
A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel CoalBy Dion Pastars
Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the
Jan 1, 2007
-
Appropriate Mining System for Residual Coal Around End?slopes in Chinese Surface Coal MinesBy Takashi Sasaoka
A great deal of coal will be left under the final end-walls in Chinese surface coal mines because of lower slope angle in shoveltruck mining systems and larger mining depths. In traditional surface mi
Jan 1, 2013
-
Analysis of a Stability Problem in an Underground Coal Mine Due to Floor ConditionsBy M Nombe
Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was
Jan 1, 2002
-
The Interaction of Unique Geology and Retreat Room?and?Pillar Mining on Overburden Barrier Performance at the Grove No. 1 MineBy Anthony T. Iannacchione
This study, funded by the Appalachian Research Initiative for Environmental Science (ARIES), examines how mine layout, mining method, and geology interacted to allow water from the Grove No.1 mine poo
Jan 1, 2013
-
Analysis of Gateroad Stability at Two Longwall Mines Based on Field Monitoring Results and Numerical Model AnalysisBy David F. Gearhart, Mark Van Dyke, Heather Dougherty, Ted Klemetti, Gabriel S. Esterhuizen
"Coal mine longwall gateroads are subject to changing loading conditions induced by the advancing longwall face. The ground response and support requirements are closely related to the magnitude and o
Jan 1, 2018
-
Upwards Surface Movement above Deep Coal Mines after Closure and Flooding of Underground WorkingsBy Pierre-Yves Declercq, Andre Vervoort
"After the mass closures of entire coal mine districts in Europe at the end of the last century, a new phenomenon of surface movement was observed—an upward movement. Although most surface movement (i
Jan 1, 2017
-
User-Friendly Finite Element Design of Main Entries, Barrier Pillars, and Bleeder EntriesBy William G. Pariseau, Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson
"This contribution describes development and application of a user-friendly finite element program, UT3PC, to address three important problems in underground coal mine design: (1) safety of main entri
Jan 1, 2017
-
Longwall Roof Fall Prediction and Shield Support RecommendationsBy Ulrich Langosch
In the 1990s the German mining industry introduced a new generation of shield supports. The new design of support has a maximum load capacity of 10,000 kN, making these units as strong as the shields
Jan 1, 2003