Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Novel and Effective Method to Develop Tension in a Roof Bolt

    By Phillip E. Gramlich

    Through extensive practical experience and multiple studies, tensioned roof control systems have proven beneficial in difficult mining conditions. Due to increased mining of less desirable seams, ten

    Jan 1, 2014

  • SME-ICGCM
    Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal Mines

    By Murali Gadde

    Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli

    Jan 1, 2005

  • SME-ICGCM
    Mechanical Response of Split-Set Rock Bolts in Squeezing Ground

    Researchers from the National Institute for Occupational Safety and Health's Spokane Research Laboratory installed Split-Set rock bolts instrumented with strain gauges to document the mechanical

    Jan 1, 2005

  • SME-ICGCM
    Improved Pull out Strength of Fully Grouted Roof Bolts through Hole Geometry Modification

    By Luis Giraldo

    Rock bolt installation characteristics near roof falls have been identified as contributing to failure. One documented and regularly occurring failure mechanism is loss of anchorage between the grout

    Jan 1, 2005

  • SME-ICGCM
    Experimental and Numerical Methodology Assessment of Load Transfer Capacity of Bolts

    By Naj Aziz

    n Australia, the common method of laboratory testing of bolt for load transfer capacity determination is by short encapsulation push testing. Some concerns are raised about the validity of the test me

    Jan 1, 2005

  • SME-ICGCM
    Development of the Laboratory Short Encapsulation Pull Test for a Revised British Standard on Rock Reinforcement Components Used in Coal Mining

    By D. Bigby

    The current British Standard on rock reinforcement components used in coal mining (BS7861:1996) employs the axial double embedment tensile PET) test to determine the main system load transfer performa

    Jan 1, 2005

  • SME-ICGCM
    Modeling the Arc-effect of a Coal Mine Roof

    By André C. Zingano

    The domino effect in a violent pillar collapse occurs due to the redistribution of stress in the remaining pillars near the collapse, and this stress transfer occurs in the immediate and main roofs. T

    Jan 1, 2005

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden Strata

    By Shugang Li

    The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this

    Jan 1, 2005

  • SME-ICGCM
    Seam Structure - An Important Criterion for Coal Pillar Design

    By Kot F. v. Unrug

    In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m

    Jan 1, 2005

  • SME-ICGCM
    Half a Career Trying to Understand Why the Roof Along the Longwall Face Falls in from Time to Time?

    By Russell Frith

    Probably the most expensive but least well understood roof falls in underground coal mining, are those that occur ahead of the powered supports in the centre of longwall face. Even small roof cavities

    Jan 1, 2005

  • SME-ICGCM
    Geotechnical Strata Characterisation Using Geophysical Borehole Logs

    By Terry Medhurst

    Geophysical logging is routinely undertaken as part of most Australian coal mining exploration programs. Typically, the main application is the determination of coal seam depth and the qualitative est

    Jan 1, 2005

  • SME-ICGCM
    Evaluation of the Impact of Standing Support on Ground Behavior in Longwall Tailgates (8a8cef19-7d7c-417d-83e0-31858c1152c5)

    By Thomas Barczak

    Longwall mines typically use some form of standing support for secondary roof support in longwall tailgate entries. Although there have been several new support products developed for this application

    Jan 1, 2005

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator Plan

    By S. Mehrdad Heidari

    The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a

    Jan 1, 2005

  • SME-ICGCM
    Analysis of Highwall Mining Stability - The Effect of Multiple Seams and Prior Auger Mining on Design

    By D. Newman

    The objective of this is paper is to review the current state of knowledge and practice in highwall mining (HWM). HWM has become a standard method in surface mining, commonly used alone or in conjunct

    Jan 1, 2005

  • SME-ICGCM
    Stability Mapping System

    By Quanxi Wang

    This paper presents a new stability mapping system which tightly integrates structural and geologic mapping with geo- mechanical stress analysis for use in support design and mine plan- ning. The stru

    Jan 1, 2005

  • SME-ICGCM
    Depillaring and Roof Bolting Practices at Quinsam Coal Mine

    By Kresho Galovich

    Quinsam Coal Mine located in Vancouver Island, BC, Canada is mining the No. 1 coal seam at the 2 North/3 North mine and the No. 3 coal seam at 4 South Mine. This paper describes its geology and struct

    Jan 1, 2005

  • SME-ICGCM
    Basics on the Dimensioning and the Extraction of Shaft Safety Zones

    By Anton Sroka

    The dimensioning of shaft safety zones is a substantial task of mining subsidence engineering. On the one hand, the coal reserves in shaft proximity are to be mined as complete as possible, because th

    Jan 1, 2005

  • SME-ICGCM
    Highwall Mining in a Multiple-seam, Western United States Setting Design and Performance

    By Tom Vandergritft

    With advances in system design driving higher productivity, safety, and coal recovery, highwall mining is becoming an attractive option for extending reserve life at surface mines. Typically, highwall

    Jan 1, 2005