Search Documents

  • SME-ICGCM
    Clay Veins: Their Physical Characteristics. Prediction, and Support

    By Frank E. Chase

    Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos

    Jan 1, 1984

  • AUSIMM
    Determination of Relative Economic Values of Mill Returns

    IN concentrating mills, where several millerals are recovered for realisation in more than one product, various systems are used to express the relative economic value of the work done, and, in the ho

    Jan 1, 1931

  • SAIMM
    Some Considerations On Future Developments In Ferro-Alloy Furnaces

    By I. J. Barker

    Keywords: Submerged-arc furnace, plasma furnace, d.c. furnace, scale up, Søderberg electrodes, smart grid, demand side management, load shedding This paper argues that the scale up of furnaces and

    Jan 1, 2011

  • AUSIMM
    The Code of Practice for Risk Management of Tunnel Works - Future Tunnelling Insurance from the InsurerÆs Point of View

    The objectives of this paper are to introduce the International Code of Practice for Risk Management of Tunnel Works and to illustrate to the participants of the 13th Australian Tunnelling Conference

    Jan 1, 2008

  • AUSIMM
    Coarse Liberation and Recovery of Free Gold and Gold Sulfide Carriers for Energy Reduction in Process Plants

    By M Davies, G Theletsane, A H. Gray

    Recovery of gold from gold ores has been driven by the available technology and its configuration in the process plant flow sheet.Conventional practice in test work programs has the ore being ground f

    Sep 1, 2014

  • AUSIMM
    Timbering and its Importance in Making Estimates of Cost

    The importance of timbering, not only from a financial point of view but from an actual mining point of view, is so often overlooked or slightly glossed over by the average expert and investor, that I

    Jan 1, 1901

  • AUSIMM
    Some Operational Aspects of Heap Leaching at Rum Jungle

    An oxide ore heap (80,000 ton assaying 2 per cent copper) and a sulphide ore heap (300,000 ton assaying 1·7 per cent copper) are being leached in series in a closed circuit system. The ore is fri

    Jan 1, 1968

  • DFI
    Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus

    By Robert E. Fosse

    Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr

    Jan 1, 2002

  • DFI
    Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting

    By David Preece

    The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem

    Jan 1, 2011

  • SAIMM
    The Adsorption And Elution Of Platinum Group Metals (PT, PD, And AU) From Cyanide Leach Solutions Using Activated Carbon

    By C. A. Snyders

    This paper investigates the recovery of platinum group metals (PGMs) from a dilute cyanide leach solution containing base metals, in a manner similar to that used for gold extraction in a typical CIP

    Jan 1, 2012

  • SME
    Materials Flows Generated by Pyromet Copper Smelting

    By Thomas G. Goonan

    Copper production through smelting generates large volumes of material flows. As copper contained in ore becomes copper contained in concentrate to be fed into the smelting process, it leaves behind

    Jan 1, 2005

  • SAIMM
    Pyrite roasting, an alternative to sulphur burning - Synopsis

    The roasting of sulphide ores and concentrates is often the first step in the production of metals or chemicals. In many processes, the production of sulphuric acid is viewed as a by-product, whereas

    Jan 1, 2009

  • SME
    Role of gas pressure in underground coal mine bursts and bumps

    By W. G. Pariseau

    Face and pillar bursts, bumps and bounces are violent failures that occur in underground coal mines in response to a complicated interplay of face and pillar geometry, seam depth, coal strength and mo

    Aug 1, 2013

  • AIME
    Central Ohio Coal Company's Mine Expansion Program

    By Paul D. Martinka

    Coal is the principal energy source for the American Electric Power System (AEP System), which generates and delivers more electric energy to its customers within a seven-state area than any other inv

    Jan 1, 1969

  • SAIMM
    Investigation of the mechanism for fireside corrosion in coal-fired boilers in South Africa

    By J. W. van der Merwe, K. G. Moloko

    Furnace wall tubes from 600 MW subcritical boilers at three coal-fired power stations were sampled and the fireside deposits examined to determine the mechanism of fireside corrosion. This involved an

    Jun 1, 2021

  • DFI
    Foundations In The Urban Environment The Need For Unique Installation Methods - Introduction

    By James J. Cahill

    Contractor's working in an urban environment face a multitude of working conditions. There is no typical "Downtown" job site. From afar we just see the skyline, or up close a specific building. T

    Jan 1, 1991

  • CIM
    Planning and Scheduling of Maintenance Work at the Milliken Mine

    By K B. Bowley

    This paper covers the application of a systematic maintenance plan by the Plant Engineering Department of Rio Algom Mines Limited, Milliken Division. The plan established the function of work study, d

    Jan 1, 1963

  • SME
    Durability Design and Construction for Underground Facilities - NAT2024

    By Wern-Ping Nick Chen

    Durability risks for underground facilities can be underestimated during design phase as compared to well-known geological risks. However, unclear durability requirements can result in construction sc

    Jun 23, 2024

  • AUSIMM
    Pneumatic Stowing of Mill Residues in Underground Stopes, Broken Hill South Limited

    Two of the problems long associated with the complete extraction of level pillars in the wide ore bodies of Broken Hill have been: (1) The high cost of maintaining level gangways through areas of slow

    Jan 1, 1941

  • NIOSH
    RI 9448 - Seismicity and Stress Changes Subsequent to Destress Blasting at the Galena Mine and Implications for Stress Control Strategies

    By P. L. Swanson, F. M. Boler

    The U.S. Bureau of Mimes conducts research at the Galena Mine, Wallace, ID, with the aim of mitigating the effects of rock bursting. Destress blasting is commonly used as a stress control technique at

    Jan 1, 1993