Evaluation Of Polyurethane Injection For Beltway Roof Stabilization In A West Virginia Coal MineBy Gregory M. Molinda
Extremely difficult ground conditions were encountered in the main belt entry in a room and pillar mine in West Virginia. Several generations of supplemental support, including cable bolts, cribbing,
-
Application of Mammoth Vibro-Tamper (MVT) for the Shallow Compaction at Airport Runway Expansion Project on Florida Limestone GroundBy Kazunori Matsushita, Frank Vespi, Emi Walder, Mitsuo Nozu
During the runway expansion project at the Fort Lauderdale-Hollywood International Airport in Florida (FLL project), therewere complicated geotechnical issues with a number of cavities in the limeston
Jan 1, 2018
-
Guidelines of Overburden CastingSince the ecrly 1970's several factcrs have changed. In the East the larger tracts of coal mined with large eauipment are being dePleted, The cost of moving the larger equipment from small tract to s
Jan 1, 1989
-
Developing A New Process Design For The Southwestern Oregon Industrial Mineral Bearing Placer System Via Practical Study Of The Unique Deposition, Mineralogy, And Dry Tailing Requirements - Introduction - Preprint 09-038By J. Drew
Oregon Resources Corporation (ORC), an industrial minerals mining company, is currently engaged in the development of a new process design that will allow the unique paleo-beach placer deposits of sou
Jan 1, 2009
-
A Philosophical View On The Testing Of Rock Support For Rockburst Conditions ? SynopsisPhysical testing of rock support for rockbursting conditions has been carried out for over 40 years. A review of this testing shows that it has been mostly component?based, rather than actually testin
Jan 1, 2012
-
Mineral processing, research and development projects in Nova Scotia conducted through the Canada/Nova Scotia Mineral Development AgreementBy D. M. Doyle, P. J. Hannon
"The Canada/Nova Scotia Mineral Development Agreement (M.D.A.) is a subsidiary of a five-year Economic and Regional Development Agreement, signed on June 11, 1984. The objectives of the M.D.A. are to
Jan 1, 1987
-
Mining û Pied Piper for Pastoralism?This paper highlights the agricultural sector's primary concerns with mining in New Zealand: the information gap, land rehabilitation and compensation. It suggests how these issues can be resolve
Jan 1, 1981
-
Discussions - Discussion of ISD Papers Published in Transactions Volume 185, 1949 - Discussion of ISD Papers Published in Transactions Volume 188, 1950G. A. Moore—The tin-fusion method has been a very favorable possibility for many years. The authors apparently have settled the question that delayed the method for a long time by showing that no hydr
Jan 1, 1951
-
Practical Tunnel Lining Design Methodology and Guidelines—A Series of Tunnel Design PapersBy Bradford F. Townsend, Colin R. Speers
INTRODUCTION This is the first in a series of papers addressing practical tunnel lining design. The format for this and future papers is to present a particular topic and support the presentation o
Jan 1, 2005
-
Seismic Tomography For Longwall Stress AnalysisBy E. C. Westman
Anomalous geologic or stress-induced conditions can create a hazardous working environment for underground miners. Seismic attenuation tomography provides a valuable tool for understanding static and
Jan 1, 1996
-
The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground VoidsSafe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such
May 1, 2007
-
Probabilistic risk analysis of slope stabilityBy A. P. Whittlestone, J. D. Johnson, R. J. Pine, M. E. Rogers
standpoint. The effect on efficiency of collisions
Apr 1, 1995
-
The Schaft Creek Porphyry Cu-Mo-(Au) Deposit, Northwestern British ColumbiaBy J. E. Scott, L. M. Heaman, R. A. Creaser, G. S. Salazar
"Schaft Creek is a calc-alkaline porphyry Cu-Mo-(Au) deposit located in northwestern British Columbia. The deposit formed in a volcanic arc setting, likely on a back-arc rifted continental fragment. I
Jan 1, 2008
-
Including In-Process Inventories in the Metal Accounting of Flotation Plants"Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br
Jan 1, 2014
-
Copper Leaching From Low Grade Copper Ores Using Alternative Leaching SystemsBy Jaeheon Lee, Junmo Ahn, Jiajia Wu
In this project, low grade copper ore samples were obtained from two mining sites in the US, and they were chalcopyrite-rich (sample A) and conichalcite-rich (sample B) ore. Copper grades were 0.6% an
Jan 1, 2019
-
Reservoir Engineering-General - Approximation of Gas-Drive Recovery and Front Movement in the Abqaig FieldBy L. T. Stanley
A method is described whereby the behavior of the front is approximated when gas is injected into a thick reservoir having reasonably homogeneous properties. The method is applied to the Abqaiq field
-
Measement of blast-induced rock movement on surface mines by application of magnetic geophysicsBy G. W. Harris, J. J. K. Daemen
Slightly shorter, modified version also published in CIM Bull., vol.94, no.1047, Feb. 2001, p.52-55. To minimise ore dilution induced by blast movement in surface mines it is necessary to quantify suc
Jun 21, 1905
-
Chemistry of paste backfillBy Jacques Ouellet, Ferri Hassani
"Within the mining industry paste backfill technology has evolved over the last two decades. This technology aims at producing safe and cost effective backfill of high strength. When used as cemented
Jan 1, 2002
-
RI 4336 Zinc Smelting In The Horizontal Retort Fired With Natural Gas 4. Burner DesignBy G. L. Oldright
As a rule, the usual zinc retort smelter fired with natural gas made its own burners, of which there might be 300 per block, out of standard pipe fit-tings. The gas was discharged through a feeder pip
Jan 1, 1948
-
Common pitfalls in sampling iron oreBy R J. Holmes
The procedures and equipment used for sampling iron ore process streams have generally improved in recent years. However, there are a number of areas where significant issues still commonly occur, inc