Search Documents

  • AUSIMM
    Effect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite Flotation

    Effect of Matching Relationship Between Bubble Size and Particle Size on Kaolinite Flotation

    Sep 13, 2010

  • AIME
    Mining - Sinking Two Shafts at the New Beatrix Mine by Drilling

    By J. M. Weehuizen

    Complete details are given of the drilling method by which two shafts were sunk at the new Beatm'x mine of Staatsmijnen in the Netherlands. The nature of the rock strata in the Dutch mining distr

    Jan 1, 1961

  • CIM
    Process Improvements at Bell Creek Mill

    By F. Flynn, P. Downey, G. Ritson

    "Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git

    Jan 1, 1997

  • CIM
    Asbestos Floats

    By M. S. Badollet

    "IntroductionASBESTOS FLOATS may be defined briefly as blends of air-borne particles of fibrous asbestos and dusts produced during the milling stages and collected by Cottrell precipitators, dust shed

    Jan 1, 1952

  • SME
    Recycling Process Water in Sulfide flotation, Part B: Effect of H2O2 and Process Water Components on Sphalerite flotation From Complex Sulfide

    By F. Ikumapayi

    Hydrogen peroxide production was measured during the grinding of a complex sulfide ore, and its oxidizing effect on solid surfaces was investigated using Fourier transform infrared spectroscopy (FTIR)

  • SME
    Mine Stope Coverage Cuts Acid Mine Drainage

    By Joseph J. Feiler

    Historical mining operations in Colorado and other western states have resulted in thousands of remnant mine openings. Many are sources of metals loading and acid water generation in surface and grou

    Jan 1, 2006

  • SME
    Optimal Grade Control Using Geostatistics And Economics: Methodology And Examples (0cbcdec1-207d-4fc8-8d49-cd716d6fcdc7)

    An important problem in mine operations is the classification of material as waste, low-grade stockpile, and ore. This classification must often be made with blasthole data that are widely spaced and

    Jan 1, 1999

  • AIME
    Petroleum Developments Colombia in 1941 and in 1945

    By O. C. Wheeler

    In order that the series of reports on oil and gas in Colombia may be complete, the report for the year 1941, which was not available for Volume 160 of the TRANSACTIONS, is given here. The report for

    Jan 1, 1946

  • SME
    Fire Design for the Concrete Lining of the Ohio River Bridges East End Crossing Tunnel

    "A fire design innovation of the concrete lining of the Ohio River Bridges East End Crossing Tunnel has been developed. As a result from a fire suppression and tunnel ventilation system, the project d

    Jan 1, 2016

  • SME
    Mining Foundation of the Southwest Selects 1999 honorees

    The Mining Foundation of the Southwest (MFSW)promotes public understanding and education related to the mining industry. Towards this goal, the Foundation has funded several projects from donations a

    Jan 1, 1999

  • SME
    Helmet-CAM: Strategically minimizing exposures to respirable dust through video exposure monitoring

    By J. R. Patts, A. B. Cecala, E. J. Haas

    Exposure to respirable crystalline silica (RCS) remains a serious health hazard to the U.S. mining workforce who are potentially exposed to RCS [1,2] as various ore bodies are drilled, blasted, hauled

  • DFI
    Wrigley Field – The 1060 Project

    By Darren S. Diehm

    "Construction for the restoration and expansion of 102-year-old Wrigley Field in Chicago, Illinois began at the conclusion of the 2014 baseball season. This six year project involves structural upgrad

    Jan 1, 1900

  • SAIMM
    Optimizing Value on a Copper Mine by Adopting a Geometallurgical Solution

    By A. S. Macfarlane

    This paper describes how knowledge of the orebody morphology and ore morphology can be used to optimize the planning, mining, and metallurgical output from an open pit copper mining operation, such as

    Jan 1, 2014

  • SAIMM
    Changing Minds??A White Flag? ? Synopsis

    By J. L. Viljoen

    t has long been the drive of the industry and all operations to create an environment that is free of injury and illness. We have come a long way; the leaders, executives, managers, supervisors and wo

    Jan 1, 2011

  • SME
    Semi-Autogenous Grinding (SAG) Mill Liner Design And Development

    By D. Royston

    SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic

    Jan 1, 2007

  • CIM
    The Optical Properties of Mixed Au and Pt Nanoparticle Colloids

    By Daven N. Compton

    The optical properties of Au nanoparticles have been known for some time, with both Au colloids and Au nanoparticles embedded in glasses having been extensively studied. In this study, Pt nanoparticle

    Oct 1, 2003

  • IIMP
    Geología estructural del neógeno en la cordillera negra, implicaciones en la estabilidad de taludes del yacimiento aurifero epitermal de alta sulfuración: pierina

    By Esteban D. Manrique Z.

    El presente texto describe la geología estructural de la mina Pierina, Ancash, donde se resolvió los problemas geotécnicos de dicho yacimiento, producto de la geodinámica externa. Asimismo, señala los

    Sep 12, 2011

  • AUSIMM
    Design of Reinforced Concrete Chimney at Yallourn Briquetting Works

    THE Yallourn chimney has aroused interest, as it is, for the time being, the tallest structural erection in Australia. Its height was not decided on, however, with the object of breaking records, but

    Jan 1, 1924

  • CIM
    The Separation .of Acid-Consuming Minerals from Pitchblende by Flotation

    By G. B. Hudson

    Previous papers (1, 2) pertaining to the treatment of uranium-bearing ores were concerned with the flotation of the radioactive minerals. In this investigation, the application of flotation to the rem

    Jan 1, 1963

  • AUSIMM
    Production Capacity Optimisation in the Presence of Grade Uncertainty

    Grade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation

    Dec 6, 2010