Search Documents

  • NIOSH
    RI 3112 Flotation Reagents, 1929

    By R. L. Kidd, T. H. Miller

    "INTRODUCTION This paper is the seventh of a series of yearly reviews started in 1921 and pre¬sents information gathered in a cooperative investigation undertaken by the United States Bureau of Mines

    Aug 1, 1931

  • RMCMI
  • SME
    Study on Mine Tailings Classification Effected by Co‑disposal of Drilling Wastes with Geochemical Cations

    By J. Stawovy, A. Fourie, J. D. Quaranta

    Coal refuse impoundments are disposal facilities specifically designed for the coal mining industry. Re-purposing refuse impoundments for co-disposal with natural gas flowback water and waste rock ove

    Jul 5, 2022

  • ISEE
    Modern Blasting Practices in Brazil

    By Benedicto Hadad Cintra

    In an inflationary environment the need for reduced cost is a daily concern of all industries. The Du Pont do Brasil "Expanded Pattern" method has proven to be an extremely effective means of reducing

    Jan 1, 1985

  • AUSIMM
    Application of X-ray Diffraction to Iron Ores - Potential Implications for Grade Control and Downstream Processing

    The steps for the beneficiation of iron ores differ from ore to ore, depending on the mineralogical phases of the particular iron ore and the nature of the association of the gangue minerals with iron

    Aug 12, 2013

  • SME
    Influence of Rock Mass Properties on Performance of Hard Rock TBMs

    By Jamal Rostami, Richard Kastner, Ahmad Ramezanzadeh

    Improving the accuracy of the performance prediction models for hard rock Tunnel Boring Machines (TBMs) is important in estimation of the schedule and cost of tunnelling in related projects. The effec

    Jan 1, 2005

  • NIOSH
    RI 7546 Field Evaluation Of Hydraulic Backfill Compaction At The Lucky Friday Mine, Mullan, Idaho

    By D. R. Corson

    The Bureau of Mines instrumented two similarly backfilled stopes--one filled in the normal manner and the other with the fill densified using vibratory compactors--to evaluate the effect of fill compa

    Jan 1, 1971

  • AUSIMM
    The Bullendale Reef Gold Deposit

    By Associates

    The headwaters of Skippers Creek and the Shotover River are reputed to be among the richest alluvial gold catchments in the world. This alluvial gold has no doubt been derived from reef systems simila

    Jan 1, 1992

  • AUSIMM
    Cadmium in Tasmanian Sphalerites

    Sphalerites from Devonian cassiterite-sulphide deposits and Pb-Zn-Ag fissure veins have similar ranges of Cd contents, but the average Cd and Fe contents could indicate a small initial difference in a

    Jan 1, 1968

  • AUSIMM
    Advances in the <i>MillMapper</i> Technology for Grinding Mill Liner Thickness Gauging

    By D Lichti

    This paper presents recent advancements in the MillMapper software technology, developed and used for thickness gauging of liners of cylindrical grinding mills used for mineral comminution. MillMapper

    Jan 1, 2007

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • NIOSH
    OFR-21-86 Development Of Noise Control Technology For Jumbo Drills

    By Piyush K. Dutta

    This report describes the design, development, manufacture and incorporation of noise control features on a jumbo drill and the results of successful tests of this drill in surface and underground min

    Jan 1, 1985

  • SME-ICGCM
    Load Determination For Long Cable Bolt Support Using Computer Aided Bolt Load Estimation (CABLE) Program

    In this paper a numerical formulation is presented for determination of the axial load along a cable bolt for a prescribed distribution of rock mass displacement. Results using the program CABLE indic

    Jan 1, 1996

  • CIM
    Porcupine Joint Venture A new birth ? a new venture ? a plan for success!!!

    Located in Timmins, Ontario the Porcupine Joint Venture, a pooling of assets between two existing operations (the Dome Operation of Placer Dome (CLA) and the Hoyle Pond Operation of Kinross Gold Corpo

    May 1, 2003

  • IOM3
    Layered mine waste co-mingling for mitigation of acid rock drainage

    By J Hadijigeorgiou, R. W. Lawrence, R Pouling

    The layered co-mingling method involves the disposal of waste rock with the addition, at predefined construction stages, of layers of dewatered mine tailings. The resulting waste structure displays bu

    Apr 1, 1996

  • AUSIMM
    North Mine Practice in Underground Points and Crossings

    IN a mine with any considerable output the economical handling and transport of ore underground is a matter of prime importance, and in the design or lay-out of a trucking system the question of what

    Jan 1, 1915

  • SME
    Old Mines ? New Regulations: The re-opening of the Gordonsville, Elmwood, and Cumberland Mines under new DPM regulations

    By A. Adu-Acheampong

    The Mid-Tennessee Zinc (MTZ) mines, comprised of the Gordonsville, Elmwood, and Cumberland sites, last operated 4 years ago and are undergoing rehabilitation to begin production in 2008. The mines uti

    Jan 1, 2009

  • NIOSH
    Bulletin 219 Explosives Their Materials, Constitution, and Analysis

    By WM. H. RINKENBACH, C. A. Taylor

    No complete work on explosives, their constitution and analysis, has hitherto been published. Several books that contain chapte.r;s on analysis do not cover the matter thoroughly. Methods tha;t, manu~

    Jan 1, 1923

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019