Search Documents

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • SAIMM
    Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and Construction

    By F. B. Samani, B. Stabel

    The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the

    Jan 1, 2003

  • SME
    Field Comparison of Roof Bolter Dry and Wet Collection Systems for Dust Control

    By D. Blackwell, W. R. Reed, G. Ross, S. Peters, M. Shahan

    Dust collectors for roof bolting machines generally use a dry box to collect the roof bolting material. Recently, an underground mining operation converted a dry box dust collector to a wet box dust c

    Jan 1, 2019

  • SME
    Practical Experience in Large-Scale Development of Zijinshan Low-Grade Gold-Copper Mine "Mining, Metallurgy & Exploration (2020)"

    By DING TANG, JINGHE CHEN, Shuiping Zhong, CHEN KUANG

    The Zijinshan gold-copper mine, in spite of the low-grade nature of the ore, has become one of the largest production-scale and most profitable non-ferrous metal mines in China. The successful applica

    Jun 3, 2020

  • NIOSH
    RI 4427 Investigation Of Certain High-Alumina Clays Of Central Pennsylvania

    By Robert S. Sanford

    The demand for aluminum for military use during World War II called for an expansion of aluminum production in the United States A large part of the bauxite (the normal ore of aluminum) consumed in th

    Jan 1, 1949

  • ISEE
    Strain-Based Vibration Criteria for Blasting in New York City

    By Catherine T. Aimone-Martin, Meyers Joseph A.

    A new strain-based criteria is being adopted for rock blasting in New York City (NYC). This criteria is based on several years of research involving vibration measurements of tall structures during bl

    Jan 1, 2019

  • SME
    Modification and enhanced testing of data mining-based algorithm to detect subtle errors in temperature sensors in a gold-stripping circuit

    By Rambabu Pothina, MELO EDUARDO PIMENTA DE, Rajive Ganguli

     The mining industry is home to a mass of sensor-generated data that are critical to real-time and long-term optimization. This heavy reliance on sensor data has resulted in an undesirable development

  • DFI
    Best Practices for Soil Mixing Near Sensitive Structures

    By Joseph A. Mann

    "Soil mixing is a proven solution for the construction of ground improvement adjacent to sensitive structures due to the use of computer controlled and monitored equipment. The precision to which geom

    Jan 1, 2015

  • SME
    South Interceptor Tunnel Construction Using a Lovat EPBM

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja

    Jan 1, 2003

  • AUSIMM
    Design and Engineering of Flotation Circuits (in Australia)

    By D Mcleod, S Brindley, S Green

    The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit

    Jan 1, 2005

  • SME
    A Case Study of the Stability of a Non-Typical Bleeder Entry System at a U.S. Longwall Mine

    By Ihsan Berk Tulu, Mark Van Dyke, Ted Klemetti, Deniz Tuncay

    "Longwall abutment loads are influenced by several factors, including depth of cover, pillar sizes, panel dimensions, geological setting, mining height, proximity to gob, intersection type, and size o

    Jan 1, 2019

  • SME
    Groundwater Control For Two-Pass Soft Ground Tunneling

    By Cary Hirner, David Stacey, William A. Rochford

    Design considerations and construction techniques were implemented to address groundwater infiltration from a confined aquifer during the excavation and lining of the Cady Marsh Flood Relief Tunnel. T

    Jan 1, 2007

  • AUSIMM
    Oceanographic Preparations for Offshore Drilling

    There is a lack of information concerning the movements of water on the continental shelf, particularly with regard to data obtained regularly over significant periods of time. The Horace Lamb Centre

    Jan 1, 1971

  • AIME
  • SME
    Permitting New Tunnels in Southern Ontario, Canada—Panacea, Pragmatism, and Professionalism

    By Adrian Coombs, Paul Magowan, Derek Zoldy

    Continued development and intensification are fuelling the urgent need for new trunk infrastructure within The Regional Municipality of York and throughout the Greater Toronto Area. Permitting of thes

    Jan 1, 2007

  • CIM
    Commons and Senate Committees Comment on Tax Reform

    By R. D. Brown

    The Federal Government's White Paper on Tax Reform received further major criticism in the reports of the Committees of the House of Commons and the Senate, which recently completed a lengthy review i

    Jan 1, 1971

  • SME
    Assessing Small Underground Coal Mines For High Safety-Related Risk

    By H. Kinilakodi

    In 2008, the authors developed a methodology for assessing underground coal mines for high risk for major-hazard events. It focused on major hazard-related violations of safety standards associated wi

    Jan 1, 2011

  • SAIMM
    Zimbabwe’s coloured gemstone endowments – A regional geological overview

    By B. P. von der Heyden, T. Blenkinsop, A. Mamuse

    Zimbabwe hosts a varied array of coloured gemstones. With the exception of emerald deposits and several world-class pegmatites, few of the gemstone occurrences have received detailed attention from th

    Feb 12, 2024

  • NIOSH
    RI 2637 Some Features of Ventilating Fans At 164 Coal and Metal Mines

    By D. Harrington, M. W. Von Bernewitz

    "Introduction In studying the mine disaster files of the Bureau of Mires for preparation of a bulletin on coal-mine explosions, a table was compiled covering various features of fan installations and

    Sep 1, 1924

  • SME
    Reclamation Of Pb/Zn Smelter Wastes In Upper Silesia Poland

    Water and wind erosion of toxic zinc and lead smelter waste is one of the most urgent environmental problems to be solved in the Silesia region of Poland. Over 87 x 106 Mg of various mining wastes wer

    Jan 1, 1999