Search Documents

  • NIOSH
    OFR-50(1)-75 Evaluation Of Mill Tailings Disposal Practices And Potential Dam Stability Problems In Southwestern United States, General Report, Volume I

    This report presents the results of a study of mill tailings disposal practices and potential tailings dam stability problems. Recognizing the long period of time that would be required to develop the

    Jan 1, 1974

  • SME
    Bias And Error In Mine Project Capital Cost Estimation

    By J. Bertisen, G. Davis

    Previous analyses of small samples of mining projects have found that feasibility studies tend to well under-estimate the actual capital costs of the project. Our review of 63 mining and smelting pro

    Jan 1, 2007

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • NIOSH
    OFR-56-82 Evaluation Of Roof Trusses, Phase I

    By Clark P. Mangelsdorf

    The report consists of two parts. In Part I is a state-of the-act study of roof truss technology as of January 1979. Included are a history of the truss concept, a review of analysis techniques, a rec

    Jan 1, 1979

  • SAIMM
    The Application Of In-Mine Electrical Resistance Tomography (ERT) For Mapping Potholes And Other Disruptive Features Ahead Of Mining

    By M. van Schoor

    The bulk of the world?s platinum production originates from the Merensky and UG2 reefs within the Bushveld Complex, South Africa. Both the Merensky and UG2 reefs are disrupted by faults, dykes, pothol

    Jan 1, 2005

  • SME-ICGCM
    Computer Modeling Of Rock Mass Geomechanic State In Longwall Design

    By V. D. Jalevsky

    A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s

    Jan 1, 1996

  • NIOSH
    Nature Of The Carbides Of Iron

    By L. J. E. Hofer

    THIS BULLETIN analyzes and summarizes research at the Bureau of Mines dealing with the preparation, properties, and reactions of iron carbides in the period 1948-60, part of which was sponsored by Wri

    Jan 1, 1966

  • NIOSH
    OFR-124(2)-78 Evaluation Of Diesel Equipment Deployment In Underground Coal Mines - Volume II Diesel Bibliography

    By R. V. Ramani

    The industrial hygiene and safety aspects with internal combustion engines in mining systems is truly interdisciplinary and encompasses many fields such as mine ventilation, exhaust gas and particulat

    Jan 1, 1977

  • NIOSH
    RI 3232 Temperature-Viscosity Measurement in the Systems CaO-Sio2 and CaO-SiO2-CaF2 (57b03329-e9f4-4dd9-b275-560a67d7dbf7)

    By M. B. Boyer, C. H. Herty, F. A. Hartgen, G. L. Frear

    "DEFINITION OF VISCOSITYViscosity has been defined as the resistance experienced by one portion of a liquid moving over another portion, such as one molecular plane moving over an adjacent plane. A me

    Jun 1, 1934

  • AUSIMM
    Evaluation of Remote Sensing Technology as a Tool for Mining Applications

    By D Laurence, L Ge

    This paper demonstrates use of remotely sensed imagery in promoting sustainable mining. Remote sensing technology can be used during all phases of a mining project û from evaluating the resource, to m

    Jan 1, 2009

  • NIOSH
    RI 7385 Evaluation Of Electrowon Tungsten Sheet

    By G. H. Keith

    Electrowon tungsten powders were investigated with respect to consolidation, fabrication, and mechanical properties. Sheet, 0.03 inch thick, was produced and its tensile strength measured between 250°

    Jan 1, 1970

  • AIME
    Rock Mechanics - An Investigation of Microseismic Activity in Rock Under Tension

    By M. M. Singh, J. W. Brown

    Three rocks of highly varied physical properties are selected for the first reported experimental study concerning microseismic activity of rock under tension to determine the effects of static fatigu

    Jan 1, 1967

  • SME
    The History Of Aggregate Development In The Denver, Co Area - Preprint 09-044

    By W. H. Langer

    At the start of the 20th century Denver?s population was 203,795. Most streets were unpaved. Buildings were constructed of wood frame or masonry. Transport was by horse-drawn-wagon or rail. Statewide,

    Jan 1, 2009

  • SME
    Using An Integrated Model For Maintenance Strategy Selection Of Load-Haul-Dump Equipment

    By A. Yazadni-Chamzini

    Maintenance strategy selection plays a significant role in mining design. The nature of maintenance strategy selection is a complex multi-criteria decision making (MCDM) problem including both tangibl

    Jan 1, 2012

  • ISEE
    Investigations of Shock Tunnel Dynamics and Energy Realization (a197a97d-a574-4dd6-b892-bc2dba4e791b)

    By Joshua Hoffman, Braden Lusk, Kyle Perry

    This study explores how different geometries affect the shock tunnel’s performance and is broken down into three phases. Phase 1: Open arena testing in which theoretical energies produced by the deton

    Jan 1, 2009

  • IIMP
    Aplicación de nuevas tecnologías para el mantenimiento de motores diesel de combustión interna

    By Esteban Bravo

    El presente señala la utilidad del último software y equipos desarrollados como herramientas que permiten analizar, monitorear y reparar los problemas que se presenten en el funcionamiento de motores

    Aug 25, 2002

  • AIME
    Institute of Metals Division - Effect of Manganese on the High-Temperature Oxidation of Fe-26Cr Alloy

    By M. Cohen, P. E. Beaubien, D. Caplan

    Addition of 1 pct Mn to Fe-26 CY ca/(ses a12 increase in scaling rate at 870° and 1090°C. Whereas only the rhombohedral oxide, formrs on tire manganese-free alloy, with manganese present major amounts

    Jan 1, 1965

  • ABM
    Recuperação De Calor Na Sinterização: Uma Alternativa Viável Para Geração De Energia Térmica E Aumento Da Eficiência Global Da Planta

    By Joaquim Luiz Monteiro Barros

    Este trabalho tem como objetivo principal apresentar de forma didática e com um exemplo prático a viabilidade da aplicação da tecnologia de recuperação de calor no sinter cooler, com a finalidade de g

    Aug 17, 2017

  • DFI
    Time-Dependent Bond Regain In Driven Piles In Permafrost ? Synopsis

    By B. Ladanyi

    The design philosophies for piles in unfrozen and frozen soils are compared, and their similarities and differences are underlined. It is shown that in frozen soils, the long term behavior of a pile i

    Jan 1, 2010

  • SME
    Real-Time Monitoring Of Cable Shovel Stress For Improved Machine Health

    By S. Frimpong

    Cable shovel requires continuous monitoring through excavation to achieve reliability, longevity and economic usage. The operating environment and the stress and deformation fields on the front-end as

    Jan 1, 2006