Search Documents

  • AIME
    Preliminary Program, A.I.M.E. Annual Meeting

    By AIME AIME

    THE American Institute of Mining and Metallurgical Engineers will hold its annual meeting in New York City, Feb. 9-12. The technical sessions, excepting the Sunday afternoon and evening sessions of th

    Jan 1, 1942

  • NIOSH
    FLAC Simulation Of Split-Pipe Tests On An Instrumented Cable Bolt (a0c51804-b6b1-4b6f-b8ba-d2b4c1ab8f67)

    By Marc Ruest, Lewis Martin

    A new instrumented cable bolt has been developed by the National Institute for Occupational Safety and Health at the Spokane Research Laboratory in Spokane, WA. Although various instruments are avail

  • SAIMM
    Analytical Hierarchy Process For Selection Of Roadheaders

    By O. Acaroglu

    Selection of the most suitable roadheaders (boom type tunnelling machines) for the galleries/tunnels to be excavated in certain rock and under known project conditions is important for avoiding proble

    Jan 1, 2006

  • SAIMM
    Optimising The Effective Use Of Energy In The Ferroalloy Industry Through Innovative Technology

    By A. M. Hearn, J. G. Roos

    Energy consumption, being a large proportion of the input of the ferroalloy production process, can be measured in terms of the efficiency with which the energy is utilized and the effectiveness with

    Jan 1, 2004

  • IOM3
    Report of speeches at the annual dinner of the Institution of Mining and Metallurgy

    By M. G. Fleming, F. Warner, R. W. Boswell, M. J. Cahalan

    The annual dinner of the Institution was held at the Savoy Hotel, London W.C.2, on 22 April, 1971. The President, Mr. M. J. Cahalan, was in the Chair; members and guests numbered 320. The toasts of Th

    Dec 1, 1971

  • AUSIMM
    Continuing Professional Development for the Mining Industry - A Suggested Agenda for Action by the AusIMM

    By Pullen G, Rose M

    Continuing Professional Development (CPD) is not just a catch-cry. It is an essential component of every-day life in many professions, including accountancy, law and public administration. Without

    Jan 1, 1989

  • SME
    World Record Set In Poland: Cat Plow System Sets Mark From Single Face

    On Feb. 16, 2012, the Polish coal mining company Lubelski Wegiel Bogdanka S.A. set the world record for daily production from a plow-equipped longwall, with an output of 24.4 kt (26,900 st) of coal fr

    Jan 1, 2012

  • SAIMM
    Pit Wall Failures On ?Unknown? Structures (76621150-30cb-4052-b037-75f5ff3cf933)

    A number of impending and actual pit wall failures have been observed and documented, which have been interpreted to initiate on newly generated structural features. This infers failure through intact

    Jan 1, 2006

  • NIOSH
    Noise Exposure In Longwall Mining And Engineering Controls Research

    By E. R. Bauer

    Prolonged exposure to noise can cause permanent damage to the auditory nerve and/or its sensory components, known as noise induced hearing loss (NIHL). It is the most common occupational disease in t

    Jan 1, 2008

  • AUSIMM
    A Simple Coarse Batch Particle Sizer for Plant Use

    Using a cylindrical hydrocyclone with a long vortex finder as the separator, a batch sizer was developed for the fast comparative sizing of the coarse solids normally encountered in mineral pulps.Oper

    Jan 1, 1968

  • NIOSH
    RI 3570 Progress Reports - Metallurgical Division - 47. Mineral Physics Studies - Ferromagnetic Properties Of Hematite (035889a3-e932-4cbe-9475-4b4b8cdd15fa)

    By Earl T. Hayes

    [This work represents a continuation of the efforts of the Metallurgical Division of the Bureau of Mines to ascertain and apply knowledge of mineral physics to process metallurgy.]

    Jan 1, 1941

  • AUSIMM
    Preliminary Study on the Improvement of Afforestation Techniques Applied to Aggregate Mines in Japan

    Development of aggregate resources for use in structural concrete has been encouraged in Japan to support infrastructure improvement and national land conservation. Natural aggregate is a valuable res

    Dec 6, 2010

  • DFI
    Effect Of Pressurized Drilling Methods On The Lateral Load Capacity Of Drilled Shafts - A Practical Insight And An Analytical Approach

    By Özgür Bezgin

    This paper presents observations on the installation of drilled shafts from two construction projects and an academic study with experimental and analytical parts. The construction projects involved t

    Jan 1, 2009

  • DFI
    Innovations In Scandinavia

    By Carl-John Grävare

    This paper deals with some of the systems and equipment that are being developed and/or are in use in Scandinavia. The main subject is the development of loading tests on the piles using monitoring eq

    Jan 1, 2000

  • ISEE
    Concepts and Case Study for Regular Rhythmic Timing and Sequence

    By Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks

    "Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw

    Jan 1, 2016

  • AUSIMM
    Stope Filling at North Mount Lyell Mine

    IN the irregularly shaped ore-bodies of the North Mount Lyell mine by overhead stoping, the method of filling the is a special feature.The situation of the mine two miles from the smelter and mill at

    Jan 1, 1927

  • DFI
    Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? Synopsis

    By B. B. Broms

    The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method

    Jan 1, 2010

  • AUSIMM
    Automation of the Kimberley Nickel Mine Flotation Operation Using an Advanced Control System

    By J Knoblauch, D, P J. J Strobos, C Foggo

    The Sally Malay Project is located 120 km north of Halls Creek in the eastern Kimberley region. Since commissioning, ongoing improvements on the plant have resulted in recoveries now greatly exceeding

    Jan 1, 2006

  • CIM
    The Pogo project: flowsheet development and design

    By Eric Konigsmann

    "The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un

    Jan 1, 2002

  • SME
    Comparison of the Antimony Cementation from Chloride Media Using Various Cementators

    By Serdar Aktaş, Özgün Küçükoğlu, Burcu Nilgün Çetiner, Mehmet Hakan Morcalı

    This study compares the cementation performance of metallic iron, metallic aluminum, and metallic tin in terms of the reaction conditions and parameters in synthetic antimony chloride solutions. The e

    Jan 28, 2022