Search Documents

  • SME
    A 4.75m Contractor Manufactured EPB Machine

    By Bruce Richardson

    A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec

    Jan 1, 2008

  • ISEE
    CEE BEE ZERO TWO Construction to Destruction - A Case Study

    By Deepak Vidyarthi

    This paper deals with various measures adopted in protecting a conveyor duct (named after a Conveyor Belt that was numbered as ‘02’) housing a 1600 mm (63 inches) belt conveyor system in a large, heav

    Jan 1, 2008

  • SME
    Multi-Gravity Separator: An Alternate Gravity Concentrator To Process Coal Fines

    By A. K. Majumder

    The multi-gravity separator (MGS) is a novel piece of equipment for the separation of fine and ultra-fine minerals. However, the published literature does not demonstrate its use in the separation of

    Jan 1, 2007

  • SME
    DPI - Disputes Potential Index on the Predictability of Tunneling Project Contract Disputes

    By James Diekmann

    The Disputes Potential Index (DPI) is a computer program designed to help team mem¬bers assess the likelihood of contract disputes on a construction project. The program's predictions are based o

    Jan 1, 1995

  • AUSIMM
    Long-Hole Directional Drilling Applications at Huntly West Mine, New Zealand

    By D Vickers, N C. Fowke

    The reduction of geological risk for planning of high production longwall faces is essential. Geological and geophysical techniques applied at Huntly West Mine before 1989 were unable to reduce the ge

    Jan 1, 1991

  • DFI
    Comparison Of Dynamic And Static Methods Of Evaluating Static Pile Capacity - Synopsis

    By Harpal Parmar

    This paper evaluates dynamic methods of pile capacity prediction by comparing their results to static load test results. Dynamic and static pile load test data were assembled from four southeastern st

    Jan 1, 1996

  • AUSIMM
    Dynamic Testing of Combined Rock Bolt and Mesh Schemes

    By A G. Thompson, E Villaescusa, A De Zoysa, J R Player

    Ground support performance is critical to the safe and economical extraction of ore. This is particularly important for mass mining extractions at great depth, which are currently being considered by

    May 9, 2016

  • NIOSH
    RI 9657 - Recommendations For Testing Radar-Based Collision Warning Systems On Heavy Equipment

    By Todd M. Ruff

    Researchers at the National Institute for Occupational Safety and Health are investigating technologies that could be used to detect objects, small vehicles, and pedestrian workers that may be in the

    Jan 1, 2002

  • NIOSH
    RI 9072 - Continuous Flotation Testing To Recover Cobalt From Missouri Lead Ores

    By W. L. Cornell

    The Missouri lead ores are the only domestic sources of cobalt presently being mined and processed for other materials. They represent the best short-term solution for meeting up to 13 pct of the Nati

    Jan 1, 1987

  • AIME
    77. The Gabbs Magnesite-Brucite Deposit, Dye County, Nevada

    By John H. Schilling

    The Gabbs magnesite-brucite deposit is unique in size and is one of two magnesite deposits being exploited in the United States. It is near the town of Gabbs, which is one hundred miles southeast of R

    Jan 1, 1968

  • NIOSH
    RI 4200 Preparation Characteristics of Anthracites in the Santa River Valley, Peru

    By Thomas Fraser

    "INTRODUCTION The Santa River Valley of northern Peru contains extensive deposits of a good-grade anthracite that offer one of the most accessible sources of solid-fuel supply for South America. This

    Feb 1, 1948

  • SME
    Coal’s Role in Sustaining Society

    By R. Larry Grayson, Joel R. Warneke

    The mining industry has searched for a message that will resonate with the public while focusing on the industry’s positive contributions to society. So far, environmental groups remain unconvinced a

    Jan 1, 2006

  • NIOSH
    IC 7847 Bibliography Of Investment And Operating Costs For Chemical And Petroleum Plants July 1954 - December 1956 ? Introduction

    By Sidney Katell

    This report is the fourth in the series, Bibliography of Investment and Operating Costs for Chemical and Petroleum Plants. The initial work, Bureau of Mines In- formation Circular 7516, was published

    Jan 1, 1958

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • IOM3
    Long-team open-pit production scheduling through dynamic phase-bench sequencing

    By Qing Wang

    In this method the state of an open-pit mine is represented by the number of benches that are mined in each predesigned mining phase (or pushback). Consequently, a specific mining schedule can be repr

    Jul 1, 1996

  • DFI
    Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DC

    By Joseph C. Gillen

    This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d

    Jan 1, 2006

  • SAIMM
    Underground Extraction Of Contiguous Coal Seams/Sections Consisting Thin Parting: A Case Study

    By Rajendra Singh

    Underground depillaring of contiguous coal seams/sections is a difficult problem, which becomes even more complex if the interburden/parting between them is thin. Conventionally, the depillaring with

    Jan 1, 2004

  • CIM
    Economic Evaluation of Activated Carbon for Gold Milling Circuits

    By M. Drozd, M. Somppi, Z. Yamak

    "Granular activated carbon is widely used in the gold mining industry for gold extraction from aurocyanide-containing slurry. The extraction process can employ carbon as part of the gold recovery oper

    Jan 1, 2017

  • DFI
    Treated Round Wood Piling Specifications

    By James S. Graham

    Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a

    Jan 1, 1992

  • DFI
    Design, Construction and Monitoring of a Secant Pile Compression Ring

    By Jason Weck, Alper Turan, Ali Chehadeh

    "Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro

    Jan 1, 2014