Search Documents

  • CIM
    Energy Initiatives Ontario Operations

    Ontario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co

    May 1, 2007

  • DFI
    Statnamic Load Testing Of High Capacity Marine Foundations

    By Mike Muchard

    STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o

    Jan 1, 2005

  • NIOSH
    OFR-90-80 Factory Integration Of An Illumination System Into A Continuous Mining Machine

    By Bruce Rock

    A continuous mining machine was redesigned for the installation of an integrated illumination system. The illumination system was designed by first calculating the theoretical number of luminaires req

    Jan 1, 1979

  • AUSIMM
    Inpit Tailings Disposal, Marymia Gold Operation: Case History

    Inpit tailings disposal has been undertaken at a number of mining sites within Australia. This paper presents a brief history of the experience of inpit tailings disposal at the Marymia Gold Operation

    Jan 1, 1999

  • NIOSH
    RI 8715 Statistical Approach to the Analysis of Bias and Precision in Reusable Gas-Detecting Devices

    By R. Emmett Hughlett

    The Bureau of Mines has developed a statistical approach to the laboratory evaluation of response bias and precision in gas detectors. The techniques described employ a computerized analysis and a new

    Jan 1, 1982

  • AUSIMM
    The Effect of the Australian Carbon Trading Scheme on a Large Scale Open Pit Mining Operation

    The mining industry continues to be a major driver of the Australian economy generating over A$130 billion in export earnings in 2008/2009. However, the industry has been cited as a significant contri

    Dec 6, 2010

  • SME
    Modification Of Limestone-Based Material For Increased Efficiency Of Arsenic Removal From Water

    By A. D. Davis

    Limestone-based material shows great promise for removal of arsenic from water. In laboratory tests, it has removed more than 95% or arsenic and more than 99% of cadmium and lead. In addition, the w

    Jan 1, 2012

  • NIOSH
    RI 7892 Laboratory Experiments in Electrokinetic Densification of Mill Tailings (In Two Parts) 1. Development of Equipment and Procedures

    By R. H. Sprute

    This report describes Bureau of Mines laboratory test results in electrokinetic dewatering and consolidation of metal-mine tailings. Tailings were placed in 0.3-cubic-foot Plexiglass models, and dc po

    Jan 1, 1974

  • SAIMM
    Development and testing of a vehicle collision avoidance system based on GPS and wireless networks for open-pit mines

    By A. Nieto

    A vehicle proximity warning–collision avoidance system is being developed using GPS and wireless local area networks to improve safety of off-highway trucks in open pit mines. After two-and a-half yea

    Jan 1, 2003

  • AUSIMM
    Study on Flotation Experiment of Complex Copper-Lead-Zinc Polymetallic Sulfide Ore in High Altitude Area and its Industrial Application

    Study on Flotation Experiment of Complex Copper-Lead-Zinc Polymetallic Sulfide Ore in High Altitude Area and its Industrial Application

    Sep 13, 2010

  • AIME
    Institute of Metals Division - Analysis of a GaAs Laser

    By W. N. Carr, J. R. Biard, B. S. Reed

    An analysis of the semiconductor injection laser is presented which is based on a phenomenological model using device and material parameters. The intent of the laser threshold analysis is not to pred

    Jan 1, 1964

  • AUSIMM
    Influence of Grinding Media on the Flotation of Carbonate Using Sodium Oleate as Collector

    Influence of Grinding Media on the Flotation of Carbonate Using Sodium Oleate as Collector

    Sep 13, 2010

  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • SME
    Geopolymer-Based Concrete To Reduce Carbon Foot-Print Of Construction Industry

    By H. Akbari

    The ordinary Portland cement (OPC) is the key pozzalonic component of the concrete mix, widely used as the construction material world-wide. Billions of tons of OPC are used in the construction indust

    Feb 27, 2013

  • NIOSH
    IC 8802 Mine Power Systems Research (In Four Parts) 4. Transients And Enclosures

    This Bureau of Mines report concerns two subjects important in the application of electric power in mining systems. Electrical transients and their suppression are discussed, and several consideration

    Jan 1, 1979

  • NIOSH
    OFR-169-82 Guideline Manual For Front-End Loader Load -And-Carry Applications

    By James W. Martin

    This user's manual analyzes the application, selection and performance of front-end loaders in mining operations which can effectively utilize their load-and-carry capability. All aspects of the

    Jan 1, 1981

  • AUSIMM
    Contact Angle Measurements on Lignite Surface

    Contact Angle Measurements on Lignite Surface

    Sep 13, 2010

  • IIMP
    El banco minero y las crisis de la minería peruana

    By Nelson Rivera

    El presente texto analiza la crisis económica y su relación con el Banco Minero. Para ello, se revisa las dos últimas recesiones económicas que tuvo el Banco entre 1975 y 1982, donde la crisis se agu

    Mar 1, 1985

  • NIOSH
    OFR-136-84 Ultralightweight Oxygen Container

    By Ben Aleck

    The objective of this program was to adapt Space Shuttle technology on high-performance spherical pressure vessels to cylindrical pressure vessels. Specifically, a cylindrical aluminum liner overwrapp

    Jan 1, 1983

  • SME
    Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection tests

    By G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte

    Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes

    Jan 12, 1986