Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Slab-Buckle Failure in Weak Coal Mine Strata - The Malvern Hills Case Study of July 2004

    By D H. Bell

    Slab-buckle failures in coal sequences involve thin slab deformation in strata dipping parallel to the footwall, and are a consequence of both unloading and the weak nature of the thinly bedded rock m

    Jan 1, 2007

  • AUSIMM
    The Influence of Microstructure and Softening Characteristics of Zinc-Lead Sinter on the Operation of an Imperial Smelting Furnace

    By Shoobridge PH, Firkin GR

    The Imperial Smelting Process blast furnace (ISF) of the Sulphide Corporation Pty Limited zinc/lead smelter at Cockle Creek, New South wales, has in recent years greatly increased its consumption o

    Jan 1, 1980

  • AUSIMM
    An Excavating Power Model for Continuous Surface Miners

    By Kramadibrata S

    Over the years many attempts have been made to develop a means of assessing the excavatability of rock. Most of them are based on an empirical rating system while some authorities still propose the us

    Jan 1, 1995

  • AUSIMM
    Parameters Affecting the Shield Support Efficiency in Longwall Mining

    By Hsiung SM, Jiang YM

    The orientation and location of the hydraulic legs are two very important parameters for the design of shield supports in longwall mining. Studies have shown that leg orientations and locations of

    Jan 1, 1988

  • AUSIMM
    Recovery of Colloidal Gold from Oxidised Concentrate Wash Liquor

    The Fosterville Goldmine in Victoria employs bacterial oxidation (BIOX« Process) to liberate gold from its flotation concentrate. Gold occurrence is primarily as submicron particles in pyrite and arse

    Jan 1, 2009

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • AUSIMM
    A Proposed Standard for the Objective Measurement of Muck Pile Profiles

    Blast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us

    Jan 1, 1990

  • AUSIMM
    Explosives Performance - Who Needs to Know?

    The Australian bulk explosives industry has matured significantly over the last five years and it would appear that the rest of the world is following suit. This maturity is characterised by the te

    Jan 1, 1990

  • AUSIMM
    Venturi Scrubber System for Dust Control on a Longwall Face

    By Rao S. B, Baafi E. Y

    A venturi based multi-scrubber air cleaning system has been developed for dust control along a longwall face in coal mines. The system consists of a number of scrubbers. strategically placed along the

    Jan 1, 1995

  • AUSIMM
    An Assessment Of Swelling On Reduction Methods For Iron Ore Pellets

    An assessment has been made of six reported methods for the determination of the swelling of iron ore pellets on reduction. The methods are discussed on the basis of apparatus requirements, reducti

    Jan 1, 1974

  • AUSIMM
    Design and Development of Slurry Sampling Equipment for Mount Isa On-Stream Analysis Equipment

    By Wickham P, Raeburn M. R

    The design and development of slurry sampling equipment for the Mount Isa Mines Limited on stream analysis installations is discussed in detail. Emphasis is given to the critical areas of slurry t

    Jan 1, 1976

  • AUSIMM
    3D mine mapping – improving grade control and reconciliation in underground mines using photogrammetric imagery and implicit modelling techniques

    By R H. Knight

    Production mine geology must be accurate and efficient in order to reduce risk and ensure that ore value and mining operation revenue are maximised. Present grade control practices are commonly based

    Sep 20, 2017

  • AUSIMM
    Underground Downhole Geophysics at CSA Mine, Cobar

    By Erickson M. E, Smith C. K, Carswell J. T

    Thirteen holes totalling 3200m were surveyed using a downhole time domain Geonics EM37 system at the 830 metre level within the CSA Mine, Cobar, New South Wales, in order to search for blind, electric

    Jan 1, 1990

  • AUSIMM
    The Physico-Chemical Basis of Pyrometallurgical Processes

    A critical appraisal of the wide variety of processes used in the pyrometallurgical production of metals and non-metals shows that there is a strong physico-chemical and, in particular thermodynam

    Jan 1, 1987

  • AUSIMM
    Recent Advances in Base Metal Extraction

    By Batterham R. J

    Some developments in copper, lead and zinc extractive metallurgy which have gone in to production or seem to be close to production scale are described with emphasis on why these innovations have been

    Jan 1, 1992

  • AUSIMM
    Greenhouse Effects on Natural Catastrophes and Insurance

    INCREASE OF CATASTROPHE FREQUENCY AND SEVERITYIn the last couple of decades the frequency of natural catastrophes has increased dramatically. This realization results from the statistical analysis of

    Jan 1, 1990

  • AUSIMM
    Regional Geological Setting of the Woodlawn and Captains Flat Massive Sulphide Deposits, NSW, Australia

    By Abell RS, Wyborn D, Solomon M, Stuart-Smith PG, Henderson GAM

    The two major massive sulphide deposits in the Silurian rocks of southern NSW, Captains Flat and Woodlawn, differ from classical Kuroko deposits in several ways, e.g. they lie on the flanks of fe

    Jan 1, 1987

  • AUSIMM
    Development Of Equipment For Narrow Vein Mining

    Conventional narrow vein mining, utilising hand held methods, is expensive and requires specialised miners who are becoming a rarity. Hand held mining techniques (shrinkage stoping, leading stopin

    Jan 1, 1987

  • AUSIMM
    Application of Computer Assisted Modelling to Final Wall Blast Design

    By Jones J. P, Arriagada J, Scherpenisse C. R

    A recently-developed model is used as a tool to optimise the design of blasts used to create final walls in large open pit mines. The use of this tool has allowed present blasting practice and propo

    Jan 1, 1995

  • AUSIMM
    Resources of Mineral Sands, What of their Future?

    In 1985 BMR assessed Australia's economic demonstrated resources of mineral sands as follows: rutile 8.0 Mt, ilmenite 41.4 Mt, zircon 11.5 Mt, and monazite 229 000 tonnes. These resources are

    Jan 1, 1986